﻿_id	STT	SITES	Warning po	Locality	Y	X	Warning_le	Describe	LONG (m)	Featured	Region	Note	level	the_geom
0	1	Human Hue Chi Linh, Hai Duong	K1-K1 + 950 + 550 (Human Hue Chi Linh, Hai Duong)	Human Hue Chi Linh, Hai Duong	21.08346	106.32191	Featuring dangerous no layout or design capital	Score's landslides Commune Hue Chi Linh District, Hai Duong Province-K1 K1 + 650 + 750 Description Kinh Thay, 2016 landslide passage 400m long, 2.5m wide, 2.5m deep, affecting 9,200 hectares, 70 760 people	400	River bank	Northern	Proposed new support	4	0101000020E61000005890662C9A945A402F8672A25D153540
1	2	Thanh Quang, Nam Sach, Hai Duong	K8-K9 + 870 + 690 + 949-K10 and K9 + 300 (Thanh Quang, Nam Sach, Hai Duong)	Thanh Quang, Nam Sach, Hai Duong	21.06207	106.36371	Featuring dangerous no layout or design capital	Paragraph 2015 landslide 1531m long, 5m wide, 2.5m deep, affecting 25 848 ha, 266 017 people	1531	River bank	Northern	Proposed new support	4	0101000020E61000009ACE4E0647975A400E10CCD1E30F3540
2	3	Minh Tan, Nam Sach Hai Duong province	K19 + K19 + 249-367 (Ming Tan, Nam Sach Hai Duong province)	Minh Tan, Nam Sach Hai Duong province	20.97159	106.29291	The normal point	Erosion downstream embankment Minh Tan Hung Thang, Nam Sach K19-K19 + 367 + 249 Description Pacific, paragraph 2017 landslide 110m long, 10m wide, 5m deep, affecting 25 848 ha, 266 017 people	110	River bank	Northern		1	0101000020E6100000F8AA9509BF925A40E21E4B1FBAF83440
3	4	Avalanche incidents in the area of ??the Red River, Bach Dang Ward, Hai Ba Trung District	K68 + 880 (Incident landslides in the area of ??the Red River, Bach Dang Ward, Hai Ba Trung District)	Bach Dang Ward, Hai Ba Trung District	21.01351	105.86643	The normal point	Provide erosion 15m length, 3m deep into the shore, do 01 times the sliding away of the river, particularly dangerous threat to 07 households.	15	River bank	Northern		1	0101000020E61000007D91D09673775A40412B306475033540
4	5	Moc Bac commune in Duy Tien district, Ha Nam province	K117 + 950-K118 (Jupiter Northern Affairs Duy Tien district, Ha Nam province)	Moc Bac commune in Duy Tien district, Ha Nam province	20.70153	106.00178	The normal point	Time: 2000-2017 Length 50m, 3m wide Loss of agricultural land	50	River bank	Northern		1	0101000020E61000005C72DC291D805A40B329577897B33440
5	6	Landslides upstream dike Bottoms Tan Thanh Thanh Liem district, Ha Nam province	K124 + 900-K124 + 930 (landslide upstream dike Bottoms Tan Thanh Thanh Liem district, Ha Nam province)	Tan Thanh Commune, Thanh Liem district, Ha Nam province	20.4493	105.90011	The danger point	Landslides upstream dike Day, was sat 2 bow slides: The first supply 11m long, 3.3 m wide, 1.6 m deep; 2nd Supply 12m long, 4m wide, 1.5m deep.	30	River bank	Northern		2	0101000020E61000005D33F9669B795A40C217265305733440
6	7	Embankment At Thien Thien Commune rebels, Tien Lu	K0 + 700 - K3 + 100 (Ta Boiled)	Embankment At Thien Thien Commune rebels, Tien Lu	20.64242	106.114	The danger point		2400	River bank	Northern		2	0101000020E61000009EEFA7C64B875A40DC4B1AA375A43440
7	8	Who do painting, Hien Nam precinct, Hung Yen city	K121 + 700 - K125 + 000 (Ke Lam paints, Hien Nam precinct, Hung Yen town)	Who do painting, Hien Nam precinct, Hung Yen city	20.65959	106.03742	The normal point	Lamson embankment erosion, Hien Nam precinct, Hung Yen city K121 + 700 - K125 + 000 Description Hong landslide at position C132-C136 from Lamson embankment with a length of about 85 m, 8-10 m deep erosion falling on top of the embankment . Affect the saf	85	River bank	Northern		1	0101000020E6100000D80DDB1665825A40C6C4E6E3DAA83440
8	9	Phu Hung Cuong embankment, city Hung Yen	K114 + 000 - K121 + 500 (K� Phu Hung Cuong, Hung Yen town)	Phu Hung Cuong embankment, city Hung Yen	20.69095	106.02723	Featuring dangerous no layout or design capital	Length: 7500 meters	7500	River bank	Northern	Proposed new support	4	0101000020E610000016DEE522BE815A40D42B6519E2B03440
9	10	Mai Dong commune, Kim Dong district	K109 + 320 (Ta Hong)	Mai Dong commune, Kim Dong district	20.72754	105.67702	The danger point		50	River bank	Northern		2	0101000020E61000003AAFB14B546B5A402788BA0F40BA3440
10	11	Village Pour embankment, Ben Thuy Ward, Vinh City	K93 + 000 - K94 + 500 (dike Lam)	Village Pour embankment, Ben Thuy Ward, Vinh City	18.66572	105.71275	The danger point		1500	River bank	Northern		2	0101000020E6100000560E2DB29D6D5A400A4B3CA06CAA3240
11	12	Recommended Huu Day, Khanh Trung commune, Yen Khanh district, Ninh Binh	K50 + 400 - K51 + 000 (De Huu Day, Khanh Trung commune, Yen Khanh district, Ninh Binh)	Recommended Huu Day, Khanh Trung commune, Yen Khanh district, Ninh Binh	20.21301	106.15239	Featuring dangerous no layout or design capital	Beach eroded sharply, losing agricultural land of farmers. The process of erosion is rising over time	600	River bank	Northern	Proposed new support	4	0101000020E6100000328FFCC1C0895A4091B8C7D287363440
12	13	Dyke Huu Day, Cong Khanh commune, Yen Khanh district, Ninh Binh	K56 + 200 - K57 + 000 (dike Huu Day, Cong Khanh commune, Yen Khanh district, Ninh Binh)	Dyke Huu Day, Cong Khanh commune, Yen Khanh district, Ninh Binh	20.20027	106.15718	Featuring dangerous no layout or design capital	Beach eroded sharply, losing agricultural land of farmers. The process of erosion is rising over time	800	River bank	Northern	Proposed new support	4	0101000020E610000075E5B33C0F8A5A40B35E0CE544333440
13	14	Nanhai embankment, Kien Thuy District	K8 + 877-K9 + 100 (Recommended Nanhai Sea II Embankment, Kien Thuy district) (Ke Nanhai)	Nanhai embankment, Kien Thuy District	20.69085	106.69712	The danger point	Erosion from 2014 to nay..Chieu long 223m..Anh landslides affect aquaculture	223	River bank	Northern		2	0101000020E6100000CD58349D9DAC5A400D71AC8BDBB03440
14	15	Tay Hung commune, Tien Lang district	K20 + 070-K20 + 420 (organic Van Dyke Western Australia Hung commune, Tien Lang district) (Tay Hung)	Tay Hung commune, Tien Lang district	20.63823	106.60345	The danger point	Length 350m..Anh landslides affect the safety of dikes	350	River bank	Northern		2	0101000020E61000005BB1BFEC9EA65A407A53910A63A33440
15	16	Phu Quy embankment Nam Truc District, Nam Dinh Province	K177 + 900-K180 + 050 (Hong embankment dike Huu Phu Quy Nam Hong Commune Nam Truc District, Nam Dinh Province) (embankment Quy Phu Nam Truc District, Nam Dinh Province)	Phu Quy embankment Nam Truc District, Nam Dinh Province	20.35702	106.25333	Featuring dangerous no layout or design capital	Landslide embankment Phu Quy Nam Truc District, Nam Dinh Province section from K177 + 918 - - K180 + 050 dike Huu Hong length 2050m, landslide in typhoon No. 1 in 2016, serious	2050	River bank	Northern	Proposed new support	4	0101000020E61000002046088F36905A409604A8A9655B3440
16	17	Lien Tri embankment, Dan Phuong, Hanoi	Organic Red dyke (embankment Liench'ih)	Lien Tri embankment, Dan Phuong, Hanoi	21.1129	105.72553	The danger point	Offtake Dan Hoai 2 door (2,5x1,7) m and roof cracked embankment Liench'ih 80m long embankment along the roof at (? + 9.0m), dike embankments closely. The problem is the embankment; need to closely monitor the management of flood emergency 2017xu drop kic	1000	River bank	Northern		2	0101000020E6100000159161156F6E5A40E9B7AF03E71C3540
17	18	Lac Hong, Hai Duong Thanh Ha	K4 + 430-K4 + 520 (Hong Lac, Thanh Ha Hai Duong)	Lac Hong, Hai Duong Thanh Ha	20.96224	106.41664	The normal point	Point landslide Hong Lac, Thanh Ha Hai Duong province-section from K4 K4 + 430 + 520 Friends Rang 90m, width 5m 4m deep, affecting 7158 hectares, 71 583 people	90	River bank	Northern		1	0101000020E6100000268DD13AAA9A5A402EE7525C55F63440
18	19	Tien Lang Hai Phong	Huu Van Dyke Australia (Tien Lang Hai Phong)	Tien Lang Hai Phong	20.69998	106.62854	The normal point	Australia Huu Van Dyke landslides from K20 + 070-piece K20 +420 Tien Lang district, Hai Phong 350m long influence of dikes Huu safe Van Uc	350	River bank	Northern		1	0101000020E6100000950ED6FF39A85A40A5DAA7E331B33440
19	20	Vietnam Phuong Tuong Hung commune embankment Truc Ninh District, Nam Dinh Province	Huu Ninh (Vietnam Hung Commune embankment Phuong Tuong Truc Ninh District, Nam Dinh Province)	Vietnam Phuong Tuong Hung commune embankment Truc Ninh District, Nam Dinh Province	20.2747	106.32298	The normal point	Point embankment erosion Vietnam Phuong Tuong Hung commune of Nam Dinh Truc Ninh section from K6 + 067 - - 347 + 280 m K6 destabilize existing embankments	280	River bank	Northern		1	0101000020E6100000C6504EB4AB945A4011363CBD52463440
20	21	The ambiance embankment sections Kim Son district, Ninh Binh	Friends Day (embankment Substances List Kim Son district paragraph, Ninh Binh)	The ambiance embankment sections Kim Son district, Ninh Binh	20.09481	106.14411	Featuring dangerous no layout or design capital	The Quality Score embankment erosion paragraph 240 K64 + K65 + 300 dike organic-Day, Kim Son district, 1060m long segment landslides affecting the foot dike safety of dikes Huu Day	1060	River bank	Northern	Proposed new support	4	0101000020E6100000B341261939895A407155D97745183440
21	22	Kien Xuong district embankment Vu Binh Thai Binh province	K118 + 100 - K189 + 700 (Ke Vu Binh, Thai Binh Kien Xuong District)	Kien Xuong district embankment Vu Binh Thai Binh province	20.34465	106.39053	Featuring dangerous no layout or design capital	Point embankment erosion Vu Binh Thai Binh Kien Xuong District section from K188 + 100-K189 + 700 dike Honghe II, 1600m long points landslides affecting the foot dike safety of dikes Honghe II	1600	River bank	Northern	Proposed new support	4	0101000020E6100000D7868A71FE985A4000917EFB3A583440
22	23	Xuan Vinh Tho Truong Tho Xuan District, Thanh Hoa Province	Ta Chu River (Xuan Vinh Tho Truong Tho Xuan district, Thanh Hoa province)	Xuan Vinh Tho Truong Tho Xuan District, Thanh Hoa Province	19.94069	105.57401	The danger point	Landslide points in Xuan Vinh Tho Truong Tho Xuan district, Thanh Hoa province, K16 + 400 - K16 + 750 Ta Chu river, 350m long segment landslides affecting the foot dike safety Ta Chu river dikes	350	River bank	Northern	Proposed new support	2	0101000020E6100000ED647094BC645A409BAC510FD1F03340
23	24	Linh Nga commune, Nga Son district, Thanh Hoa province	Ta Len River (Russia Linh Commune, Nga Son district, Thanh Hoa province)	Linh Nga commune, Nga Son district, Thanh Hoa province	19.98589	105.92425	The danger point	Point landslide in Russia Linh Commune, Nga Son district, Thanh Hoa province, 852 � K28 k27 + Ta Len River, 270m long segment landslides affecting the foot dike safety Ta Len river dikes	270	River bank	Northern	Proposed new support	2	0101000020E6100000FED478E9267B5A4015747B4963FC3340
