{
  "fields": [{"type":"int","id":"_id"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"commitment"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"commitment_cad"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"commitment_eur"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"commitment_gbp"},{"info":{"label":"Ending day"},"type":"timestamp","id":"day_end"},{"info":{"label":"Day length"},"type":"numeric","id":"day_length"},{"info":{"label":"Starting day"},"type":"timestamp","id":"day_start"},{"info":{"label":"Location code"},"type":"text","id":"location_code"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"location_latitude"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"location_longitude"},{"info":{"label":"Location name"},"type":"text","id":"location_name"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"spend"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"spend_cad"},{"info":{"label":"Spend in eur"},"type":"numeric","id":"spend_eur"},{"info":{"exclude":"True","label":""},"type":"numeric","id":"spend_gbp"},{"info":{"label":"Status"},"type":"text","id":"status_code"},{"info":{"label":"Title"},"type":"text","id":"title"},{"info":{"exclude":"True","label":"Description"},"type":"text","id":"description"},{"info":{"label":"Reference"},"type":"text","id":"view_detail"}],
  "records": [
    [1,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",15.583,107.917,"Tinh Quang Nam",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [2,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",16.083,108.083,"Thanh Pho Da Nang",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [3,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",21.333,106.433,"Tinh Bac Giang",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [4,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","PPLC",21.025,105.841,"Ha Noi",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [5,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",18.333,105.75,"Tinh Ha Tinh",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [6,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",12.333,109,"Tinh Khanh Hoa",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [7,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",21.25,107.333,"Tinh Quang Ninh",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [8,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",16.75,107,"Tinh Quang Tri",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [9,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","",11.333,106.167,"Tinh Tay Ninh",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [10,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","STM",15.863,108.274,"Song Thu Bon",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [11,153464000,205220000,125412000,83541100,"2012-12-31T00:00:00",4339,"2001-02-13T00:00:00","STMX",15.846,108.117,"Song Vu Gia",159177000,167954000,116907000,98804200,"Completion","VIETNAM WATER RESOURCES ASSISTANCE","The project development objective for the Vietnam Water Resources Assistance Project has three parts: (i) foster agricultural diversification and gains in productivity through irrigation system modernization, and thereby raise farm household incomes and reduce rural poverty; (ii) establish effective systems of  dam safety management and lower the risks associated with dams; and (iii) promote the environmentally sustainable development and management of  water resources in the Thu Bon River Basin. There are four project components. Component 1, Irrigation Modernization, modernizes infrastructure and management for six of  Vietnam's largest irrigation schemes, including remedial dam safety works. Component 2, Dam Safety Management, finances remedial safety works on additional dams and supports the establishment of  a dam safety unit in the Ministry of  Agriculture and Rural Development. . The component alsof inances dam safety instrumentation and data acquisition systems for Hoa Binh dam. Component 3, Thu Bon Basin Development, finances river control works, and initiates a river basin management program through institutional development and preparation of feasibility studies. Component 4, Project Management and Capacity Building, provides technical assistance, training, monitoring and evaluation, and project management support.","http://d-portal.org/q.html?aid=44000-P065898"],
    [12,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","ADM1",15.583,107.917,"Tinh Quang Nam",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [13,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [14,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [15,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","",20.067,105.333,"Tinh Thanh Hoa",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [16,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [17,65216500,75901000,51672500,38275400,"2015-03-31T00:00:00",5005,"2001-07-17T00:00:00","",19.25,104.917,"Tinh Nghe An",66403000,70750500,49877000,40606600,"Completion","VN - Forest Sector Development Project","The Forest Sector Development Project will achieve sustainable management of plantation forests, and conservation of biodiversity in special forests uses. The project components are as follows: 1) strengthening forest management and biodiversity conservation, through the revision of selected policies, and regulations regarding the management of production plantation forest, and special forests uses (e.g.: improved forest land allocation guidelines; development of management regulations to enable forestry management boards to enter into co-management agreements with local stakeholders; and, incentive and tax systems to support forestry plantation). In addition, farm forestry groups will be established to develop smallholder forestry, and the promotion of forest plantation certification to ensure environmental sustainability, higher prices, and improved and secured market access for participating households. 2) based on different cropping systems, forest plantations will be established, including fast-growing plantations, mixed forestry-agriculture crops, and fruit trees, as well as promoting small-scale tree growing by rural communities. A participatory approach will involve village consultations, and technical and environmental screening of proposed sites, including land allocation, and certification for land uses rights. Extension and services delivery shall assist smallholders in forestry plantation activities, plantation design and management, and, plantation investments in the form of credits; 3) conservation, and sustainable use of biodiversity resources will be financed, through the establishment of an innovative financing mechanism, namely, the Vietnam Conservation Fund (VCF) to administer a competitive small grants program, including monitoring and reporting, and, implementing conservation needs assessments; and, 4) project management activities will include t","http://d-portal.org/q.html?aid=44000-P066051"],
    [18,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.333,105.567,"Tinh Vinh Phuc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [19,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",8.96,105.241,"Huyen Dam Doi",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [20,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.001,105.042,"Huyen Cai Nuoc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [21,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.127,104.923,"Huyen Tran Van Thoi",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [22,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",9.3,105.5,"Tinh Bac Lieu",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [23,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",16.488,107.289,"Huyen Phong Dien",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [24,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [25,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",14.955,108.888,"Huyen Mo Duc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [26,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",14.987,108.8,"Huyen Nghia Hanh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [27,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",15.319,108.764,"Huyen Binh Son",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [28,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",15.095,108.771,"Huyen Tu Nghia",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [29,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.333,105.133,"Tinh Phu Tho",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [30,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",21.244,105.497,"Huyen Vinh Tuong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [31,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.921,107.933,"Huyen Ham Thuan Nam",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [32,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.937,108.158,"Thi