{"help": "https://data.opendevelopmentmyanmar.net/my/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "resource_id": "f334ebc0-f17c-4f95-90e6-4b8729ac396b", "fields": [{"type": "int", "id": "_id"}, {"type": "varchar", "id": "fid"}, {"type": "int4", "id": "date_updat"}, {"type": "varchar", "id": "region"}, {"type": "varchar", "id": "country"}, {"type": "varchar", "id": "prov_state"}, {"type": "varchar", "id": "project"}, {"type": "varchar", "id": "rivers"}, {"type": "varchar", "id": "basin"}, {"type": "float4", "id": "latitude"}, {"type": "float4", "id": "longitude"}, {"type": "varchar", "id": "purpose"}, {"type": "varchar", "id": "numb_dams"}, {"type": "float4", "id": "capacity"}, {"type": "varchar", "id": "size"}, {"type": "varchar", "id": "turbines"}, {"type": "float4", "id": "dam_height"}, {"type": "varchar", "id": "res_elev"}, {"type": "varchar", "id": "res_area_k"}, {"type": "varchar", "id": "res_capmil"}, {"type": "varchar", "id": "certainty"}, {"type": "varchar", "id": "status"}, {"type": "varchar", "id": "china_ovrs"}, {"type": "int4", "id": "cost_us_m"}, {"type": "varchar", "id": "financier"}, {"type": "varchar", "id": "financier2"}, {"type": "varchar", "id": "financier3"}, {"type": "varchar", "id": "developer"}, {"type": "varchar", "id": "builder"}, {"type": "varchar", "id": "sionhydrob"}, {"type": "varchar", "id": "contractor"}, {"type": "varchar", "id": "operator"}, {"type": "varchar", "id": "risk_insr"}, {"type": "int4", "id": "start_date"}, {"type": "varchar", "id": "complet_da"}, {"type": "varchar", "id": "oper_date"}, {"type": "varchar", "id": "hist_notes"}, {"type": "varchar", "id": "trans_line"}, {"type": "varchar", "id": "approv_not"}, {"type": "varchar", "id": "mdb_risk_c"}, {"type": "varchar", "id": "mdb_loan_t"}, {"type": "varchar", "id": "mdb_status"}, {"type": "varchar", "id": "proj_desc"}, {"type": "varchar", "id": "resettl_ge"}, {"type": "varchar", "id": "resettl_pe"}, {"type": "varchar", "id": "resettl_ho"}, {"type": "varchar", "id": "local_name"}, {"type": "varchar", "id": "notes"}, {"type": "varchar", "id": "source"}, {"type": "int4", "id": "cartodb_id"}, {"type": "varchar", "id": "created_at"}, {"type": "varchar", "id": "updated_at"}, {"type": "geometry", "id": "the_geom"}], "records_format": "objects", "total_was_estimated": false, "records": [{"_id":0,"fid":"mekongdams.395","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Dahua Bridge","rivers":"","basin":"Lancang","latitude":26.3368,"longitude":99.1473,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":74,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000DAACFA5C6DC95840F54A598638563A40"},{"_id":1,"fid":"mekongdams.383","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xierhe Four","rivers":"","basin":"Lancang","latitude":25.5763,"longitude":100.0656,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":39,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000087A757CA320459404FAF946588933940"},{"_id":2,"fid":"mekongdams.368","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Little Bay","rivers":"","basin":"Lancang","latitude":24.705,"longitude":100.0914,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":52,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000AEB6627FD905594014AE47E17AB43840"},{"_id":3,"fid":"mekongdams.322","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Jinghong City","project":"Meng Song","rivers":"Lancang River","basin":"Mekong","latitude":21.78,"longitude":101.147,"purpose":"","numb_dams":"","capacity":600,"size":"","turbines":"","dam_height":0,"res_elev":"519","res_area_k":"","res_capmil":"","certainty":"","status":"Cancelled","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"230","resettl_ho":"","local_name":"","notes":"","source":"1st Summit of the Mekong River Comission: http://www.mrcsummit2010.org/Speech-of-Vice-Minister-Song-Tao.pdf http://ns1.mrcmekong.org/download/Presentations/2nd-BDP-reg-stakeholder-forum/3.1.1-Lancang-River-Hydropower.pdf\nhttp://www.reuters.com/article/20","cartodb_id":1,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C520B0726849594048E17A14AEC73540"},{"_id":4,"fid":"mekongdams.381","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Shaba","rivers":"","basin":"Lancang","latitude":25.5638,"longitude":100.0306,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":11,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007DD0B359F50159401C7C613255903940"},{"_id":5,"fid":"mekongdams.313","date_updat":0,"region":"Asia (SE)","country":"Lao PDR","prov_state":"","project":"Nam Ko","rivers":"","basin":"Mekong","latitude":20.78441,"longitude":102.11287,"purpose":"Hydropower","numb_dams":"","capacity":1.5,"size":"Large","turbines":"","dam_height":21,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"1996","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":255,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000DDEEE53E39875940C6A70018CFC83440"},{"_id":6,"fid":"mekongdams.323","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.78223,"longitude":100.4629,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":2,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000090D8EE1EA01D594038F3AB3940C83540"},{"_id":7,"fid":"mekongdams.325","date_updat":0,"region":"","country":"China","prov_state":"","project":"Ganlanba","rivers":"Lancang River","basin":"Mekong","latitude":21.84386,"longitude":100.93791,"purpose":"Hydropower","numb_dams":"","capacity":155,"size":"Large","turbines":"","dam_height":60.5,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"2015","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":3,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000A9A10DC0063C5940AF5E454607D83540"},{"_id":8,"fid":"mekongdams.326","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Jinghong