24	25	Organic Len River, Da Loc commune, Hau Loc District, Thanh Hoa Province	K27 + 852-K28 + 000 (Friends Len River, Da Loc commune, Hau Loc district, Thanh Hoa province)	Organic Len River, Da Loc commune, Hau Loc District, Thanh Hoa Province	19.96149	105.98431	The danger point	K27 K28 + 852 � Friends Len River, 148m long segment landslides affecting the foot dike safety Huu Len river dikes	148	River bank	Northern	Proposed new support	2	0101000020E61000000CC85EEFFE7E5A40596E693524F63340
25	26	Thanh Lang Thanh Ha district, Hai Duong province	Organic Rang (Thanh Lang Commune, Thanh Ha district, Hai Duong province)	Thanh Lang Thanh Ha district, Hai Duong province	20.95132	106.46158	Featuring dangerous no layout or design capital	Landslide K9 + 510 - + 710 K9 Huu Thanh Lang Commune Rang river in Thanh Ha district, Hai Duong province Time: 2015-2016 Length 200 m, width 4.5 m, depth of 4m Affect 7158 ha, 71 583 people	200	River bank	Northern	Proposed new support	4	0101000020E6100000361FD7868A9D5A40DD0720B589F33440
26	27	Thuy Nguyen district, Hai Phong city	Cam River description (Thuy Nguyen District, Hai Phong City)	Thuy Nguyen district, Hai Phong city	20.99931	106.55556	The danger point	Upgrading dikes K0 + 000 - K18 + 775 Left Cam river, Thuy Nguyen district of Hai Phong Time: The length 18775m Protection of economic welfare in the dike	18 775	River bank	Northern	Proposed new support	2	0101000020E6100000CFBD874B8EA35A40D690B8C7D2FF3440
27	28	Hai Phong, Vinh Bao District	Ta Hoa river K5 + 665 - K17 + 045 (Vinh Bao Hai Phong)	Hai Phong, Vinh Bao District	20.69135	106.40216	The danger point	Upgrading dikes K5 + 665 - K17 + 045 River Huu Hoa Hai Phong Vinh Bao District Level: especially dangerous time: The length 11380m Protection of economic welfare in the dike	11380	River bank	Northern	Proposed new support	2	0101000020E610000099F04BFDBC995A40F0164850FCB03440
28	29	Tien Lang district, Hai Phong city	Pacific river left K10 + 000-K17 + 700 (Tien Lang District, Hai Phong City)	Tien Lang district, Hai Phong city	20.70145	106.51567	The danger point	Upgrading dikes K10 + 000-K17 + 700 Ta Tien Lang District, Thai Binh river Haiphong Time: Length 7700m Protection of economic welfare in the dike	7700	River bank	Northern	Proposed new support	2	0101000020E6100000D061BEBC00A15A407AC7293A92B33440
29	30	Nghia Hung district, Nam Dinh province	Huu Ninh River K0 + 000-K41 + 556 (Nghia Hung District, Nam Dinh Province)	Nghia Hung district, Nam Dinh province	20.32372	106.3091	The danger point	Upgrading dikes K0 + 000-K41 + 556 River Huu Nghia Hung Ninh District, Nam Dinh Province Time: The length 41556m Protection of economic welfare in the dike	41 556	River bank	Northern	Proposed new support	2	0101000020E610000064CC5D4BC8935A40A60F5D50DF523440
30	31	Kim Son district, Ninh Binh province	K71 + 400 dike Huu Day - K72 + 200 (Kim Son District, Ninh Binh Province)	Kim Son district, Ninh Binh province	20.04609	106.11032	Featuring dangerous no layout or design capital	K71 + 400 landslides - K72 + 200 Dyke Organic Day Kim Son district, Ninh Binh province Time: 2015-2016 Length: 800m Safety Affect dikes	800	River bank	Northern	Proposed new support	4	0101000020E610000010069E7B0F875A4032ACE28DCC0B3440
31	32	Tan Yen district, Bac Giang province	Huu Thuong river-K2 K2 + 200 + 500 (Tan Yen district, Bac Giang province)	Tan Yen district, Bac Giang province	21.41438	106.16836	The danger point	K2 avalanche-K2 + 500 + 200 River Huu Thuong Tan Yen district, Bac Giang province Time: 2010-2011 Length: 300m Affecting people's livelihood, economic Tan Yen district	300	River bank	Northern	Proposed new support	2	0101000020E6100000187D0569C68A5A40D21DC4CE146A3540
32	33	Tan Yen district, Bac Giang province	Huu Thuong river K10-K12 + 000 + 150 (Tan Yen district, Bac Giang province)	Tan Yen district, Bac Giang province	21.36875	106.18254	The danger point	K10 + 000-landslide K12 + 150 River Huu Thuong Tan Yen District, Bac Giang Province Time: 2013, 2014, 2015, 2016 Length: 2120m Affecting people's livelihood, economic Tan Yen district	2120	River bank	Northern	Proposed new support	2	0101000020E61000008F8D40BCAE8B5A4066666666665E3540
33	34	City Bac Giang, Bac Giang Province	Huu Thuong river K30 + 800-K31 + 100 (City Bac Giang, Bac Giang province)	City Bac Giang, Bac Giang Province	21.31816	106.18582	The danger point	K30 + 800-landslide K31 + 100 River Huu Thuong Bac Giang City, Bac Giang Province Time: 2010-2011 Length: 300m Affecting people's livelihood, economic part of Bac Giang city	300	River bank	Northern	Proposed new support	2	0101000020E610000056BC9179E48B5A4036E50AEF72513540
34	35	Anti-erosion embankment Bac Vong River, The Linh commune and Dai Son Commune, Cao Bang Phuc Hoa district	Riverfront (embankment against erosion Bac Vong River, The Linh commune and Dai Son Commune, Cao Bang Phuc Hoa district)	Anti-erosion embankment Bac Vong River, The Linh commune and Dai Son Commune, Cao Bang Phuc Hoa district	22.48094	106.5838	Featuring dangerous no layout or design capital	Length: 1974m Photo seriously damage people's life - economic	1974	River bank	Northern	Total cost: 86 billion.	4	0101000020E6100000E8D9ACFA5CA55A40975643E21E7B3640
35	36	Anti-erosion embankment Quay Son River, Ha Lang District Cao Bang province	Waterfront (anti-erosion embankment Quay Son River, Ha Lang District Cao Bang province)	Anti-erosion embankment Quay Son River, Ha Lang District Cao Bang province	22.81883	106.80331	Featuring dangerous no layout or design capital	Length: 2390m Photo seriously damage people's life - economic	2390	River bank	Northern	Total cost: 150 billion	4	0101000020E61000002FA3586E69B35A40D2FBC6D79ED13640
36	37	New Version Cha Cang commune of Muong Nhe district, Dien Bien province	(The New Cha Cang commune of Muong Nhe district, Dien Bien province)	New Version Cha Cang commune of Muong Nhe district, Dien Bien province	21.96778	102.86252	Featuring dangerous no layout or design capital	Length: 1670m Photo seriously Livelihood - economic	1670	River bank	Northern	Total cost: 70 billion	4	0101000020E61000005709168733B759400FB9196EC0F73540
37	38	River embankment area Boi Boi Verse neighbor, Kim Boi commune, Kim Boi district, Hoa Binh province	Waterfront (river embankment area Boi Boi Verse neighbor, Kim Boi commune, Kim Boi district, Hoa Binh province)	River embankment area Boi Boi Verse neighbor, Kim Boi commune, Kim Boi district, Hoa Binh province	20.5971	105.60419	Featuring dangerous no layout or design capital	Length: 600m seriously Influence People born - economic	600	River bank	Northern		4	0101000020E61000007FA4880CAB665A400D71AC8BDB983440
38	39	Erosion control protection embankment residential neighborhood Thanh Mai, the market area of ??Co Luong, Van Mai commune, Mai Chau district of Hoa Binh province	Riverfront (embankment erosion control protection Thanh Mai residential neighborhood, the market area of ??Co Luong, Van Mai commune, Mai Chau district of Hoa Binh province)	Erosion control protection embankment residential neighborhood Thanh Mai, the market area of ??Co Luong, Van Mai commune, Mai Chau district of Hoa Binh province	20.56801	105.0111	Featuring dangerous no layout or design capital	Length: 1552m Photo seriously Livelihood - economic	1552	River bank	Northern	Total cost: 205 billion	4	0101000020E6100000143FC6DCB5405A400CCD751A69913440
39	40	Vietnam Friendship Bridge downstream Central region Ma Lu Thang border gate Lai Chau	Waterfront (Downstream Vietnam-China Friendship Bridge area Ma Lu Thang border gate Lai Chau)	Vietnam Friendship Bridge downstream Central region Ma Lu Thang border gate Lai Chau	22.6073	103.56523	Featuring dangerous no layout or design capital	Length: 309m Affecting Defense	309	River bank	Northern	Total cost: 24 billion	4	0101000020E6100000F52D73BA2CE459405DDC4603789B3640
40	41	Stream downstream mold 68 (2) Phong Tho district, Lai Chau province	Stream (stream downstream mold 68 (2) Phong Tho district, Lai Chau province)	Stream downstream mold 68 (2) Phong Tho district, Lai Chau province	22.67132	103.26035	Featuring dangerous no layout or design capital	Length: 540M Affecting Defense	540	River bank	Northern	Total cost: 49 billion.	4	0101000020E6100000DFE00B93A9D059409626A5A0DBAB3640
41	42	Protection against erosion embankment stream Mu Chi Ho Na area landmark 72 (2) Lai Chau	Riverfront (embankment protection against erosion Na Mu Chi Ho stream area landmark 72 (2) Lai Chau)	Protection against erosion embankment stream Mu Chi Ho Na area landmark 72 (2) Lai Chau	22.78101	103.32017	Featuring dangerous no layout or design capital	Length: 42m Effect on Defense	42	River bank	Northern	Total cost: 38 billion.	4	0101000020E610000043CA4FAA7DD4594055D97745F0C73640
42	43	Town embankment erosion control Na Sam Van Lang district, Lang Son province	Riverfront (embankment erosion control towns Na Sam Van Lang district, Lang Son province)	Town embankment erosion control Na Sam Van Lang district, Lang Son province	22.05351	106.60965	Featuring dangerous no layout or design capital	Length: 650m to seriously affect people's life - economic	650	River bank	Northern	Total cost: 38 billion	4	0101000020E610000069006F8104A75A404B02D4D4B20D3640
43	44	Red River embankment, immigrant resettlement area Wing Nine, Van Hoa commune of Lao Cai City, Lao Cai Province	Waterfront (Red River Embankment, immigrant resettlement area Wing Nine, Van Hoa commune of Lao Cai City, Lao Cai province)	Red River embankment, immigrant resettlement area Wing Nine, Van Hoa commune of Lao Cai City, Lao Cai Province	22.47925	103.99375	Featuring dangerous no layout or design capital	Length: 900m seriously Influence People born - economic	900	River bank	Northern	Total cost: 950 billion	4	0101000020E61000009A99999999FF5940A69BC420B07A3640
44	45	Red River border embankment landmark piece from M93 (2) + 1200m to M93 (2) + 1600m and the section from M93 (2) + 2780m to M93 (2) +3580, grasp commune, Bat Xat district, Lao Cai province	Waterfront (Red River border embankment landmark piece from M93 (2) + 1200m to M93 (2) + 1600m and the section from M93 (2) + 2780m to M93 (2) +3580, grasp commune, Bat Xat district Lao Cai)	Red River border embankment landmark piece from M93 (2) + 1200m to M93 (2) + 1600m and the section from M93 (2) + 2780m to M93 (2) +3580, grasp commune, Bat Xat district, Lao Cai province	22.76271	103.68064	Featuring dangerous no layout or design capital	Length: 1204m Affecting Defense	1204	River bank	Northern	Total cost: 77 billion	4	0101000020E61000005D16139B8FEB594008556AF640C33640