Xa Phan Thiet",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [33,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.399,107.4,"Huyen Tan Phu",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [34,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",15.837,107.979,"Huyen Dai Loc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [35,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",15.899,108.225,"Huyen Dien Ban",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [36,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.667,105.833,"Tinh Thai Nguyen",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [37,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.559,105.009,"Huyen Tinh Bien",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [38,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.414,104.961,"Huyen Tri Ton",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [39,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.572,105.17,"Huyen Chau Phu",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [40,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.811,106.997,"Huyen Phuoc Long",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [41,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.679,106.604,"Huyen Binh Long",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [42,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.105,106.615,"Huyen Ben Cat",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [43,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",16.083,108.083,"Tinh Da Nang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [44,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.333,106.433,"Tinh Bac Giang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [45,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.1,106.1,"Tinh Bac Ninh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [46,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",12.124,108.531,"Huyen Lac Duong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [47,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.584,107.528,"Huyen Da Teh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [48,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",11.931,108.474,"Thanh Pho Da Lat",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [49,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",21.135,105.842,"Huyen Dong Anh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [50,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",21.083,107.303,"Thi Xa Cam Pha",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [51,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.656,106.346,"Thanh Pho Tan An",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [52,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.689,106.455,"Huyen Ben Luc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [53,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.577,106.673,"Huyen Can Giuoc",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [54,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",13.95,108.008,"Thi Xa Pleiku",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [55,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.229,104.953,"Huyen Hon Dat",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [56,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.095,105.259,"Huyen Tan Hiep",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [57,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.651,105.531,"Huyen Long My",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [58,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.801,105.7,"Huyen Phung Hiep",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [59,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.235,105.532,"Huyen Thot Not",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [60,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.125,105.593,"Huyen O Mon",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [61,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.921,105.817,"Huyen Chau Thanh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [62,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.469,105.712,"Huyen Thanh Tri",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [63,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.442,105.885,"Thi Xa Vinh Chau",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [64,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",9.608,105.807,"Huyen My Tu ",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [65,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM2",10.236,106.378,"Thi Xa Ben Tre",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [66,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",9.294,105.728,"Bac Lieu",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [67,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [68,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","LCTY",21.483,103.767,"Chieng Ngam",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [69,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",21.033,107.367,"Cua Ong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [70,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",12.75,108.25,"Tinh Dak Lak",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [71,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",11.946,108.442,"Da Lat",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [72,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",16.068,108.221,"Turan",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [73,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",11,107.167,"Tinh Dong Nai",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [74,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",20.865,106.683,"Hai Phong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [75,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",22.75,105,"Tinh Ha Giang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [76,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [77,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",15.879,108.335,"Hoi An",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [78,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",20.95,107.073,"Ha Long",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [79,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",12.333,109,"Tinh Khanh Hoa",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [80,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",10.286,104.646,"Kien Luong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [81,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",22.283,103.25,"Tinh Lai Chau",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [82,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",10.7,106.167,"Tinh Long An",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [83,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",9.637,105.764,"Long Hung",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [84,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",21.067,107.35,"Mong Duong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [85,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",9.624,105.823,"My Huong",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [86,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",8.759,104.993,"Nam Can",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [87,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.25,107.333,"Tinh Quang Ninh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [88,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [89,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",9.6,105.972,"Soc Trang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [90,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.167,104,"Tinh Son La",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [91,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",15.574,108.474,"Tam Ky",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [92,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",17.717,106.417,"My Trach",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [93,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [94,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [95,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [96,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",9.564,105.854,"Thuan Hung",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [97,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [98,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",9.537,105.806,"Lam Kiet",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [99,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","STMI",11.417,106.1,"Suoi Vang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [100,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","PPL",9.22,105.715,"Vinh