City","project":"Gan Lan Ba","rivers":"Lancang River","basin":"Mekong","latitude":21.8614,"longitude":100.914,"purpose":"","numb_dams":"","capacity":155,"size":"","turbines":"","dam_height":0,"res_elev":"533","res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"58","resettl_ho":"","local_name":"","notes":"Sinohydro is the builder","source":"http://www.probeinternational.org/files/energypulse.pdf","cartodb_id":4,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000D122DBF97E3A59403FC6DCB584DC3540"},{"_id":9,"fid":"mekongdams.327","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xiaoganlanba","rivers":"","basin":"Lancang","latitude":21.8614,"longitude":100.914,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":5,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000D122DBF97E3A59403FC6DCB584DC3540"},{"_id":10,"fid":"mekongdams.328","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.91246,"longitude":100.78204,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":6,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000354415FE0C3259407DE882FA96E93540"},{"_id":11,"fid":"mekongdams.329","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.91831,"longitude":100.28307,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":7,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000005C5837DE1D125940FB96395D16EB3540"},{"_id":12,"fid":"mekongdams.330","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.92233,"longitude":100.96787,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":8,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000009C6B98A1F13D5940441669E21DEC3540"},{"_id":13,"fid":"mekongdams.331","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.9235,"longitude":100.93919,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":9,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000005DA626C11B3C594023DBF97E6AEC3540"},{"_id":14,"fid":"mekongdams.332","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":21.9327,"longitude":101.00561,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":10,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000002426A8E15B4059400C03965CC5EE3540"},{"_id":15,"fid":"mekongdams.382","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xierhe A","rivers":"","basin":"Lancang","latitude":25.5707,"longitude":100.1827,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":12,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000AB3E575BB10B5940C3D32B6519923940"},{"_id":16,"fid":"mekongdams.411","date_updat":0,"region":"","country":"China","prov_state":"","project":"Gushui","rivers":"Lancang River","basin":"Mekong","latitude":28.60868,"longitude":98.74613,"purpose":"Hydropower","numb_dams":"","capacity":2200,"size":"Large","turbines":"","dam_height":220,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":42,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000F19F6EA0C0AF584053B29C84D29B3C40"},{"_id":17,"fid":"mekongdams.333","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Jinghong City","project":"Jing Hong","rivers":"Lancang River","basin":"Mekong","latitude":22.0531,"longitude":100.767,"purpose":"","numb_dams":"","capacity":1750,"size":"","turbines":"","dam_height":0,"res_elev":"602","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"GMS Power (Thai)","financier2":"Yunnan Electric Power Group Corporation","financier3":"Yunnan Development and Investment Company","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Ecology: project cuts through Xishuangbanna national\nreserve. Huaneng working with Kate Lazarus and WWF to trial HSAP.","resettl_ge":"","resettl_pe":"1700","resettl_ho":"","local_name":"","notes":"Other estimates for expected migrants is 2264.","source":"http://finance.ifeng.com/roll/20090603/737536.shtml http://mekong.waterandfood.org/portal/whats-on/70-advancing-sustainable-hydropower","cartodb_id":13,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000000C022B8716315940E86A2BF6970D3640"},{"_id":18,"fid":"mekongdams.334","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.07276,"longitude":100.9498,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":14,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000081B1BE81C93C5940FB743C66A0123640"},{"_id":19,"fid":"mekongdams.335","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.08972,"longitude":100.92274,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":15,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C9737D1F0E3B594010CCD1E3F7163640"},{"_id":20,"fid":"mekongdams.336","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.10867,"longitude":100.92173,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":16,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007E6FD39FFD3A5940CA1649BBD11B3640"},{"_id":21,"fid":"mekongdams.337","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.36217,"longitude":99.6398,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":17,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000AEBCE47FF2E8584002A08A1BB75C3640"},{"_id":22,"fid":"mekongdams.338","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.49547,"longitude":100.78311,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":18,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000BB46CB811E3259402D26361FD77E3640"},{"_id":23,"fid":"mekongdams.339","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.53309,"longitude":101.12281,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":19,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000CB67791EDC475940BCCADAA678883640"},{"_id":24,"fid":"mekongdams.340","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Simao