45	46	Red River embankment area border markers 96 (2) to mold 97 (2) US and Ban Coc commune Vuoc Bat Xat district of Lao Cai province	Riverfront (embankment in the Red River area border markers 96 (2) to mold 97 (2) US and Ban Coc commune Vuoc Bat Xat district of Lao Cai province)	Red River embankment area border markers 96 (2) to mold 97 (2) US and Ban Coc commune Vuoc Bat Xat district of Lao Cai province	22.64558	103.80421	Featuring dangerous no layout or design capital	Length: 2135m Affecting Defense	2135	River bank	Northern	Total cost: 150 billion	4	0101000020E61000006F47382D78F35940A1F31ABB44A53640
46	47	Red River embankment area border markers 97 (2) Through the commune, Bat Xat district, Lao Cai province	Riverfront (embankment in the Red River area border markers 97 (2) Through the commune, Bat Xat district, Lao Cai province)	Red River embankment area border markers 97 (2) Through the commune, Bat Xat district, Lao Cai province	22.58992	103.8544	Featuring dangerous no layout or design capital	Length: 2033m Affecting Defense	2033	River bank	Northern	Total cost: 150 billion	4	0101000020E6100000F46C567DAEF659409E4143FF04973640
47	48	Revetment landmark area in 1319 (1) to the area in 1320 Milestones (2) Na Na Po Choong and diaphragm tissues commune of Quang Ninh province Binh Lieu District	Riverfront (embankment protection landmark area in 1319 (1) to the area in 1320 Milestones (2) Na Na Po Choong and diaphragm tissues commune of Quang Ninh province Binh Lieu District)	Revetment landmark area in 1319 (1) to the area in 1320 Milestones (2) Na Na Po Choong and diaphragm tissues commune of Quang Ninh province Binh Lieu District	21.59005	107.52742	Featuring dangerous no layout or design capital	Length: 939m Affecting Defense	939	River bank	Northern	Total cost: 38 billion	4	0101000020E610000068D0D03FC1E15A403B014D840D973540
48	49	Revetment landmark area in 1324 (3) Floor Phai village of Dong Van commune, Quang Ninh province Binh Lieu District	Riverfront (embankment protection landmark area in 1324 (3) Floor Phai village of Dong Van commune, Quang Ninh province Binh Lieu District)	Revetment landmark area in 1324 (3) Floor Phai village of Dong Van commune, Quang Ninh province Binh Lieu District	21.61297	107.56019	Featuring dangerous no layout or design capital	Length: 340m Affecting Defense	340	River bank	Northern	Total cost: 26 billion	4	0101000020E6100000F6622827DAE35A40DB6D179AEB9C3540
49	50	River bank erosion control 8 Power Sub-area town Cho Ra, Ba Be district, Bac Kan Province	Waterfront (Anti river erosion Energy Sub-area 8 Cho Ra town, Ba Be district, Bac Kan province)	River bank erosion control 8 Power Sub-area town Cho Ra, Ba Be district, Bac Kan Province	22.46718	105.74435	Featuring dangerous no layout or design capital	Length: 500m to seriously affect people's life - economic	500	River bank	Northern	Total cost: 40 billion	4	0101000020E6100000C4B12E6EA36F5A406458C51B99773640
50	51	Double stream toad embankment village, Ban Vieng Son A tx Nghia Lo Commune, Yen Bai Province	Springs (springs Double Ke Ban Coc village, Ban Vieng Son A tx Nghia Lo Commune, Yen Bai province)	Double stream toad embankment village, Ban Vieng Son A tx Nghia Lo Commune, Yen Bai Province	21.64774	104.50217	Featuring dangerous no layout or design capital	Length: 500m to seriously affect people's life - economic	500	River bank	Northern	Total cost: 24 billion	4	0101000020E610000012C2A38D23205A40A04FE449D2A53540
51	52	La Giang river erosion Duc Tho District, Ha Tinh Province	K15 + K16 + 840-160 (La Giang river erosion Duc Tho District, Ha Tinh Province)	La Giang river erosion Duc Tho District, Ha Tinh Province	18.55888	105.66314	The normal point	Length: 320 m.	320	River bank	Central		1	0101000020E6100000D82AC1E2706A5A4073637AC2128F3240
52	53	Vinh Thach	Coastal erosion Vinh Thach period; The town of Cua Tung (Vinh Thach)	Vinh Thach	17.03459	107.11097	The danger point	Time: 2006-2017.Chieu length: 2800m, 20-40m wide, deep: 20m.Anh entitled residential land, housing, provincial road	2800	River bank	Central		2	0101000020E61000009335EA211AC75A40C6C4E6E3DA083140
53	54	Vinh Thai	Coastal erosion rural segments Thai Lai, Tan Circuits, Test Laws, Thai Vinh Tan Hoa (Vinh Thai)	Vinh Thai	17.13466	107.03392	The danger point	Time: 2006-2017.Chieu length: 3200m, 20-40m wide, deep: 10m.Anh enjoy dykes, residential land, housing and production land	3200	River bank	Central		2	0101000020E61000008AABCABE2BC25A405114E81379223140
54	55	Quang Cong	Coast Quang Cong (Quang Cong)	Quang Cong	16.61582	107.55274	The danger point	Time: .Chieu length: 4000m, width 10m, depth: m.Anh enjoy residential, infrastructure works and road Provincial Road 16	4000	River bank	Central		2	0101000020E61000003ACC971760E35A4004392861A69D3040
55	56	Vinh Hai	Coastal erosion through the passage Vinh Hai commune - Vinh Hien, Phu Loc (Vinh Hai)	Vinh Hai	16.38666	107.87476	The danger point	Time: .Chieu length: 3000m, width 20m, depth: m.Anh enjoy residential, infrastructure works and road Provincial Road 16	3000	River bank	Central		2	0101000020E610000055F65D11FCF75A40DEAB5626FC623040
56	57	Vinh Trung Commune - Vinh Phuong - Ngoc Vinh, Nha Trang City, Khanh Hoa Province	The river embankment (Vinh Trung Commune - Vinh Phuong - Ngoc Vinh, Nha Trang City, Khanh Hoa) (Vinh Trung)	Vinh Trung Commune - Vinh Phuong - Ngoc Vinh, Nha Trang City, Khanh Hoa Province	12.27587	109.15552	The danger point			River bank	Central		2	0101000020E6100000EE77280AF4495B4021E527D53E8D2840
57	58	Tp. Kontum, Kon Tum Province	Dak Bla River along South Kon Ro Bang village running through the city of Kontum (village of Kon Ro Bang)	Tp. Kontum, Kon Tum Province	14.35659	107.9879	The danger point	Time: Item nam.Chieu long: .Anh affect roads, productive land, homes of people		River bank	Central		2	0101000020E6100000FAEDEBC039FF5A404A29E8F692B62C40
58	59	Tp. Kontum, Kon Tum Province	Dak Bla River along South running through the village of Plei Kon Tum city London (village of Plei London)	Tp. Kontum, Kon Tum Province	14.35603	107.99222	The danger point	Time: Item nam.Chieu long: .Anh affect roads, productive land, homes of people		River bank	Central		2	0101000020E6100000FA9B508880FF5A402ECA6C9049B62C40
59	60	Tp. Kontum, Kon Tum Province	Dak Bla River running through the village to the village of Plei Kon Klor Groi 2 (the village of Plei Groi)	Tp. Kontum, Kon Tum Province	14.34283	107.99606	The danger point	Time: Item nam.Chieu long: .Anh affect roads, productive land, homes of people		River bank	Central		2	0101000020E6100000A4367172BFFF5A40E42CEC6987AF2C40
60	61	Tp. Kontum, Kon Tum Province	Dak Bla River from village to village Chot Kon Kon Tum HRA Kompong (HRA Chot Kon village)	#VALUE!	14.35362	108.04193	The danger point	Time: Item nam.Chieu long: .Anh affect roads, productive land, homes of people		River bank	Central		2	0101000020E610000029AE2AFBAE025B404C6C3EAE0DB52C40
61	62	Tan Lap Commune, Kon Ray district	Adjacent roads and residential area in Tan Lap commune (Tan Lap commune)	Tan Lap Commune, Kon Ray district	14.46822	108.17815	The danger point	Time: Item nam.Chieu long: 600m.Sat foot-roads make it difficult for the movement of people in the region	600	River bank	Central		2	0101000020E610000013F241CF660B5B408FAA2688BAEF2C40
62	63	Dak Kan commune, Dak To district	Locations upstream and downstream of the bridge 42 in the town of Dak To, Dak To district (town Dak)	Dak Kan commune, Dak To district	14.65931	107.83478	The danger point	Time: Item nam.Chieu long: .Sat landslides affecting transport links, productive land, homes of people		River bank	Central		2	0101000020E6100000B6D617096DF55A40FDD98F1491512D40
63	64	Sa Thay district, Kon Tum province	Along stream running through the commune Dak Sa Sia lovingkindness, and Sa Sa Thay town means (spring Dak Sia)	Sa Thay district, Kon Tum province	14.41363	107.7991	The danger point	Time: Item nam.Chieu long: .Sat foot-roads make it difficult for the movement of people in the region		River bank	Central		2	0101000020E6100000F38E537424F35A40F949B54FC7D32C40
64	65	Embankment erosion control Dong Nai River, Cat Tien district, Lam Dong	Dong Nai River (Dong Nai River)	Embankment erosion control Dong Nai River, Cat Tien district, Lam Dong	11.58214	107.36069	Featuring dangerous no layout or design capital	Length: 600 m, width: 2m, depth: 6m.Anh entitled to households and roads.	600	River bank	Central	Proposed new support. Total cost: 50 billion.	4	0101000020E6100000A27F828B15D75A400B630B410E2A2740
65	66	Embankment erosion control Ba River running through the town of Phu Hoa, Phu Yen	Riverfront (embankment erosion control Ba River running through the town of Phu Hoa, Phu Yen)	Embankment erosion control Ba River running through the town of Phu Hoa, Phu Yen	13.03661	109.25991	Featuring dangerous no layout or design capital	Duration: Length: 3000m landslide affecting transportation, housing construction, production land riverside households	3000	River bank	Central	Proposed new support. Total cost: 150 billion.	4	0101000020E6100000D1798D5DA2505B40C269C18BBE122A40
66	67	Riverside embankment erosion control Ve An Only paragraph, Hanh Phuoc Commune, Nghia Hanh, Quang Ngai	Riverfront (embankment erosion control river banks, in the An Only, Hanh Phuoc Commune, Nghia Hanh, Quang Ngai)	Riverside embankment erosion control Ve An Only paragraph, Hanh Phuoc Commune, Nghia Hanh, Quang Ngai	14.99039	108.81385	Featuring dangerous no layout or design capital	Time: Before 2014 Length: 1000m landslide caused serious influence to roads, traffic bridges, crops and homes of residents living along the river.	1000	River bank	Central	Proposed new support. Total cost: 32 billion.	4	0101000020E610000060764F1E16345B402592E86514FB2D40
67	68	Lam Luong dike district, Nghe An	Ta Lam (De Ta Lam Luong district, Nghe An)	Lam Luong dike district, Nghe An	18.88491	105.29859	The danger point	Lam paragraph dike erosion K9 + 000 - K10 + 870, Son Da commune, Do Luong district, 1870m long segment landslide seriously affect dikes Ta Lam	1870	River bank	Central		2	0101000020E6100000693A3B191C535A4043E7357689E23240
68	69	Waterfront embankment erosion control Ba Ren sects East Bridge Sink, Nam Phuoc town, Duy Xuyen district, Quang Nam	Ba Ren river bank (embankment erosion control Ba Ren sects waterfront East Bridge Sink, Nam Phuoc town, Duy Xuyen district, Quang Nam)	Waterfront embankment erosion control Ba Ren sects East Bridge Sink, Nam Phuoc town, Duy Xuyen district, Quang Nam	15.82653	108.25215	Featuring dangerous no layout or design capital	Length: 1000m Photo seriously Livelihood - economic	1000	River bank	Central		4	0101000020E6100000EEEBC03923105B406553AEF02EA72F40
