-
PTTEP South Asia Limited_Executive Summary of EIA Study for Exploration Drilling Campaign in Block MD-7 (Draft, 2019)
PTTEP publish this executive summary of EIA draft report (not full EIA report) on their website. The EIA is prepared for an exploration drilling campaign in offshore Block MD-7 ...
-
Myanmar Golden Point Family Co., Ltd._Environmental Management Plan for Gold Mining_TWT & TPK
According to the project type, the Environmental Management Plan (EMP) report is required. ECD makes the report available publicly on their website to get the comments from the ...
-
License of small scale mineral production for Shwe Sin Moe Co., Ltd.
Approval for small-scale gold extraction issued by the Ministry of Natural Resources and Environmental Conservation for the period from 4 Dec 2016 to 17 Jan 2017. But EMP is pre...
-
Shwe Sin Moe Co., Ltd._Initial Environmental Examination for Gold Mining_SHML-681
This Initial Environmental Examination Report is prepared to extend the period of the license of gold extraction in site: SHML-681 in Maing Kaing Village Tract, Homalin Township...
-
Maha Shwe Zabu Co., Ltd._Environmental Management Plan for Gold Mining_Plot KMS-13
This Environmental Management Plan (EMP) is prepared for the gold mining site: KMS-13 in Si Khan Gyi Village Tract, Mansi Township, Bhamo District, Kachin State, to reduce and ...
-
Yadanar Moe Myay Mining Co., Ltd._Initial Environmental Examination for Gold Mining_TPK-223
This IEE is prepared for gold mining site: TPK-223 of which area is 20 acres, in Thabeikkyin Township, Pyin Oo Lwin District, Mandalay Region, as per the instruction of Ministry...
-
Htoon Shwe Sin Mining Co., Ltd._Environmental Management Plan for Gold Mining_Plot: SGU-138(A)
The EMP report is prepared for the gold mining plot: SGU-138 in Singu Township, Pyin Oo Lwin District, Mandalay Region, to submit to the Environmental Conservation Department. T...
-
SN Power_ESIA of Middle Yeywa Hydropower Project
This Environmental and Social Impact Assessment Report (ESIA) is prepared by a combined team of international and national experts on behalf of SN Power, for the Middle Yeywa Hy...
-
Y Complex Co., Ltd._Environmental Impact Assessment for Y Complex Project
This report has been prepared by a third party, E Guard Environmental Services Co., Ltd. for Y Complex Co., Ltd. for the project of Y Complex Project located at Plot No. 11-A/15...
-
Wuxi Hua Guang (Myanmar) Co., Ltd._Environmental and Social Impact Assessment for Tigyit Coal Fired Power Plant
As per EIA Procedures (2015), this ESIA report for Tigyit coal-fired power plant (120 MW) to identify and evaluate the potential impacts from the operation of the power plant. T...
-
Mon Petrol Co., Ltd._Environmental Management Plan for Pre-construction of Oils, Fuels & LPG Terminal, and General Cargo Terminal
This EMP report is aimed to identify the major environmental impacts due to the implementation of the project along with the effective measures to mitigate the potential adverse...
-
Sun City Bago Industrial Land Development Ltd._Scoping Report for EIA of Sun City Project
This scoping report attached with a term of reference is prepared for Environmental Impact Assessment of the construction and leasing factory zones and factory complex project. ...
-
Great Golden Empire Co., Ltd._Environmental Management Plan to Find Sinking Logs in Chindwin River
This EMP is prepared for finding sinking logs in Chindwin River for 5 years (from 2019 to 2024). The project sites are located in Paungbyin, Mawlaik, Kalewa Townships along the ...
-
Awzar Shwe Pyae Mining Co., Ltd._Environmental Management Plan for Gold Mining SIte: SPLB-61
This EMP is prepared for gold mining site: SPLB-61 located in Maw Khwin Village Tract, Pinlebu Township, Kawlin District, Sagaing Region. The site area is 8.09 hectares.
-
Shwe Pyi Thar Gold Production & Refining Co., Ltd._Environmental Management Plan for Gold Mining Site: TPK-104
This is the revised EMP for the gold mining site: TPK-104 as per the ECD's comments on the first submitted EMP and it is for the second submission to ECD. The Project is located...
-
DWIR_ESIA Report on Twante Canal Improvement Project
This ESIA is prepared for Phase 1 of Twante Canal Improvement Project: Channel training & Flood embankment to be carried out by Directorate of Water Resources and Improvement of...
-
BASF Myanmar Manufacturing Co., Ltd._Environmental Impact Assessment for Manufacturing of Construction Chemical Admixture
This report has been prepared by the third party, E Guard Environmental Services Co., Ltd., for BASF Myanmar Manufacturing Co., Ltd. for the project of Manufacturing of Construc...
-
Shan Shwe Li Mining Co., Ltd._Environmental Management Plan for Gold Mining Site: SNNS-1
This EMP is prepared for Gold Mining Site: SNNS-1 of Shan Shwe Li Mining Co., Ltd. and it is the second version of the report. The site is located Kyauk Phyu Village Tract, Namh...
-
Nilar Lin Lat Co., Ltd._Environmental Management Plan for Gold Mining Site: MTY-1
This EMP is prepared for by third party, E Guard Environmental Services Co., Ltd. for Nilar Lin Latt Co., Ltd. for the project of Gold Mining located at Mandalay Region, Madaya ...
-
Myanmar Pongpipat Mining Co., Ltd._Scoping Report of EIA for Heinda Mine
This scoping report is prepared by Ever Green Tech Environmental Services and Training Co., Ltd for Myanmar Pongpipat Co., Ltd., for EIA of Heinda Mine in Heinda Village, Myitta...