District of Pu'er City","project":"Nuo Zha Du","rivers":"Lancang River","basin":"Mekong","latitude":22.6344,"longitude":100.433,"purpose":"","numb_dams":"","capacity":5850,"size":"","turbines":"","dam_height":0,"res_elev":"812","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Approved by NDRC in 2011.","resettl_ge":"","resettl_pe":"43000","resettl_ho":"","local_name":"","notes":"","source":"Lancong-Mekong Initiative: http://mouthtosource.org/rivers/mekong/2011/04/20/lancang-mekong-initiative/ http://www.probeinternational.org/files/energypulse.pdf http://en.wikipedia.org/wiki/Nuozhadu_Dam","cartodb_id":20,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C1CAA145B61B59401895D40968A23640"},{"_id":25,"fid":"mekongdams.341","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Nuozadu","rivers":"","basin":"Lancang","latitude":22.6344,"longitude":100.433,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":21,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C1CAA145B61B59401895D40968A23640"},{"_id":26,"fid":"mekongdams.342","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.68866,"longitude":100.67061,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":22,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000CFD90242EB2A5940381092054CB03640"},{"_id":27,"fid":"mekongdams.343","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.72313,"longitude":100.95672,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":23,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000A65F22DE3A3D594008CA6DFB1EB93640"},{"_id":28,"fid":"mekongdams.344","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.75405,"longitude":100.98403,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":24,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000EB8D5A61FA3E5940DD94F25A09C13640"},{"_id":29,"fid":"mekongdams.345","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.75751,"longitude":101.06271,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":25,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000016C0948103445940F86C1D1CECC13640"},{"_id":30,"fid":"mekongdams.346","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.78458,"longitude":100.98343,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":26,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000083C3080F03E59407E18213CDAC83640"},{"_id":31,"fid":"mekongdams.347","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.9047,"longitude":99.91228,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":27,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000027F911BF62FA584052B9895A9AE73640"},{"_id":32,"fid":"mekongdams.348","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":22.9297,"longitude":99.91796,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":28,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000039807EDFBFFA5840FA0E7EE200EE3640"},{"_id":33,"fid":"mekongdams.349","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.13262,"longitude":99.23281,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":29,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000008AC91B60E6CE5840A7CB6262F3213740"},{"_id":34,"fid":"mekongdams.350","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.32182,"longitude":100.40717,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":30,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000001CB4571F0F1A59403F3BE0BA62523740"},{"_id":35,"fid":"mekongdams.351","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.33606,"longitude":100.32222,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":31,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007F87A2409F145940677E350708563740"},{"_id":36,"fid":"mekongdams.352","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.38498,"longitude":99.94528,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":32,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000D7DF12807FFC584094A5D6FB8D623740"},{"_id":37,"fid":"mekongdams.353","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.40733,"longitude":99.92282,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":33,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000F8C3CF7F0FFB584000AE64C746683740"},{"_id":38,"fid":"mekongdams.354","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.50264,"longitude":99.99322,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":34,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000333509DE90FF584054A9D903AD803740"},{"_id":39,"fid":"mekongdams.355","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.56181,"longitude":99.47984,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":35,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000BB0D6ABFB5DE5840D690B8C7D28F3740"},{"_id":40,"fid":"mekongdams.356","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.58236,"longitude":99.41619,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":36,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000EE7893DFA2DA58400188BB7A15953740"},{"_id":41,"fid":"mekongdams.357","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.7736,"longitude":100.62568,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":37,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000D1B2EE1F0B285940832F4CA60AC63740"},{"_id":42,"fid":"mekongdams.358","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":23.87127,"longitude":100.91389,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":38,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000554FE61F7D3A5940C504357C0BDF3740"},{"_id":43,"fid":"mekongdams.384","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Taurus