69	70	Embankment erosion control Namo waterfront district, Nghe An province Muong Xen	Riverfront (embankment erosion control Namo waterfront district, Nghe An province Muong Xen)	Embankment erosion control Namo waterfront district, Nghe An province Muong Xen	19.40105	104.14342	Featuring dangerous no layout or design capital	Length: 1700m Photo seriously damage people's life - economic	1700	River bank	Central	Total cost: 145 billion	4	0101000020E6100000E96514CB2D095A40910F7A36AB663340
70	71	Handling of river erosion and river Lam Ro, Vo Liet Commune, Thanh Chuong district, Nghe An province	Waterfront (Handling of river erosion and river Lam Ro, Vo Liet Commune, Thanh Chuong district, Nghe An province)	Handling of river erosion and river Lam Ro, Vo Liet Commune, Thanh Chuong district, Nghe An province	18.73074	105.36554	Featuring dangerous no layout or design capital	Length: 120m seriously Influence People born - economic	120	River bank	Central	Total cost: 60 billion	4	0101000020E61000004F58E20165575A4009E1D1C611BB3240
71	72	River erosion and Kien Giang Long Dai, Hien Ninh commune, Tan Ninh and Quang Ninh district, Quang Binh province	Shore shore (Long Dai river erosion and Kien Giang, Ninh Hien commune, Tan Ninh and Quang Ninh district, Quang Binh province)	River erosion and Kien Giang Long Dai, Hien Ninh commune, Tan Ninh and Quang Ninh district, Quang Binh province	17.33868	106.60472	Featuring dangerous no layout or design capital	Length: 300m seriously Influence People born - economic	300	River bank	Central	Total cost: 30 billion.	4	0101000020E61000002DCF83BBB3A65A402DCF83BBB3563140
72	73	Coast embankment erosion control Hoa Duan passage through the village, An Duong, Phu Thuan commune, Phu Vang district, Thua Thien Hue	Phu Thuan coast, Phu Vang District (K� against coastal erosion through the village of Hoa Duan piece, An Duong, Phu Thuan commune, Phu Vang district, Thua Thien Hue)	Coast embankment erosion control Hoa Duan passage through the village, An Duong, Phu Thuan commune, Phu Vang district, Thua Thien Hue	16.54816	107.67376	Featuring dangerous no layout or design capital	Time: .Chieu length: 1000m, width 20m, depth: m.Anh enjoy residential, infrastructure works and highway 49B	1000	Seaside	Central	Proposed new support: 80 billion.	4	0101000020E6100000975643E21EEB5A40B1F9B836548C3040
73	74	Tam Tan sector	Landslide Resort Tam Tan sector (sector Tam Tan)	Tam Tan sector	10.70339	107.84433	The danger point	Description information: Length 500m landslides, storm surges caused by erosion, affect tourist areas Tam Tan sector	500	Seaside	Central		2	0101000020E61000000742B28009F65A40B9AAECBB22682540
74	75	ThonTien Germany, Tien Thanh Ward and Ward Germany Long City. Phan Thuan ThietBinh	Coastal erosion Duc Long Ward, Phan Thiet City (Thon Tien Duc)	ThonTien Germany, Tien Thanh Ward and Ward Germany Long City. Phan Thuan ThietBinh	10.90959	108.08034	The danger point	Description information: Length avalanche about 1,500 meters, affecting the tourist area than the wind, carved cleft dozens of houses, 13 houses collapsed in the coastal area villages Tien Duc, Tien Thanh and Ward Germany Long, Phan Thiet City.	1500	Seaside	Central		2	0101000020E6100000E223624A24055B408B89CDC7B5D12540
75	76	KP 14 TT Lien Huong, Tuy Phong district, Binh Thuan	Coastal erosion Quarter 14, TT Lien Huong, Tuy Phong, Binh Thuan (KP 14 TT Lien Huong, Tuy Phong district, Binh Thuan)	KP 14 TT Lien Huong, Tuy Phong district, Binh Thuan	11.21793	108.73776	Featuring dangerous no layout or design capital	Description information: length 1200 m landslides, erosion Speed ??712m / year in 1520m / year affecting 21 households / 95 demographic, 7 houses collapsed and damaged, coast Beach erosion and landslide equipment weighs about 600 meters, 82 households ha	1200	Seaside	Central	Proposed new support. Total cost: 235 billion.	4	0101000020E61000000113B875372F5B4073A25D85946F2640
76	77	An Hoa commune, Tuy An, Phu Yen	Coastal erosion KV Hoa commune, Tuy An, Phu Yen (KV An Hoa)	An Hoa commune, Tuy An, Phu Yen	13.22541	109.29991	The danger point	Length: 1000mh. Length of approximately 1000 meters landslide, Hoa An hamlet of 30 houses collapsed and one of relocation	1000	Seaside	Central		2	0101000020E6100000936FB6B931535B40FA6184F068732A40
77	78	An Phu commune, Tuy An, Phu Yen	Coastal erosion KV An Phu commune, Tuy An, Phu Yen (Phu commune KV)	An Phu commune, Tuy An, Phu Yen	13.16952	109.29369	The danger point	Length: 2000mh .Toc erosion 5-7m / year are affected 3: Phu Thuong, Nhon Hoi, Thoai Son	2000	Seaside	Central		2	0101000020E6100000624A24D1CB525B402D095053CB562A40
78	79	Xuan Hai Commune (village 2), Song Cau, Phu Yen	Coastal erosion KV Hai Xuan, Cau, Phu Yen (KV Xuan Hai)	Xuan Hai Commune (village 2), Song Cau, Phu Yen	13.6429	109.22571	The danger point	Length: 1000mh .Toc erosion (2-3 m / year), Hamlet 2 28 displaced households, 126 inhabitants; Land 9360m2 miss	2000	Seaside	Central		2	0101000020E610000055185B08724E5B40613255302A492B40
79	80	Xuan Hoa, Song Cau, Phu Yen	Coastal erosion KV Xuan Hoa commune, Song Cau District, Phu Yen (KV Xuan Hoa)	Xuan Hoa, Song Cau, Phu Yen	13.54602	109.27631	The danger point	Length: 1000mh .Thon Hoa An 30 houses were sapva 1 of displaced	1000	Seaside	Central		2	0101000020E6100000B2632310AF515B4081ECF5EE8F172B40
80	81	Coast Village Ro TP. Tuy Hoa, Phu Yen	Coastal erosion KV Coast Ro Hamlet, TP. Tuy Hoa, Phu Yen (KV Coast Ro Hamlet)	Coast Village Ro TP. Tuy Hoa, Phu Yen	13.07371	109.33716	Featuring dangerous no layout or design capital	Length 391m	391	Seaside	Central	Total cost: 144 billion.	4	0101000020E61000003D61890794555B40BDC62E51BD252A40
81	82	Embankments against erosion area Tam Hai commune, Nui Thanh district, Quang Nam	Coastal erosion Tam Hai commune period, Nui Thanh district (embankment against erosion area Tam Hai commune, Nui Thanh district, Quang Nam)	Embankments against erosion area Tam Hai commune, Nui Thanh district, Quang Nam	15.49421	108.65532	Featuring dangerous no layout or design capital	Time: 2016-2017.Chieu length: 2500m, 20-40m wide, deep: m.Anh enjoy sea embankment, residential land, housing	2500	Seaside	Central	Proposed new support. Total cost: 200 billion.	4	0101000020E61000008B1A4CC3F0295B405BB6D61709FD2E40
82	83	Phuoc Loc commune, Tan Phuoc Lagi Town, Binh Thuan	Binh Thuan coast (Phuoc Loc, Tan Phuoc Lagi Town, Binh Thuan)	Phuoc Loc commune, Tan Phuoc Lagi Town, Binh Thuan	10.65065	107.77002	Featuring dangerous no layout or design capital	Length: 2500m, affecting people's livelihood, the status quo has temporarily damaged embankments	2500	Seaside	Central	Total cost: 30 billion.	4	0101000020E61000000551F70148F15A40E9482EFF214D2540
83	84	Cua Dai beach, Hoi An, Quang Nam	Cua Dai (Cua Dai Beach, Hoi An, Quang Nam)	Cua Dai beach, Hoi An, Quang Nam	15.87735	108.30919	Featuring dangerous to plan allocating capital	Duration: long 2010-2017.Chieu: 6500M, 40-100m wide, deep: 3m.Anh enjoy residential, infrastructure works, roads	6500	Seaside	Central	Has planned to allocate capital or the government. Total cost: 1030 billion.	3	0101000020E61000000490DAC4C9135B408C4AEA0434C12F40
84	85	Tam Quan coastal erosion, Binh Dinh	Coast (Coastal erosion Tam Quan, Binh Dinh)	Tam Quan coastal erosion, Binh Dinh	14.54747	109.07156	Featuring dangerous no layout or design capital	Duration: Length: 5600m landslide affecting the operation of vessels, loss of productive land and coastal residents risk disappears tourist beach.	5600	Seaside	Central	Proposed new support. Total cost: 198 billion.	4	0101000020E6100000EAEC647094445B400E15E3FC4D182D40
85	86	Dikes Man Quang, Da Nang city (from the Climate Change Program), Danang	Coast Man Quang (Quang Man Dikes, Danang (from the Climate Change Program), Da Nang)	Dikes Man Quang, Da Nang city (from the Climate Change Program), Danang	16.10153	108.22364	Featuring dangerous to plan allocating capital	Length: 760m Influence sea embankment, residential land, housing	760	Seaside	Central	Has planned to allocate capital or the government. Total cost: 384 billion.	3	0101000020E6100000F584251E500E5B401990BDDEFD193040
86	87	Embankment erosion control and sedimentation of estuaries have filled (from the Climate Change Program), Phu Yen	Shore (embankment erosion control and sedimentation of estuaries have filled (from the Climate Change Program), Phu Yen)	Embankment erosion control and sedimentation of estuaries have filled (from the Climate Change Program), Phu Yen	13.08913	109.32765	Featuring dangerous no layout or design capital	Length: 3000m	3000	Seaside	Central	Total cost: 180 billion.	4	0101000020E610000034A2B437F8545B405A2F8672A22D2A40
87	88	Money river bank, Binh Thanh Commune, Thanh Binh District (Phase 2), Dong Thap	Waterfront Cash (Cash waterfront, Binh Thanh Commune, Thanh Binh District (Phase 2), Dong Thap)	Money river bank, Binh Thanh Commune, Thanh Binh District (Phase 2), Dong Thap	10.53475	105.53814	Featuring dangerous to plan allocating capital	Time: 03/4/2017 - 02/5/2017 .Chieu length: 2300m, width: 108 serious 4-15m.Anh households and 30 highway from the city of Cao Lanh (Dong Thap) to Cambodia . Recent landslides 20m. Trend of development encroaching into the bank and extended neighborhood w	2300	River bank	South	Has planned to allocate capital or the government. Total cost: 244 billion.	3	0101000020E6100000D82AC1E270625A406F1283C0CA112540
88	89	Hau River, Vam Nao area, Cho Moi district (Phase 1) (submitted to the Government), An Giang	Hau River (Hau River, Vam Nao area, Cho Moi district (Phase 1) (submitted to the Government), An Giang)	Hau River, Vam Nao area, Cho Moi district (Phase 1) (submitted to the Government), An Giang	10.53961	105.53925	Featuring dangerous to plan allocating capital	Time: 2017.Chieu Length: 170 m.Anh enjoy residential, infrastructure works, roads.	175	River bank	South	Has planned to allocate capital or the government. Total cost: 134 billion.	3	0101000020E61000008D976E1283625A406A300DC347142540
89	90	Area Phu Da-Con Con Phu Binh, Cho Lach District, Ben Tre	Chien (Regional Con-Con Phu Da Phu Binh, Cho Lach District, Ben Tre)	Area Phu Da-Con Con Phu Binh, Cho Lach District, Ben Tre	10.24613	106.07643	Featuring dangerous no layout or design capital	Duration: From 2000 to nay.Chieu long: 500m.7 buildings, homes directly to leave; Other works 152 homes affected	500	River bank	South	Proposed new support. Total cost: 15 billion.	4	0101000020E6100000BB9BA73AE4845A40042159C0047E2440
90	91	Two river Mo Cay, in the area of ??town, Mo Cay Nam district	Mo Cay River (river Mo Cay)	Two river Mo Cay, in the area of ??town, Mo Cay Nam district	10.13399	106.3359	The danger point	Duration: long .Chieu: 3000m.Anh enjoy 02 households along the river banks, public buildings, factories, administrative buildings, public, ... of the town of Mo Cay	3000	River bank	South		2	0101000020E61000007DAEB6627F955A406AFB57569A442440
91	92	Area Long Tri Con, Long Duc commune.	From under the bridge toward Khem (Long Tri Con)	Area Long Tri Con, Long Duc commune.	9.98965	106.35285	The danger point	Time: Item nam.Chieu long: 2000m.Sat landslides affecting 309 households; 272ha of land and riverine production	2000	River bank	South		2	0101000020E610000031992A1895965A4009F9A067B3FA2340
92	93	Landslide areas along the Co Chien River, Dai Phuoc Commune	Co Chien river, Dai Phuoc Commune (riparian Chien)	Landslide areas along the Co Chien River, Dai Phuoc Commune	10.02698	106.29811	The danger point	Duration: Annual Length: 10,000 m, width of 2-10m, depth: 1.5 m Influence residential, infrastructure facilities: 844 households; 585ha	10000	River bank	South		2	0101000020E61000001327F73B14935A40CB4A9352D00D2440
93	94	Tiger area, Duc America.	Tigers hamlet American Association A (Area tiger)	Tiger area, Duc America.	10.07438	106.25112	The danger point	Time: Item nam.Chieu long: 2000m.Sat sores affect 23 households and production 27ha coastal land	2000	River bank	South		2	0101000020E6100000C7D79E5912905A40F5F3A62215262440
94	95	Erosion control embankments and canals Binh Hau river Remember, An Phu district, An Giang	Hau river and canal Binh Record (the Hau river and canal Binh Record)	Erosion control embankments and canals Binh Hau river Remember, An Phu district, An Giang	10.95518	105.08262	Featuring dangerous no layout or design capital	Length: 1100 m.	1100	River bank	South	Proposed new support. Total cost: 185 billion.	4	0101000020E6100000B77F65A549455A4029965B5A0DE92540
95	96	Confluence Saigon, Thanh Da channel upstream to the mechanical workshop Pioneers	Song Saigon (Saigon River Confluence)	Confluence Saigon, Thanh Da channel upstream to the mechanical workshop Pioneers	10.82203	106.72786	The danger point	Duration: Length: 2,797 m. Affecting residential and infrastructure projects	2797	River bank	South		2	0101000020E610000043041C4295AE5A4069A9BC1DE1A42540
96	97	Mechanical workshop Pioneers to fork incision Temple	Saigon River (Mechanical workshop Pioneers to fork incision Temple)	Mechanical workshop Pioneers to fork incision Temple	10.81183	106.74891	The danger point	Duration: Length: 4270 m Influence residential and infrastructure projects	4270	River bank	South		2	0101000020E61000006E693524EEAF5A40C8D2872EA89F2540
97	98	Rach Chua from Saigon to Fork - Thanh Da canal downstream.	Saigon River (From Rach Chua to Fork Saigon - Thanh Da canal downstream.)	Rach Chua from Saigon to Fork - Thanh Da canal downstream.	10.82024	106.73355	The danger point	Duration: Length: 2772 m Influence residential and infrastructure projects	2772	River bank	South		2	0101000020E6100000C5FEB27BF2AE5A40F9BD4D7FF6A32540
98	99	Middle School Giong Ong, Binh Trung Tay Ward, District 2, Ho Chi Minh City	Saigon (Middle School Giong Ong)	Middle School Giong Ong, Binh Trung Tay Ward, District 2, Ho Chi Minh City	10.78591	106.75497	The danger point	Duration: Length: 50 m Impact schools, residential and infrastructure projects	49	River bank	South		2	0101000020E610000083DDB06D51B05A40DF32A7CB62922540
99	100	Thoi Thuan Ward, Thot Not District	Bo Ot waterfront (Thoi Thuan Ward, Thot Not District)	Thoi Thuan Ward, Thot Not District	10.29301	105.50083	The danger point	Duration: 06.08.2017 Length: 403m Influence 32 households with 147 inhabitants, 28 houses are using less bare ground and 4 construction.	403	River bank	South		2	0101000020E6100000C3B645990D605A404BCD1E6805962440
100	101	Xuan Khanh Ward, Ninh Kieu District	Waterfront Tho (Xuan Khanh Ward, Ninh Kieu District)	Xuan Khanh Ward, Ninh Kieu District	10.02398	105.77506	The danger point	Time: 5/10/2016 Length: 100m Impact on regional transportation, Vincom Xuan Khanh	100	River bank	South		2	0101000020E6100000041C42959A715A402384471B470C2440
101	102	O Mon river erosion, An Thoi Ward, O Mon District, Can Tho	Area inflated (Mon river erosion, An Thoi Ward, O Mon District, Can Tho)	O Mon river erosion, An Thoi Ward, O Mon District, Can Tho	10.1447	105.6594	Featuring dangerous no layout or design capital	Time: 5/28/2017 Length: 380m Impact on traffic routes, as a petrol station sank into river	380	River bank	South	Proposed new support. Total cost: 25 billion.	4	0101000020E6100000E0BE0E9C336A5A4060764F1E164A2440
102	103	Chau Thanh District	Xang canal prostitution (Chau Thanh)	Chau Thanh District	9.94734	105.87361	The danger point	Duration: Length: 500m Affect residential, and regional transport links	500	River bank	South		2	0101000020E610000059DDEA39E9775A40A2629CBF09E52340
103	104	Embankments against salinization, climate change along Vam Co River City Tan An (from the Climate Change Program), Long An	Vam Co Tay River shore (embankment against salinization, climate change along Vam Co River City Tan An (from the Climate Change Program), Long An)	Embankments against salinization, climate change along Vam Co River City Tan An (from the Climate Change Program), Long An	10.54049	106.41709	Featuring dangerous to plan allocating capital	Duration: Length: 15,000m� Affect residential, and regional transport links	15000	River bank	South	Has planned to allocate capital or the government. Total cost: 420 billion.	3	0101000020E6100000465F419AB19A5A404DA1F31ABB142540
104	105	Cu Lao Tan Phong, Cai Lay District. Tien Giang	Waterfront Money (Cu Lao Tan Phong, Cai Lay District. Tien Giang)	Cu Lao Tan Phong, Cai Lay District. Tien Giang	10.31819	106.05439	The danger point	Duration: Length: 300 m, width: m depth: m Influence residential, infrastructure projects: 8 houses were damaged and 8 households to move to another place; 14,3ha land and had disappeared within 3 years (2014, 2015 and 2016)	300	River bank	South		2	0101000020E6100000AFCE31207B835A4017D4B7CCE9A22440
105	106	Reinforcing river stretch of shore erosion Long Lake, Long Phuoc commune	River Long Lake (Reinforcement landslides Long Lake River stretch of shore, Long Phuoc commune)	Reinforcing river stretch of shore erosion Long Lake, Long Phuoc commune	10.21071	105.98914	The danger point	Duration: Annual Length: 178 m, width 1 -2 m, depth: m Influence residential, infrastructure works:	178	River bank	South		2	0101000020E610000097CADB114E7F5A405DE15D2EE26B2440
106	107	Group 11, Hamlet Tac Truc, Nhon Hoi Commune, An Phu district	(Group 11, Hamlet Tac Truc, Nhon Hoi Commune, An Phu district)	Group 11, Hamlet Tac Truc, Nhon Hoi Commune, An Phu district	10.90103	105.04743	The danger point	Time: 4/2017 Length: 35m, width: 13m, depth: 12m Influence sliding length of more than 35 meters deep into the land 13 meters, a depth of about 12 meters, starting from the hamlet office Tac long structures downstream towards the center of the commune, c	35	River bank	South		2	0101000020E61000005BB6D61709435A40056EDDCD53CD2540
107	108	Makes 1 Ap Thuan commune Kien Thanh, Cho Moi district, An Giang	Rach Mr. Chuong (Hamlet Gets Thuan 1, commune Kien Thanh, Cho Moi district, An Giang)	Makes 1 Ap Thuan commune Kien Thanh, Cho Moi district, An Giang	10.51615	105.4347	The normal point	Deep cuts in inter-commune roads caused a river flowing down depots, 15 houses have to dismantle, at the crack length of about 200m.	200	River bank	South		1	0101000020E61000008FE4F21FD25B5A402AA913D044082540
108	109	Anti-erosion embankment Tien Sa Dec Town (Phase III)	Waterfront Cash (anti-erosion embankment in Tien Sa Dec Town (Phase III))	Anti-erosion embankment Tien Sa Dec Town (Phase III)	10.29136	105.77465	The normal point	Duration: Length: 1300m embankments against erosion phase III, the city Sa Dec to combat erosion urgent waterfront Money, protecting residential areas with about 8,000 households living stability and infrastructure in the area area, contributing to socio	1300	River bank	South		1	0101000020E61000002BF697DD93715A40A1B94E232D952440
109	110	Anti-erosion embankment Tien Hung B Commune of My An, Lap Vo district	Waterfront Cash (anti-erosion embankment in Tien)	Anti-erosion embankment Tien Hung B Commune of My An, Lap Vo district	10.40659	105.6143	The normal point	Duration: Annual Length: Up to 1900m landslide roads, buildings, houses riverside residents. Before serious erosion, Dong Thap People's Committee has directed the immediate construction of embankments against erosion Tien River region	1900	River bank	South		1	0101000020E6100000B37BF2B050675A40E3C281902CD02440
110	111	Ke Sach town, Ke Sach	Channel 1 (Ke Sach town, Ke Sach)	Ke Sach town, Ke Sach	9.77119	105.97674	The normal point	Duration: Length: 300m eroded embankment near the end, losing both road, endangering tens area households live	300	River bank	South		1	0101000020E61000007C2C7DE8827E5A4026016A6AD98A2340
111	112	Ba Trinh commune, Ke Sach	Channel 1 (Ba Trinh Commune, Ke Sach)	Ba Trinh commune, Ke Sach	9.80022	105.8566	The normal point	Duration: Length: 50m affect traffic and buildings in canal	50	River bank	South		1	0101000020E61000003B70CE88D2765A40D235936FB6992340
112	113	An Lac Thon town, Ke Sach	The channel Con (Town An Lac Thon, Ke Sach)	An Lac Thon town, Ke Sach	9.93049	105.8925	The normal point	Duration: Annual Length: 350m landslide is interlaced cracks appeared walls, floors; many are leaning towards the river, with sink to the river in the night ... hazardous to their homes and lives of the people here	350	River bank	South		1	0101000020E610000085EB51B81E795A4095826E2F69DC2340
113	114	An My Commune, Ke Sach District, Soc Trang	Channel 1 (An American Affairs, Ke Sach District, Soc Trang)	An My Commune, Ke Sach District, Soc Trang	9.75781	106.01929	Featuring dangerous no layout or design capital	Duration: Length: 500m Affect traffic, buildings and homes of the residents living in this area	500	River bank	South	Proposed new support. Total cost: 20 billion.	4	0101000020E6100000F3C81F0C3C815A40DC291DACFF832340
114	115	Ward 1, HCMC. Vinh Long	Waterfront Long Lake (Area Ward 1, Dist. Vinh Long)	Ward 1, HCMC. Vinh Long	10.25452	105.97659	The normal point	Time: from 2005 to now Length: 600m landslide caused 24 houses tilt pouring edge of the river towards the river market. May 11/2016, construction of embankments was started, but within a week the region has emerged signs of subsidence, cracking walls, cr	600	River bank	South		1	0101000020E610000071E65773807E5A40185B087250822440