Tun","rivers":"","basin":"Lancang","latitude":25.8043,"longitude":99.9125,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":40,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000006666666666FA58403D2CD49AE6CD3940"},{"_id":44,"fid":"mekongdams.385","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Miao Tail","rivers":"","basin":"Lancang","latitude":25.8546,"longitude":99.1739,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":41,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000009031772D21CB58405F29CB10C7DA3940"},{"_id":45,"fid":"mekongdams.378","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Gongguoqiao","rivers":"","basin":"Lancang","latitude":25.5502,"longitude":99.3445,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":62,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000355EBA490CD658405B423EE8D98C3940"},{"_id":46,"fid":"mekongdams.379","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xierhe Three","rivers":"","basin":"Lancang","latitude":25.5586,"longitude":100.108,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":63,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000F4FDD478E9065940AC8BDB68008F3940"},{"_id":47,"fid":"mekongdams.387","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Long Yap","rivers":"","basin":"Lancang","latitude":26.0067,"longitude":99.777,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"NoData","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":66,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007D3F355EBAF1584019E25817B7013A40"},{"_id":48,"fid":"mekongdams.380","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xierhe Two","rivers":"","basin":"Lancang","latitude":25.5619,"longitude":100.1313,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":64,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000BF7D1D3867085940569FABADD88F3940"},{"_id":49,"fid":"mekongdams.407","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Deqin County","project":"Guo Nian","rivers":"Lancang River","basin":"Mekong","latitude":28.32,"longitude":98.867,"purpose":"","numb_dams":"","capacity":1200,"size":"","turbines":"","dam_height":0,"res_elev":"2080","res_area_k":"","res_capmil":"","certainty":"","status":"Suspended","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"2970","resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":86,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000736891ED7CB7584052B81E85EB513C40"},{"_id":50,"fid":"mekongdams.359","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Jingdong Yizu County","project":"Da Chao Shan","rivers":"Lancang River","basin":"Mekong","latitude":24.0249,"longitude":100.3703,"purpose":"","numb_dams":"","capacity":1350,"size":"","turbines":"","dam_height":0,"res_elev":"899","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"State Development and Investment Corporation","financier2":"Hongta Group","financier3":"Yunnan Development and Investment Company, Yunnan Electric Power Group Corporation, China Huaneng Group, CDB, ADB funded transmission line","developer":"SDIC Yunnan Dachaoshan Hydropower Co.,","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Ecology: downstream impacts to fisheries, erosion, far-reaching impacts for lower SE Asian countries. Social: lack of adequate compensation, problems with food security and increased incidence of disease.","resettl_ge":"","resettl_pe":"5200","resettl_ho":"","local_name":"","notes":"Inconsistency in dam height between this spreadsheet and the Major Dams China Wikipedia spreadsheet (111 m). Other estimates for expected migrants is 6052","source":"http://www.chinawater.net.cn/icold2000/st-a5-01.html http://www.chincold.org.cn/dams/rootfiles/2010/07/20/1279253973998192-1279253974002813.pdf http://in.china-embassy.org/eng/szyss/jm/zhongguonongye/Water%20Conservancy/t144255.htm http://www.probeintern","cartodb_id":43,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000005D6DC5FEB21759409FABADD85F063840"},{"_id":51,"fid":"mekongdams.360","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Dachaoshan","rivers":"","basin":"Lancang","latitude":24.0249,"longitude":100.3703,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":44,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000005D6DC5FEB21759409FABADD85F063840"},{"_id":52,"fid":"mekongdams.361","date_updat":0,"region":"","country":"China","prov_state":"","project":"Dachaoshan","rivers":"Lancang River","basin":"Mekong","latitude":24.02494,"longitude":100.3703,"purpose":"Hydropower","numb_dams":"","capacity":1350,"size":"Large","turbines":"","dam_height":110,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"2003","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":45,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000005D6DC5FEB2175940BC5CC47762063840"},{"_id":53,"fid":"mekongdams.362","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Under Fu","rivers":"","basin":"Xijiang","latitude":24.0799,"longitude":100.8076,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":46,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000F90FE9B7AF3359404DF38E5374143840"},{"_id":54,"fid":"mekongdams.363","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Zhaoping","rivers":"","basin":"Xijiang","latitude":24.2054,"longitude":100.8194,"purpose":"","numb_dams":"","capacity":0,"size":"Small","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":47,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000EA95B20C7134594031992A1895343840"},{"_id":55,"fid":"mekongdams.364","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":24.437,"longitude":99.85931,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":48,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000006CD097DEFEF658401D5A643BDF6F3840"},{"_id":56,"fid":"mekongdams.365","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":24.45059,"longitude":100.08881,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":49,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000535BEA20AF05594096E7C1DD59733840"},{"_id":57,"fid":"mekongdams.366","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Jingdong Yizu County","project":"Man Wan","rivers":"Lancang River","basin":"Mekong","latitude":24.6222,"longitude":100.4489,"purpose":"","numb_dams":"","capacity":1550,"size":"","turbines":"","dam_height":0,"res_elev":"994","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"Department of Water Resources, Yunnan Province","financier2":"","financier3":"","developer":"Yunnan Electric Power Industry Bureau","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Ecology: downstream impacts to fisheries, erosion, far-reaching impacts for lower SE Asian countries. Social: lack of adequate compensation, problems with food security and increased incidence of disease.","resettl_ge":"","resettl_pe":"3042","resettl_ho":"","local_name":"","notes":"","source":"http://www.probeinternational.org/files/energypulse.pdf                                             http://in.china-embassy.org/eng/szyss/jm/zhongguonongye/Water%20Conservancy/t144255.htm","cartodb_id":50,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000029CB10C7BA1C59403A92CB7F489F3840"},{"_id":58,"fid":"mekongdams.367","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Manwan","rivers":"Lancang River","basin":"Mekong","latitude":24.624582,"longitude":100.44625,"purpose":"","numb_dams":"","capacity":920,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":51,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C3F5285C8F1C594038A3E6ABE49F3840"},{"_id":59,"fid":"mekongdams.369","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Nanjian Yi Autonomous County","project":"Xiao Wan","rivers":"Lancang River","basin":"Mekong","latitude":24.705,"longitude":100.0914,"purpose":"","numb_dams":"","capacity":4200,"size":"Large","turbines":"","dam_height":292,"res_elev":"1240","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"Yunnan Electric Power Group Corporation","financier2":"Yunnan Development andInvestment Company","financier3":"Yunnan Hongta Industrial Company Ltd.","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"In an article dated May 28, 2009, International Probe cited a UN Report from May 21 of that year that stated that Xiaowan Dam alone is capable of reducing the water volume and running speed, lowering water quality and biodiversity of areas downstream on","resettl_ge":"","resettl_pe":"28748","resettl_ho":"","local_name":"","notes":"Other estimates for expected migrants is 32737","source":"http://www.probeinternational.org/mekong-utility-watch/un-says-china-dams-threaten-water-supplies-mekong-delta-farmers http://www.probeinternational.org/files/energypulse.pdf","cartodb_id":53,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000AEB6627FD905594014AE47E17AB43840"},{"_id":60,"fid":"mekongdams.370","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":24.88948,"longitude":99.64238,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":54,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000B0E600C11CE95840D369DD06B5E33840"},{"_id":61,"fid":"mekongdams.371","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":25.29457,"longitude":99.28724,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":55,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000B0C8AF1F62D258409B594B01694B3940"},{"_id":62,"fid":"mekongdams.372","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Xu Village","rivers":"","basin":"Lancang","latitude":25.4217,"longitude":99.9933,"purpose":"","numb_dams":"","capacity":0,"size":"Small","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":56,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007AC7293A92FF584024B9FC87F46B3940"},{"_id":63,"fid":"mekongdams.373","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":25.4219,"longitude":99.99325,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":57,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000050340F6091FF5840B22E6EA3016C3940"},{"_id":64,"fid":"mekongdams.374","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":25.49534,"longitude":100.33083,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":58,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000001DC2C5E2C15594090662C9ACE7E3940"},{"_id":65,"fid":"mekongdams.375","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"When Floor","rivers":"","basin":"Lancang","latitude":25.5052,"longitude":99.988,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":59,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000AC1C5A643BFF58406FF085C954813940"},{"_id":66,"fid":"mekongdams.376","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Sunningdale","rivers":"","basin":"Lancang","latitude":25.5291,"longitude":100.0058,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":60,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000004694F6065F0059404850FC1873873940"},{"_id":67,"fid":"mekongdams.377","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Yunlong County","project":"Gong Guo Qiao","rivers":"Lancang