115	116	Upstream My Thuan Bridge Tan Hoa commune, Vinh Long City	Chien river shore (Upstream My Thuan Bridge)	Upstream My Thuan Bridge Tan Hoa commune, Vinh Long City	10.27174	105.90005	The normal point	Duration: Annual Length: 5100 landslide roads, buildings, houses riverside residents.	5100	River bank	South		1	0101000020E6100000F2B0506B9A795A40B3075A81218B2440
116	117	Phu Quoi Hamlet, Phu An commune, Phu Tan district	Waterfront Money (Ap Phu Quoi)	Phu Quoi Hamlet, Phu An commune, Phu Tan district	10.66326	105.33535	The normal point	Duration: From 2005 to now Length: 40m Affecting to houses, the wharf and riverside roads in the region occurred landslide	40	River bank	South		1	0101000020E6100000ACADD85F76555A406B7D91D096532540
117	118	Lamb needs TUP 1 (SCS A hamlet, Vinh Divine, TP.Bac Lieu)	Tup Lamb estuary 1 (bridge Lamb TUP 1)	Lamb needs TUP 1 (SCS A hamlet, Vinh Divine, TP.Bac Lieu)	9.24402	105.82261	The normal point	Time: 2/21016 Length: 20m landslide swept away more than 50% abutments Lamb TUP, the 4-wheel drive vehicles can not walk	20	River bank	South		1	0101000020E610000034D769A4A5745A40CD237F30F07C2240
118	119	Tan Tien area, Dam Doi District, Ca Mau	River (Tan Tien area, Dam Doi District, Ca Mau)	Tan Tien area, Dam Doi District, Ca Mau	8.97041	105.32189	Featuring dangerous no layout or design capital	Duration: Annual Length: 4000m landslide affecting many roads, buildings, houses along the river. 05/01/2013 landslide engulfed large parts of buildings 4 households to small businesses, 78 adjacent households cracks, very high avalanche risk	4000	River bank	South	Proposed new support. Total cost: 80 billion.	4	0101000020E610000034BA83D899545A40376C5B94D9F02140
119	120	Shrimp river right bank canal, Hamlet 3, Nhon Duc Commune, Nha Be district, Ho Chi Minh	Waterfront canal shrimp (Right Bank canal River Prawn, Hamlet 3, Nhon Duc Commune, Nha Be district, Ho Chi Minh)	Shrimp river right bank canal, Hamlet 3, Nhon Duc Commune, Nha Be district, Ho Chi Minh	10.67166	106.69628	Featuring dangerous to plan allocating capital	Length: 40 m Impact residential and infrastructure projects	40	River bank	South	Has planned to allocate capital or government works	3	0101000020E6100000F836FDD98FAC5A400E10CCD1E3572540
120	121	Can Town. Nam Can District, Ca Mau	Waterfront (Town Nam. Nam Can District, Ca Mau)	Can Town. Nam Can District, Ca Mau	8.75893	104.98911	Featuring dangerous to plan allocating capital	Time: 2017 Length: 4000m Damaging home and property, economic losses, affecting the economic welfare	4000	River bank	South	Has planned to allocate capital or the government. Total cost: 120 billion.	3	0101000020E6100000618907944D3F5A4014E8137992842140
121	122	The canal area landslide Son Tho	Waterfront (Landslide Cai Son canal area, Can Tho)	The canal area landslide Son Tho	10.0261	105.74212	Featuring dangerous no layout or design capital	Time: 2017 Length: 20m influence and huge damage on the economy and people's lives in the landslide area	20	River bank	South	Total cost: 315 billion	4	0101000020E6100000486DE2E47E6F5A40E8D9ACFA5C0D2440
122	123	Hau river erosion, Long Xuyen City, An Giang	Waterfront (Landslide Hau River, Long Xuyen City, An Giang)	Hau river erosion, Long Xuyen City, An Giang	10.4141	105.42006	Featuring dangerous no layout or design capital	Time: 2010-2017 Length: 6000m, 20-25m wide, homeless, influence and huge damage and economic life of people in the landslide area	6000	River bank	South	Total cost: 378 billion.	4	0101000020E6100000E6965643E25A5A40158C4AEA04D42440
123	124	The left bank of the Saigon River, the end of the road number 7, Quarter 5, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City	Song Saigon (Saigon River Left Bank, Post Road No. 7, Quarter 5, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City)	The left bank of the Saigon River, the end of the road number 7, Quarter 5, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City	10.85023	106.71306	The normal point	This region is densely populated, with about 5 households affected	100	River bank	South	Feasibility Study Report has approved the construction of Decision No. 5828 / QD-SGTVT dated 31.10.2016	1	0101000020E61000007D0569C6A2AD5A40FA27B85851B32540
124	125	Rach Giong Ong left bank, upstream and downstream of the bridge Giong Ong 1, Binh Trung Tay Ward, District 2, Ho Chi Minh City	Rach Giong Ong (Rach Giong Ong left bank, upstream and downstream of the bridge Giong Ong 1, Binh Trung Tay Ward, District 2, Ho Chi Minh)	Rach Giong Ong left bank, upstream and downstream of the bridge Giong Ong 1, Binh Trung Tay Ward, District 2, Ho Chi Minh City	10.78947	106.75561	The normal point	These are densely populated area, with many households around affected. Market focus	100	River bank	South	Giong Ong To Bridge project new	1	0101000020E6100000F5A10BEA5BB05A40A3586E6935942540
125	126	Ap Cho Long Huu Dong Commune, Can Duoc District, Long An	Salty water channel (Ap Cho Long Huu Dong Commune, Can Duoc District, Long An)	Ap Cho Long Huu Dong Commune, Can Duoc District, Long An	10.49393	106.66699	The normal point	There are two ways of landfall Rach Cat dike about 100 m, close to the river fell 3 Rach Cat and Salty Water Channel. Two landslides locations spaced approximately 15 m, the length of each segment landslides about 150 meters, about 10 meters deep into th	1000	River bank	South	Has established investment projects but no money to perform	1	0101000020E61000009430D3F6AFAA5A40CD069964E4FC2440
126	127	Ap My Dien, Long Hung Commune Hamlet Long Huu Tay, Can Duoc District, Long An	Vam Co River, Salty Water Channel (Ap My Dien, Long Hung Commune Hamlet Long Huu Tay, Can Duoc District, Long An)	Ap My Dien, Long Hung Commune Hamlet Long Huu Tay, Can Duoc District, Long An	10.48602	106.66141	The normal point		1000	River bank	South	Has established investment projects but no money to perform	1	0101000020E6100000D5CF9B8A54AA5A4062670A9DD7F82440
127	128	Binh Hoa Hamlet, Tan Tru Town, Tan Tru District, Long An	Vam Co Tay River (Ap Binh Hoa, Tan Tru Town, Tan Tru District, Long An)	Binh Hoa Hamlet, Tan Tru Town, Tan Tru District, Long An	10.50954	106.50513	The normal point	Roll the entire orchards and coconut plantations of water for a family down the river, point landslide could only foundation of 1 households about 5 m, are appearing more cracks with a length of about 30 meters, capable of continuous landslides occur in	40	River bank	South		1	0101000020E61000009F8EC70C54A05A40F701486DE2042540
128	129	Rach lemon area, Loi Binh Nhon Commune, Tan An City, Long An	Vam Co Tay River, Rach Chanh (lemon Rach area, Loi Binh Nhon Commune, Tan An City, Long An)	Rach lemon area, Loi Binh Nhon Commune, Tan An City, Long An	10.55838	106.36864	The normal point		500	River bank	South		1	0101000020E6100000D6FF39CC97975A40207BBDFBE31D2540
129	130	River bank erosion West Ba Rai, Tan Binh Commune, Cai Lay Town, Tien Giang	Song Ba Rai (West Bank Landslide Song Ba Rai, Tan Binh Commune, Cai Lay Town, Tien Giang)	River bank erosion West Ba Rai, Tan Binh Commune, Cai Lay Town, Tien Giang	10.40724	106.11639	The normal point	120 affected households	3000	River bank	South	Being centrally compile dossiers of application support	1	0101000020E610000036E50AEF72875A40FF3EE3C281D02440
130	131	Tien river erosion in Thoi Son Island, Tien Giang	Song Tien (Tien River Landslide in Thoi Son Island, Tien Giang)	Tien river erosion in Thoi Son Island, Tien Giang	10.33063	106.30054	The normal point	30 affected households	500	River bank	South	Proposed building embankments, dikes moved into	1	0101000020E6100000F3C81F0C3C935A402827DA5548A92440
131	132	Landslide Phu Hiep Hamlet, Vinh Phu Hoa Binh, Cho Lach, Ben Tre	Chien (Landslide Phu Hiep Hamlet, Vinh Phu Hoa Binh, Cho Lach, Ben Tre)	Landslide Phu Hiep Hamlet, Vinh Phu Hoa Binh, Cho Lach, Ben Tre	10.25686	106.06941	The normal point	06 based emergency relocation, affecting 80 other households	500	River bank	South		1	0101000020E6100000FC00A43671845A40164D672783832440
132	133	Alcoholic Gorges (Hamlet 1,2,4), Tam Hiep Commune, Binh Dai district, Ben Tre	Song Tien (Con Gorges (Hamlet 1,2,4), Tam Hiep Commune, Binh Dai district, Ben Tre)	Alcoholic Gorges (Hamlet 1,2,4), Tam Hiep Commune, Binh Dai district, Ben Tre	10.30371	106.46486	The normal point		410	River bank	South		1	0101000020E6100000FD4D2844C09D5A40B3EF8AE07F9B2440
133	134	Alcoholic Chan, Thanh Thoi B, Mo Cay Nam district, Ben Tre	Chien River (Con Chan, Thanh Thoi B, Mo Cay Nam district, Ben Tre)	Alcoholic Chan, Thanh Thoi B, Mo Cay Nam district, Ben Tre	10.04046	106.30496	The normal point		500	River bank	South		1	0101000020E6100000A4A5F27684935A40A297512CB7142440
134	135	Con Tien Loi, Tien Long commune, Chau Thanh district, Ben Tre	Ham Luong River (Con Tien Loi, Tien Long commune, Chau Thanh district, Ben Tre)	Con Tien Loi, Tien Long commune, Chau Thanh district, Ben Tre	10.24558	106.25018	The normal point		1000	River bank	South		1	0101000020E61000004087F9F202905A40761A69A9BC7D2440
135	136	Hamlet 3, Ward Thanh Phuoc, Binh Minh Town, Vinh Long	Hau River (Hamlet 3, Ward Thanh Phuoc, Binh Minh Town, Vinh Long)	Hamlet 3, Ward Thanh Phuoc, Binh Minh Town, Vinh Long	10.05614	105.80008	The normal point	20 houses collapsed, displaced 34 households to safety, point landslide occurred at night, making 02 people (mothers and children) fall into the river, were rescued safely	200	River bank	South	PPC has declared Vinh Long emergencies	1	0101000020E6100000C18BBE8234735A40B0FECF61BE1C2440
136	137	Bring Fish Market area segment, Ke Sach District, Soc Trang	Channel 1 (The Fish Market area Wear, Ke Sach District, Soc Trang)	Bring Fish Market area segment, Ke Sach District, Soc Trang	9.77022	105.98506	The normal point	12 houses and affected structures	50	River bank	South	Proposed building concrete embankment 50m; relocation of 10 households	1	0101000020E6100000422619390B7F5A4043739D465A8A2340
137	138	Erosion dikes: An Thanh Frontier Station 3, Cu Lao Dung District, Soc Trang	Hau river (Landslide dike: An Thanh Frontier Station 3, Cu Lao Dung District, Soc Trang)	Erosion dikes: An Thanh Frontier Station 3, Cu Lao Dung District, Soc Trang	9.60521	106.2461	The normal point		4222	River bank	South		1	0101000020E6100000EBE2361AC08F5A40A06CCA15DE352340
138	139	Chau Phong commune. Tan Chau District, An Giang	Xang canal (Chau Phong Commune. Tan Chau District, An Giang)	Chau Phong commune. Tan Chau District, An Giang	10.77899	105.10753	The normal point	There are more than 500 households do not have places to live relocation lingered by the river erosion	770	River bank	South		1	0101000020E6100000B05582C5E1465A4074D2FBC6D78E2540