River","basin":"Mekong","latitude":25.5502,"longitude":99.3445,"purpose":"","numb_dams":"","capacity":900,"size":"","turbines":"","dam_height":0,"res_elev":"1307","res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Gongguoqiao is unliekly to be a sustainable project, has poor additionality and feasibility arguments in the PDD, and does not meet the criteria of the world comisssion on dams, with which projects seeking approval by the swiss government (a project part","resettl_ge":"","resettl_pe":"4596","resettl_ho":"","local_name":"","notes":"This dam is part of the UN's Clean Development Mechanism (CDM) Program. Sinohydro is the builder.","source":"http://www.probeinternational.org/mekong-utility-watch/un-says-china-dams-threaten-water-supplies-mekong-delta-farmers UN CDM Reports: http://cdm.unfccc.int/Projects/Validation/DB/YHK3P49SQB7TBBT9H4W13Q49YZLKY1/view.html","cartodb_id":61,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000355EBA490CD658405B423EE8D98C3940"},{"_id":68,"fid":"mekongdams.386","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Yunlong County","project":"Miao Wei","rivers":"Lancang River","basin":"Mekong","latitude":25.8546,"longitude":99.1739,"purpose":"","numb_dams":"","capacity":1400,"size":"","turbines":"","dam_height":0,"res_elev":"1408","res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"11036","resettl_ho":"","local_name":"","notes":"Sinohydro is the builder","source":"http://probeinternational.org/mekong-utility-watch/yunnan-prefecture-promotes-lancang-hydro-development http://en.wikipedia.org/wiki/List_of_major_power_stations_in_Yunnan","cartodb_id":65,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000009031772D21CB58405F29CB10C7DA3940"},{"_id":69,"fid":"mekongdams.388","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Black Tree Ridge","rivers":"","basin":"Lancang","latitude":26.0755,"longitude":99.7576,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"NoData","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":67,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000C6DCB5847CF0584017D9CEF753133A40"},{"_id":70,"fid":"mekongdams.389","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Zibihe","rivers":"Trib. Yangbi Jiang","basin":"Mekong","latitude":26.137083,"longitude":99.95458,"purpose":"Irrigation","numb_dams":"","capacity":93.2,"size":"Small","turbines":"","dam_height":-99,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":68,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000053944BE317FD58406BD619DF17233A40"},{"_id":71,"fid":"mekongdams.390","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Noboru Village","rivers":"","basin":"Lancang","latitude":26.1579,"longitude":99.7855,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":69,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000083C0CAA145F25840D50968226C283A40"},{"_id":72,"fid":"mekongdams.391","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Yonago Ping","rivers":"","basin":"Lancang","latitude":26.1838,"longitude":99.7945,"purpose":"","numb_dams":"","capacity":0,"size":"Small","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":70,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000022B8716D9F258403B014D840D2F3A40"},{"_id":73,"fid":"mekongdams.392","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Hejiang","rivers":"","basin":"Lancang","latitude":26.2494,"longitude":99.8198,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":71,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000B1506B9A77F45840569FABADD83F3A40"},{"_id":74,"fid":"mekongdams.2","date_updat":0,"region":"Asia (SE)","country":"Cambodia","prov_state":"","project":"Unknown","rivers":"","basin":"Mekong","latitude":11.57321,"longitude":104.52529,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":120,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000008578245E9E215A40F67AF7C77B252740"},{"_id":75,"fid":"mekongdams.393","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Haixihai","rivers":"Trib. Yangbi Jiang","basin":"Mekong","latitude":26.29125,"longitude":99.97708,"purpose":"Irrigation","numb_dams":"","capacity":61.9,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":72,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000909E228788FE5840C3F5285C8F4A3A40"},{"_id":76,"fid":"mekongdams.417","date_updat":0,"region":"","country":"China","prov_state":"","project":"Rumei","rivers":"Lancang River","basin":"Mekong","latitude":29.64993,"longitude":98.3477,"purpose":"Hydropower","numb_dams":"","capacity":3000,"size":"Large","turbines":"","dam_height":315,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":95,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000003EB0E3BF40965840D4B837BF61A63D40"},{"_id":77,"fid":"mekongdams.394","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Yunlong County","project":"Da Hua Qiao","rivers":"Lancang River","basin":"Mekong","latitude":26.3368,"longitude":99.1473,"purpose":"","numb_dams":"","capacity":900,"size":"","turbines":"","dam_height":0,"res_elev":"1479","res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"According to wikipedia total installed capacity is 900  . Sinohydrois the builder","source":"http://articles.businessinsider.com/2011-09-06/markets/30127329_1_hydropower-yellow-river-jinsha-river http://en.wikipedia.org/wiki/List_of_major_power_stations_in_Yunnan","cartodb_id":73,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000DAACFA5C6DC95840F54A598638563A40"},{"_id":78,"fid":"mekongdams.396","date_updat":0,"region":"","country":"China","prov_state":"","project":"Dahuaqiao","rivers":"Lancang River","basin":"Mekong","latitude":26.3389,"longitude":99.14611,"purpose":"Hydropower","numb_dams":"","capacity":900,"size":"Large","turbines":"","dam_height":106,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":75,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007FA5F3E159C95840499D8026C2563A40"},{"_id":79,"fid":"mekongdams.397","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Cai Dam","rivers":"","basin":"Lancang","latitude":26.4044,"longitude":99.8747,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Operational","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":76,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000EB73B515FBF758409D8026C286673A40"},{"_id":80,"fid":"mekongdams.398","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Lanping Bai and Pumi Autonomous County","project":"Huang Deng","rivers":"Lancang River","basin":"Mekong","latitude":26.5468,"longitude":99.1037,"purpose":"","numb_dams":"","capacity":1900,"size":"","turbines":"","dam_height":0,"res_elev":"1619","res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"4415","resettl_ho":"","local_name":"","notes":"Sinohydro is the builder","source":"http://www.ecn.nl/docs/library/report/2003/c03027.pdf http://blogs.ei.columbia.edu/2011/05/19/the-push-to-dam-china%E2%80%99s-rivers/ http://zh.wikipedia.org/wiki/File:Huangdeng_Hydropower_Station_under_construction.jpg","cartodb_id":77,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000018265305A3C65840EB73B515FB8B3A40"},{"_id":81,"fid":"mekongdams.399","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Huang Teng","rivers":"","basin":"Lancang","latitude":26.5468,"longitude":99.1037,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":78,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000018265305A3C65840EB73B515FB8B3A40"},{"_id":82,"fid":"mekongdams.400","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Unknown","rivers":"Lancang River","basin":"Mekong","latitude":26.55353,"longitude":99.74132,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":79,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000EA7B0DC171EF5840D95A5F24B48D3A40"},{"_id":83,"fid":"mekongdams.401","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Manitoba","rivers":"","basin":"Lancang","latitude":27.193,"longitude":99.104,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":80,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000002DB29DEFA7C65840C520B07268313B40"},{"_id":84,"fid":"mekongdams.402","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Weixi Lisu Autonomous County","project":"Tuo Ba","rivers":"Lancang River","basin":"Mekong","latitude":27.193,"longitude":99.104,"purpose":"","numb_dams":"","capacity":1250,"size":"","turbines":"","dam_height":0,"res_elev":"1735","res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"5951","resettl_ho":"","local_name":"","notes":"This dam was part of a two part project that includes the construction of the Hongjiang hydropower plant. Sinohydro is the builder","source":"Hydrochina Website Tuoba Page: http://en.msdi.cn/showArticle.aspx?id=110 http://www.bentley.com/en-US/Community/BE+Awards/power+generation.htm","cartodb_id":81,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000002DB29DEFA7C65840C520B07268313B40"},{"_id":85,"fid":"mekongdams.403","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Weixi Lisu Autonomous County","project":"Li Di","rivers":"Lancang River","basin":"Mekong","latitude":27.5024,"longitude":99.0201,"purpose":"","numb_dams":"","capacity":420,"size":"","turbines":"","dam_height":0,"res_elev":"1819.500000","res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":"575","resettl_ho":"","local_name":"","notes":"Sinohydro is the builder","source":"http://en.wikipedia.org/wiki/List_of_major_power_stations_in_Yunnan http://groups.google.com/group/Lancang-Mekong/browse_thread/thread/c6eb324999415fca http://groups.google.com/group/lancang-mekong/msg/967b28891da99d64","cartodb_id":82,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000093A9825149C15840AA8251499D803B40"},{"_id":86,"fid":"mekongdams.404","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"In The End","rivers":"","basin":"Lancang","latitude":27.855,"longitude":99.013,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":83,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E610000046B6F3FDD4C058407B14AE47E1DA3B40"},{"_id":87,"fid":"mekongdams.405","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Wunonglong","rivers":"Lancang River","basin":"Mekong","latitude":27.87322,"longitude":99.00011,"purpose":"Hydropower","numb_dams":"","capacity":960,"size":"Large","turbines":"","dam_height":136.5,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":84,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000000B60CAC001C058408F368E588BDF3B40"},{"_id":88,"fid":"mekongdams.406","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Orchard Lane Dragon","rivers":"","basin":"Lancang","latitude":27.926,"longitude":98.9167,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":85,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000910F7A36ABBA5840931804560EED3B40"},{"_id":89,"fid":"mekongdams.408","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"If Read","rivers":"","basin":"Lancang","latitude":28.32,"longitude":98.867,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Cancelled","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":87,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000736891ED7CB7584052B81E85EB513C40"},{"_id":90,"fid":"mekongdams.409","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Ancient