139	140	Ap Long Hoa, Long An Commune, Tan Chau District, An Giang	Xang canal (Ap Long Hoa, Long An Commune, Tan Chau District, An Giang)	Ap Long Hoa, Long An Commune, Tan Chau District, An Giang	10.79197	105.18283	The normal point	Emergency relocated 07 households	39	River bank	South		1	0101000020E610000092AE997CB34B5A4084D382177D952540
140	141	Ap 8 areas, Nam Cat Tien Commune, Tan Phu district, Dong Nai	Dong Nai River (area Ap 8, Nam Cat Tien Commune, Tan Phu district, Dong Nai)	Ap 8 areas, Nam Cat Tien Commune, Tan Phu district, Dong Nai	11.4048	107.42299	Featuring dangerous no layout or design capital	Consuming arable land of the people, the location landslides rural roads by about 9 m (main GT road social connections)	2000	River bank	South	Temporary fix, mainly cause landslides due to sand mining	4	0101000020E61000003E22A64412DB5A4073D712F241CF2640
141	142	Long Thanh Hamlet, Long Chau Ward, Tan Chau, An Giang	Tien river, canal Tan An (Long Thanh Hamlet, Long Chau Ward, Tan Chau, An Giang)	Long Thanh Hamlet, Long Chau Ward, Tan Chau, An Giang	10.80705	105.21343	Featuring dangerous no layout or design capital	Landslide area appeared unusually deep pit, where up to 35 meters and about 80 meters from shore. The cracks in this area lasted about 100 meters deep into the mainland 80 m great damage to the Corporation Imex Thinh Phu (affecting 8 si lo, every si lo w	100	River bank	South	Binzhou Committee declared a state of emergency in 2014	4	0101000020E61000000F7F4DD6A84D5A403E7958A8359D2540
142	143	Ap Binh Tan, Binh My Commune, Chau Phu district, An Giang	Hau River (Ap Binh Tan, Binh My Commune, Chau Phu district, An Giang)	Ap Binh Tan, Binh My Commune, Chau Phu district, An Giang	10.55486	105.27879	Featuring dangerous no layout or design capital	Influence and serious damage to Highway 91, for a length of 70m is subsidence, potentially losing both long distances to 180m, causing dozens of homes, production facilities and food vendors must be relocated urgently grade	130	River bank	South	Highway 91 solution gland deep Coastward	4	0101000020E6100000EB1C03B2D7515A4095B7239C161C2540
143	144	Landslide points petroleum depot Tran Quoc Toan, Cao Lanh City (containing 30 million liters of gasoline), Dong Thap	Song Tien (Score landslide petroleum depot Tran Quoc Toan, Cao Lanh City (containing 30 million liters of gasoline), Dong Thap)	Landslide points petroleum depot Tran Quoc Toan, Cao Lanh City (containing 30 million liters of gasoline), Dong Thap	10.50743	105.56147	Featuring dangerous no layout or design capital	Destroy piping and embankments, causing damage to businesses 15 billion; bridge collapsed completely broken main, the main piers are cracked, falling away gasoline tank measurement, issuers, fences and embankments. After the incident, temporary fuel depo	392	River bank	South	Built embankment in 2015-2016	4	0101000020E6100000D9EBDD1FEF635A40C0046EDDCD032540
144	145	Tien Duc Hamlet, Tien Thanh, Phan Thiet City, Binh Thuan	Temporary embankment erosion (Coast Tien Duc village, Tien Thanh, Phan Thiet City, Binh Thuan)	Tien Duc Hamlet, Tien Thanh, Phan Thiet City, Binh Thuan	10.81341	108.03108	The danger point	Length 200 m landslides, affecting the tourist area than the wind, tens cleft carved houses, 13 houses collapsed in rural coastal areas Tien Duc, Tien Thanh, Phan Thiet City.	200	Seaside	South		2	0101000020E6100000D2E3F736FD015B408D7A884677A02540
145	146	KV De Gi, Binh Dinh	Breakwater (KV De Gi, Binh Dinh)	KV De Gi, Binh Dinh	14.12303	109.20676	The normal point			Seaside	South		1	0101000020E6100000BE874B8E3B4D5B4090DAC4C9FD3E2C40
146	147	Thon An Chuan, Tan Duc Loi Ky, Mo Duc District, Quang Ngai Province	Landslide (Thon An Chuan, Tan Duc Loi Ky, Mo Duc District, Quang Ngai Province)	Thon An Chuan, Tan Duc Loi Ky, Mo Duc District, Quang Ngai Province	15.08147	108.90299	The danger point	Cleaning 300m riverbank erosion, coastal erosion erosion rate of about 1000 m (5m-10m / year).	300	Seaside	South		2	0101000020E61000005DA79196CA395B40D235936FB6292E40
147	148	Sea dike Go Cong Dong District, Tien Giang Province	Go Cong Dong coast (sea dike Roofs Go Cong Dong District, Tien Giang Province)	Sea dike Go Cong Dong District, Tien Giang Province	10.39703	106.78011	Featuring dangerous to plan allocating capital	Time: .Chieu length: 1400 m, width m, depth: m.Anh enjoy residential, infrastructure projects: 47 households displaced emergency	1400	Seaside	South	Has planned to allocate capital or the government. Total cost: 56 billion.	3	0101000020E610000015527E52EDB15A40D00F238447CB2440
148	149	Troubleshooting sea dike break through passage Lai Hoa, Vinh Chau Town, Soc Trang	Vinh Chau coast (Troubleshooting sea dike break through passage Lai Hoa, Vinh Chau Town, Soc Trang)	Troubleshooting sea dike break through passage Lai Hoa, Vinh Chau Town, Soc Trang	9.30141	105.98105	Featuring dangerous to plan allocating capital	Time: 1989 to now Length: 1600 m Influence residential, infrastructure works, roads	1600	Seaside	South	Has planned to allocate capital or the government. Total cost: 110 billion.	3	0101000020E6100000696FF085C97E5A40EE5F5969529A2240
149	150	Area recipients coast, Dong Hai commune, Bac Lieu	Along the coast of the East Village City (first point south shore flow vessels with large load on the Hau River khoang1,5 km) (Area recipients coast, Dong Hai commune, Bac Lieu)	Area recipients coast, Dong Hai commune, Bac Lieu	9.5359	106.4016	The danger point	Time: Item nam.Chieu long: 3000m.Anh enjoy 02 households along the river banks, public buildings, factories, administrative buildings, public, ... of the town of Mo Cay	2500	Seaside	South		2	0101000020E6100000B6847CD0B3995A4051DA1B7C61122340
150	151	East Coast area Whirlpool Vam Dat Mui commune and town of Rach Original (submitted to the Government), Ca Mau	Vam Whirlpool inlet (East Coast area Whirlpool Vam Dat Mui commune and town of Rach Original (submitted to the Government), Ca Mau)	East Coast area Whirlpool Vam Dat Mui commune and town of Rach Original (submitted to the Government), Ca Mau	8.56398	104.83438	Featuring dangerous to plan allocating capital	Length: 5,000 m, width: no place to enjoy 50m.Anh: 50m protective forest land here are waves and swept, people living in the region	5000	Seaside	South	Has planned to allocate capital or the government. Total cost: 272 billion.	3	0101000020E6100000EF1B5F7B66355A4038328FFCC1202140
151	152	Coast Ba Tri, Ben Tre	Coast in the area of ??alcohol addition (coast Ba Tri, Ben Tre)	Coast Ba Tri, Ben Tre	10.02502	106.68863	Featuring dangerous no layout or design capital	"Time: 2010-2017.Chieu long: do 2000m.Sat avalanche collapsed house 2 people, 4 cylinder medium voltage topple, causing blackouts area recipients, damaging 200m embankment under construction, 5 hectares lost white color. ""Cavitation"" deep into the earth t"	2000	Seaside	South	Proposed new support. Total cost: 50 billion.	4	0101000020E6100000D942908312AC5A40E97DE36BCF0C2440
152	153	Thanh Phong Commune, Thanh Hai, Thanh Phu district, Ben Tre province	Coast Thanh Phu district, Ben Tre (Thanh Phong Commune, Thanh Hai, Thanh Phu district, Ben Tre province)	Thanh Phong Commune, Thanh Hai, Thanh Phu district, Ben Tre province	9.82708	106.65399	Featuring dangerous no layout or design capital	Coastal erosion and Thanh Hai Thanh Phong Commune, Thanh Phu District, Ben Tre Province Time: 2015-2017 Length: 3000m Influence residential, infrastructure works, roads, economic losses heavy	3000	Seaside	South	Proposed new support. Total cost: 140 billion.	4	0101000020E61000004E7ADFF8DAA95A40F3599E0777A72340
153	154	Coast Binh Dai, Ben Tre	Lighthouse lamp (Coast Binh Dai, Ben Tre)	Coast Binh Dai, Ben Tre	10.13534	106.78481	Featuring dangerous no layout or design capital	Date: 05/2016 Length: 500m Influence houses 11 buildings and 60 ha of agricultural land	500	Seaside	South	Proposed new support. Total cost: 10 billion.	4	0101000020E6100000B8E4B8533AB25A4068AED3484B452440
154	155	Anti-erosion embankment Hiep Thanh (phase 1). (From the Climate Change Program), Tra Vinh	Along the coast hamlet Cell (anti-erosion embankment in Hiep Thanh (phase 1). (Program Climate Change), Tra Vinh)	Anti-erosion embankment Hiep Thanh (phase 1). (From the Climate Change Program), Tra Vinh	9.73431	106.56805	Featuring dangerous to plan allocating capital	Time: Item nam.Chieu long: 2000m.Anh enjoy 100 works, housing and production land 73ha coastal households	2000	Seaside	South	Has planned to allocate capital or the government. Total cost: 37 billion.	3	0101000020E61000008A1F63EE5AA45A406440F67AF7772340
155	156	Coast area Truong Long Hoa commune.	Along the coast of hatching insects (Coast Truong Long Hoa commune)	Coast area Truong Long Hoa commune.	9.66532	106.58072	The danger point	Time: Item nam.Chieu long: 500m.7 buildings, homes directly to leave; Other works 152 homes affected	7000	Seaside	South		2	0101000020E6100000850838842AA55A40DBBFB2D2A4542340
156	157	Western sea dike embankments New texts - Da Bac, Ca Mau	West Ca Mau sea dyke (embankment protecting sea dykes West New texts - Da Bac, Ca Mau)	Western sea dike embankments New texts - Da Bac, Ca Mau	9.17832	104.81195	Featuring dangerous to plan allocating capital	Length: 250m.Anh enjoy residential, infrastructure works: Three Point slides 250m in length located 10 meters from the coast.	250	Seaside	South	Has planned to allocate capital or government works	3	0101000020E61000002EFF21FDF6335A40087250C24C5B2240
157	158	Chengde Affairs	(Social Chengde)	Chengde Affairs	10.11789	106.79095	The danger point	Time: 2016 Length: 100-2000 m, width 10-300 m, depth: m Influence residential, infrastructure works, roads: Ap Thua Middle: 60 hectares of agricultural land are affected directly displaced, 11 houses and affected. Ap Thua Tien: 28 hectares of aquaculture		Seaside	South		2	0101000020E61000005BB1BFEC9EB25A40060DFD135C3C2440
158	159	Nha Mat embankment area, Bac Lieu	Nha Mat estuary (Area embankment Nha Mat, Bac Lieu)	Nha Mat embankment area, Bac Lieu	9.20372	105.74401	Featuring dangerous no layout or design capital	Time: 2/2017 Length: 12000m landslide are many passages serious damaged embankments, flooding homes, brick floor was also knocked	12000	Seaside	South	Proposed new support. Total cost: 250 billion.	4	0101000020E610000068791EDC9D6F5A400E15E3FC4D682240
159	160	Ho Gui estuary, Tam Giang commune, Dong, Nam Can District	Ho Gui inlet (inlet Ho Gui)	Ho Gui estuary, Tam Giang commune, Dong, Nam Can District	8.82647	105.30634	The normal point	Time: Annual Length: 1000m T2 / 2017 landslide areas affecting 314 hectares of shrimp ponds, many forests very important protective forest were lost	1000	Seaside	South		1	0101000020E61000003A5D16139B535A4010406A1327A72140