Water","rivers":"","basin":"Lancang","latitude":28.6069,"longitude":98.7464,"purpose":"","numb_dams":"","capacity":0,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":88,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000006F8104C5AF584041F163CC5D9B3C40"},{"_id":91,"fid":"mekongdams.410","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Yunnan Province, Deqin County","project":"Gu Shui","rivers":"Lancang River","basin":"Mekong","latitude":28.6069,"longitude":98.7464,"purpose":"","numb_dams":"","capacity":2600,"size":"","turbines":"","dam_height":0,"res_elev":"2340","res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Started pre-feasiblity studies","resettl_ge":"","resettl_pe":"3776","resettl_ho":"","local_name":"","notes":"","source":"http://eng.greensos.cn/ShowArticle.aspx?articleId=981http://www.tibet3.com/news/content/2011-01/18/content_439558.htm","cartodb_id":89,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000006F8104C5AF584041F163CC5D9B3C40"},{"_id":92,"fid":"mekongdams.412","date_updat":0,"region":"","country":"China","prov_state":"","project":"Guxue","rivers":"Lancang River","basin":"Mekong","latitude":29.18295,"longitude":98.6067,"purpose":"Hydropower","numb_dams":"","capacity":2800,"size":"Large","turbines":"","dam_height":310,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":90,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000003465A71FD4A65840FED5E3BED52E3D40"},{"_id":93,"fid":"mekongdams.413","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Tibet, Markam County","project":"Gu Xue","rivers":"Lancang River","basin":"Mekong","latitude":29.183,"longitude":98.607,"purpose":"","numb_dams":"","capacity":2400,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"http://www.sdfgw.gov.cn/art/2012/8/8/art_420_116770.html","cartodb_id":91,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000022B8716D9A65840022B8716D92E3D40"},{"_id":94,"fid":"mekongdams.414","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"Old School","rivers":"","basin":"Lancang","latitude":29.183,"longitude":98.607,"purpose":"","numb_dams":"","capacity":240,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":92,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000022B8716D9A65840022B8716D92E3D40"},{"_id":95,"fid":"mekongdams.415","date_updat":0,"region":"Asia (E)","country":"China","prov_state":"","project":"If The United States","rivers":"","basin":"Lancang","latitude":29.648,"longitude":98.3477,"purpose":"","numb_dams":"","capacity":240,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Under Construction","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":93,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000006E3480B740965840D9CEF753E3A53D40"},{"_id":96,"fid":"mekongdams.3","date_updat":0,"region":"Asia (SE)","country":"Cambodia","prov_state":"","project":"Unknown","rivers":"","basin":"Mekong","latitude":11.57321,"longitude":104.52529,"purpose":"Unknown","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Unknown","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"Unknown","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":121,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000008578245E9E215A40F67AF7C77B252740"},{"_id":97,"fid":"mekongdams.416","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Tibet, Markam County","project":"Ru Mei","rivers":"Lancang River","basin":"Mekong","latitude":29.648,"longitude":98.3477,"purpose":"","numb_dams":"","capacity":2400,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"Started pre-feasibility studies","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"Lancong-Mekong Initiative: http://mouthtosource.org/rivers/mekong/2011/04/20/lancang-mekong-initiative/ http://www.probeinternational.org/files/energypulse.pdf http://en.wikipedia.org/wiki/Nuozhadu_Dam","cartodb_id":94,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000006E3480B740965840D9CEF753E3A53D40"},{"_id":98,"fid":"mekongdams.96","date_updat":0,"region":"Asia (SE)","country":"Vietnam","prov_state":"","project":"Dak Pla","rivers":"","basin":"Mekong","latitude":14.32897,"longitude":108.07041,"purpose":"","numb_dams":"","capacity":0,"size":"NoData","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"","financier2":"","financier3":"","developer":"","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"","cartodb_id":423,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E61000007689EAAD81045B40F1BA7EC16EA82C40"},{"_id":99,"fid":"mekongdams.418","date_updat":41310,"region":"Asia (E)","country":"China","prov_state":"Tibet, Zogang County","project":"Ban Da","rivers":"Lancang River","basin":"Mekong","latitude":30.2,"longitude":97.934,"purpose":"","numb_dams":"","capacity":1000,"size":"","turbines":"","dam_height":0,"res_elev":null,"res_area_k":"","res_capmil":"","certainty":"","status":"Planned","china_ovrs":"","cost_us_m":0,"financier":"China Huaneng Group","financier2":"","financier3":"","developer":"China Huaneng Lancang River Hydropower Company","builder":"","sionhydrob":"","contractor":"","operator":"","risk_insr":"","start_date":0,"complet_da":"NoData","oper_date":"","hist_notes":"","trans_line":"","approv_not":"","mdb_risk_c":"","mdb_loan_t":"","mdb_status":"","proj_desc":"","resettl_ge":"","resettl_pe":null,"resettl_ho":"","local_name":"","notes":"","source":"http://www.sdfgw.gov.cn/art/2012/8/8/art_420_116770.html","cartodb_id":96,"created_at":"2015-07-13T18:12:22Z","updated_at":"2015-07-13T18:12:22Z","the_geom":"0101000020E6100000B29DEFA7C67B58403333333333333E40"}], "limit": 100, "_links": {"start": "/api/3/action/datastore_search?resource_id=f334ebc0-f17c-4f95-90e6-4b8729ac396b", "next": "/api/3/action/datastore_search?offset=100&resource_id=f334ebc0-f17c-4f95-90e6-4b8729ac396b"}, "total": 440, "total_estimation_threshold": null}}