160	161	Ho Gui estuary, Tam Giang commune, Dong, Nam Can District	Ho Gui inlet (inlet Ho Gui)	Ho Gui estuary, Tam Giang commune, Dong, Nam Can District	8.82475	105.30533	The normal point	Time: Annual Length: 1000m T2 / 2017 landslide areas affecting 314 hectares of shrimp ponds, many forests very important protective forest trees were lost.	1000	Seaside	South		1	0101000020E6100000361FD7868A535A4083C0CAA145A62140
161	162	Vam Theravada, Van Khanh Tay commune, An Minh District	Coast (Van Khanh Tay commune, An Minh District)	Vam Theravada, Van Khanh Tay commune, An Minh District	9.53454	104.83704	The normal point	Duration: Annual Length: 700m farming area blank Loss seafood, sea dykes eroded many areas, protective forests eroded grave grave impact on the lives of coastal residents	700	Seaside	South		1	0101000020E6100000685C381092355A40C4CE143AAF112340
162	163	Vam Kim Quy, Van Khanh commune, An Minh District	Coast (Vam Kim Quy)	Vam Kim Quy, Van Khanh commune, An Minh District	9.57528	104.83965	The normal point	Time: Annual Length: 300m landslide loss aquaculture area near the coastal and forest protection, direct impact to the coastal people's life	300	Seaside	South		1	0101000020E610000088855AD3BC355A40F415A4198B262340
163	164	Quarter 2, An Thoi Town, Phu Quoc District	Coast (Quarter 2, An Thoi Town, Phu Quoc District)	Quarter 2, An Thoi Town, Phu Quoc District	10.01701	104.00819	The normal point	Duration: Annual Length: 360m landslide coast and embankments, the area of ??Phu Quoc in danger of shrinking	360	Seaside	South		1	0101000020E6100000DF89592F86005A40F168E388B5082440
164	165	From Quarter 3 and Quarter Quarter 6 to 9, the town of Duong Dong, Phu Quoc Island	Coast (from Quarter 3 and Quarter Quarter 6 to 9)	From Quarter 3 and Quarter Quarter 6 to 9, the town of Duong Dong, Phu Quoc Island	10.22795	103.9533	The normal point	Duration: Annual Length: 2108m landslide coast, deep subsidence housing	2108	Seaside	South		1	0101000020E6100000B7D100DE02FD5940143FC6DCB5742440
165	166	Ocean Beach area of ??Wells Beach Village and Hon Trem Hamlet, Binh An Commune, Kien Luong district	Coast (Beach Ocean Area)	Ocean Beach area of ??Wells Beach Village and Hon Trem Hamlet, Binh An Commune, Kien Luong district	10.1481	104.61598	The normal point	Duration: Length: 314m landslide toppled poplar, collapsed breakwater of the people	314	Seaside	South		1	0101000020E61000005DBF60376C275A40401361C3D34B2440
166	167	Ocean Beach area of ??Wells Beach Village and Hon Trem Hamlet, Binh An Commune, Kien Luong district	Coast (Beach Ocean Area)	Ocean Beach area of ??Wells Beach Village and Hon Trem Hamlet, Binh An Commune, Kien Luong district	10.14487	104.62587	The normal point	Duration: Length: 174m landslide toppled poplar, collapsed breakwater of the people	174	Seaside	South		1	0101000020E61000000B630B410E285A40D15790662C4A2440
167	168	Tan Phu coastal, Tan Phu Dong District, Tien Giang Province	coast (Coastal Phu Tan - speed 3km (from 1965-1989))	Tan Phu coastal, Tan Phu Dong District, Tien Giang Province	10.21321	106.78419	sedimentation	3km sedimentation rate (from 1965 to 1989)		Seaside	South		0	0101000020E61000006AF6402B30B25A403E5C72DC296D2440
168	169	Bao Thuan An commune to Cards, Ba Tri District, Ben Tre Province	Coast (Bao Thuan Commune to Security Cards - speed 3-10m / year)	Bao Thuan An commune to Cards, Ba Tri District, Ben Tre Province	9.97659	106.69846	sedimentation	Sedimentation speed 3-10m / year		Seaside	South		0	0101000020E61000001B649291B3AC5A408733BF9A03F42340
169	170	Coastal strip Duyen Hai District, Tra Vinh Province	Coast (coastal strip coastal district - speed of 60m / year)	Coastal strip Duyen Hai District, Tra Vinh Province	9.52322	106.37257	sedimentation	Sedimentation speed of 60m / yr		Seaside	South		0	0101000020E6100000205ED72FD8975A40EB39E97DE30B2340
170	171	Khai communes along Vietnam to Phong Dien, Phu Tan district, Ca Mau province	Coast (Vertical Vietnam Khai Commune, Phong Dien to - speed 15-20m / year)	Khai communes along Vietnam to Phong Dien, Phu Tan district, Ca Mau province	8.89887	104.79815	sedimentation	Sedimentation speed 15-20m / year		Seaside	South		0	0101000020E61000005BD3BCE314335A4007B64AB038CC2140
171	172	Hiep Thanh commune, Duyen Hai tx, Tra Vinh	Coast (Hiep Thanh Commune - speed of 30m / year)	Hiep Thanh commune, Duyen Hai tx, Tra Vinh	9.64799	106.57567	sedimentation	Sedimentation speed of 30m / yr		Seaside	South		0	0101000020E610000074D2FBC6D7A45A4024456458C54B2340
172	173	TT Vam Lang to Tan Thanh, Go Cong Dong District, Tien Giang Province	Coast (TT Vam Lang to Xincheng - landslides speed> 10m / year)	TT Vam Lang to Tan Thanh, Go Cong Dong District, Tien Giang Province	10.3892	106.78187	The speed point landslide	Landslide speed> 10m / year		Seaside	South		5	0101000020E61000004EEE77280AB25A40D734EF3845C72440
173	174	Chengde Commune, Binh Dai district, Ben Tre province	Coast (Social Chengde - Landslide speed 10-15m / year)	Chengde Commune, Binh Dai district, Ben Tre province	10.14624	106.78889	The speed point landslide	Landslide speed 10-15m / year		Seaside	South		5	0101000020E61000000D897B2C7DB25A40EDBB22F8DF4A2440
174	175	Hiep Thanh commune, Duyen Hai town, Tra Vinh	Coast (Hiep Thanh Commune - Landslide speed of 30m / year)	Hiep Thanh commune, Duyen Hai town, Tra Vinh	9.7194	106.59691	The speed point landslide	Landslide speed of 30m / yr		Seaside	South		5	0101000020E6100000F12900C633A65A401C7C613255702340
175	176	Lai Hoa, Vinh Chau, Soc Trang to Vinh Trach Dong, Bac Lieu	Coast (Lai Hoa, Vinh Chau to Vinh Zedong - Landslide speed 7m / year)	Lai Hoa, Vinh Chau, Soc Trang to Vinh Trach Dong, Bac Lieu	9.24995	105.8419	The speed point landslide	Landslide speed 7m / year		Seaside	South		5	0101000020E610000027A089B0E1755A4039454772F97F2240
176	177	TT Ganh Hao, next door Ganh Hao	Coast (TT Ganh Hao, next door Ganh Hao - Landslide speed 17m / year)	TT Ganh Hao, next door Ganh Hao	9.02372	105.43135	The speed point landslide	Landslide speed 17m / year		Seaside	South		5	0101000020E61000004BC8073D9B5B5A40B2852007250C2240
177	178	Paragraph recesses Nang_Ca Mau	Coast (Section recesses Nang_Ca Mau - Landslide speed of 40m / year)	Paragraph recesses Nang_Ca Mau	8.69736	105.14695	The speed point landslide	Landslide speed of 40m / yr		Seaside	South		5	0101000020E61000006C09F9A067495A40BE13B35E0C652140
178	179	Tay Yen Commune, An Bien District, Kien Giang Province	Coast (Tay Yen Commune - Landslide speed 5-10m / year)	Tay Yen Commune, An Bien District, Kien Giang Province	9.94205	105.0511	The speed point landslide	Landslide speed 5-10m / year		Seaside	South		5	0101000020E6100000D734EF3845435A40C364AA6054E22340
179	180	Son Binh commune along, Hon Dat District, Kien Giang Province	Coast (Vertical Son Binh iron foot speed 5-10m / year)	Son Binh commune along, Hon Dat District, Kien Giang Province	10.08728	104.91493	The speed point landslide	Landslide speed 5-10m / year		Seaside	South		5	0101000020E610000046088F368E3A5A409430D3F6AF2C2440
180	181	BinhTri to Hon Chong commune nose, tx Kien Luong, Kien Giang Province	Coast (BinhTri nose Affairs Hon Chong - Landslide speed of 5m / year)	BinhTri to Hon Chong commune nose, tx Kien Luong, Kien Giang Province	10.13564	104.64563	The speed point landslide	Landslide speed of 5m / year		Seaside	South		5	0101000020E610000041D47D0052295A40130F289B72452440
181	182	Dan Thanh commune area, tx coast, Tra Vinh	Coast (Dan Thanh commune area - Landslide speed 5-10m / year)	Dan Thanh commune area, tx coast, Tra Vinh	9.59078	106.53896	The speed point landslide	Landslide speed 5-10m / year		Seaside	South		5	0101000020E61000008A7615527EA25A40034356B77A2E2340
182	183	New channel drain	Coast (bulky New - Landslide speed 35-40m / year)	New channel drain	9.16716	104.85901	The speed point landslide	Landslide speed 35-40m / year		Seaside	South		5	0101000020E6100000F73B1405FA365A401366DAFE95552240
183	184	drains T29	Coast (Cong T29 - Landslide speed 15-20m / year)	drains T29	9.30491	104.82455	The speed point landslide	Landslide speed 15-20m / year		Seaside	South		5	0101000020E6100000ADFA5C6DC5345A405C72DC291D9C2240
184	185	Sea dyke An Bien, Kien Giang Province	Coast (Sea Dyke An Bien, Kien Giang province)	Sea dyke An Bien, Kien Giang Province	9.62432	104.85443	Featuring dangerous no layout or design capital	Time landslide landslide 2015 -2017 Length: 4500M	4500	Seaside	South	Proposed new support. Total cost: 90 billion.	4	0101000020E610000029AE2AFBAE365A403A7AFCDEA63F2340
185	186	Clips from the Huong Mai Tieu Dua, Ca Mau	Coast (Clips from the Huong Mai Tieu Dua, Ca Mau)	Clips from the Huong Mai Tieu Dua, Ca Mau	9.52982	104.83684	Featuring dangerous to plan allocating capital	Time landslide: 2015 -2017 landslide Length: 14.774m	14 775	Seaside	South	Has planned to allocate capital or government works	3	0101000020E610000004FF5BC98E355A4090882991440F2340
186	187	Section from Lung Ranh to Khanh Hoi, Ca Mau	Sea (Clips from Lung Ranh to Khanh Hoi, Ca Mau)	Section from Lung Ranh to Khanh Hoi, Ca Mau	9.37548	104.83038	Featuring dangerous to plan allocating capital	Time landslide: 2014 -2017 landslide length: 7.750m	7750	Seaside	South	Has planned to allocate capital or government works	3	0101000020E610000029D027F224355A40AA9A20EA3EC02240
187	188	West Coast Tran Van Thoi period (from WB9), Ca Mau	Coast (West Coast Tran Van Thoi period (from WB9), Ca Mau)	West Coast Tran Van Thoi period (from WB9), Ca Mau	9.27406	104.82397	Featuring dangerous to plan allocating capital	Length: 17 732 m	17 732	Seaside	South	Has planned to allocate capital or government works	3	0101000020E6100000A6B8AAECBB345A409548A297518C2240
188	189	Ganh Hao town, Dong Hai District, Bac Lieu Province	Embankment Ganh Hao (Town Ganh Hao, Dong Hai District, Bac Lieu Province)	Ganh Hao town, Dong Hai District, Bac Lieu Province	9.02244	105.41805	Featuring dangerous to plan allocating capital	Coastal erosion Ganh Hao town, Dong Hai District, Bac Lieu Province Time: 2017 Length: 2000 m Influence residential, infrastructure works, roads, ecotourism	2000	Seaside	South	Has planned to allocate capital or the government. Total cost: 212 billion.	3	0101000020E6100000F085C954C15A5A40963E74417D0B2240
189	190	Vinh Tan Commune, Tuy Phong district, Binh Thuan	Coast (Vinh Tan Commune, Tuy Phong district, Binh Thuan)	Vinh Tan Commune, Tuy Phong district, Binh Thuan	11.32166	108.81595	Featuring dangerous no layout or design capital	Toppling 46 homes, threaten directly to 300 households, after the embankment of General Port Vinh Tan is built, the situation landslide Vinh Tan repeated many times over the years with the influence day The more serious	800				4	0101000020E6100000F54A598638345B40DBDC989EB0A42640