Hau",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [101,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",22.3,104.167,"Tinh Lao Cai",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [102,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",21.75,104.583,"Tinh Yen Bai",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [103,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",22.117,105.25,"Tinh Tuyen Quang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [104,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",9.55,105.917,"Tinh Soc Trang",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [105,249527000,370074000,255746000,168195000,"2012-12-31T00:00:00",4031,"2001-12-18T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",297820000,329871000,219750000,171602000,"Completion","VN-SYSTEM ENERGY, EQUITIZATION&RENEWAB","This project paper seeks the approval of the Executive Directors to provide an additional credit to the Socialist Republic of Vietnam for the System Efficiency Improvement, Equitization and Renewables Project. The additional credit will help fill the financing gap resulting from cost overrun in physical investments caused by unanticipated macroeconomic conditions beyond the control of implementing agencies; and additional technical assistance activities that will scale up the project's impact and development objective of sustaining power sector reform.","http://d-portal.org/q.html?aid=44000-P066396"],
    [106,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",20.869,106.657,"Hong Bang",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [107,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",20.873,106.588,"Huyen An Duong",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [108,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",20.806,106.636,"Quan Kien An",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [109,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",20.858,106.702,"Quan Ngo Quyen",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [110,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",20.846,106.674,"Quan Le Chan",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [111,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.703,106.565,"Huyen Binh Chanh",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [112,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.851,106.747,"Quan Thu Duc",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [113,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.836,106.672,"Quan Go Vap",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [114,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.805,106.705,"Quan Binh Thanh",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [115,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.808,106.654,"Quan Tan Binh",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [116,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.801,106.678,"Quan Phu Nhuan",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [117,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.871,106.656,"Quan Muoi hai",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [118,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.763,106.646,"Quan Muoi mot",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [119,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.774,106.667,"Quan Muoi",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [120,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.82,106.823,"Quan Chin",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [121,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.727,106.637,"Quan Tam",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [122,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.733,106.729,"Quan Bay",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [123,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.743,106.635,"Quan Sau",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [124,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.755,106.668,"Quan Nam",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [125,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.758,106.706,"Quan Bon",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [126,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.783,106.691,"Quan Ba",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [127,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.782,106.76,"Quan Hai",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [128,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM2",10.773,106.699,"Quan Mot",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [129,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","PPLA",10.037,105.788,"Can Tho",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [130,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","ADM1",20.8,106.667,"Thanh Pho Hai Phong",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [131,350712000,433009000,264901000,199019000,"2014-12-31T00:00:00",4418,"2002-11-26T00:00:00","PPLA",20.434,106.177,"Nam Dinh",353680000,384022000,272814000,219825000,"Completion","VN-URBAN UPGRADING","The objectives of the Vietnam Urban Upgrading Project are to alleviate poverty in urban areas by improving the living and environmental conditions of the urban poor using participatory planning methods, and influencing planning processes to become more inclusive and pro-poor. The project will be carried out in four cities-Ho Chi Minh City and Can Tho in the south, and Haiphong and Nam Dinh in the north. All four cities have numerous low-income, infrastructure-deficient communities with low grade housing. For each city, six components will be financed: Tertiary Infrastructure Upgrading, Complementary Primary and Secondary Infrastructure, Resettlement Housing, Land and Housing Management, Housing Improvement Loan Program, and Capacity Building. A separate component (Component 7) will finance the development of a National Urban Upgrading Program which will be managed by the Ministry of Construction.","http://d-portal.org/q.html?aid=44000-P070197"],
    [132,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",9.776,105.464,"Hau Giang",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [133,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",16.579,107.494,"Huyen Quang Dien",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [134,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",16.456,107.576,"Thanh Pho Hue",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [135,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",14.78,108.979,"Huyen Duc Pho",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [136,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",18.476,105.329,"Huyen Huong Son",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [137,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",18.191,106.002,"Huyen Cam Xuyen",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [138,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",11.276,108.385,"Huyen Bac Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [139,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",15.433,108.574,"Huyen Nui Thanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [140,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",15.583,107.917,"Tinh Quang Nam",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [141,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.559,105.009,"Huyen Tinh Bien",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [142,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.414,104.961,"Huyen Tri Ton",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [143,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.572,105.17,"Huyen Chau Phu",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [144,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.657,105.285,"Huyen Phu Tan",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [145,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.477,105.491,"Huyen Cho Moi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [146,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.32,105.267,"Huyen Thoai Son",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [147,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.369,105.423,"Thi Xa Long Xuyen",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [148,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",17.536,106.283,"Huyen Bo Trach",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [149,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",16.676,107.234,"Huyen Hai Lam",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [150,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",19.987,105.615,"Huyen Yen Dinh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [151,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",19.227,105.644,"Huyen Quynh Luu",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [152,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",18.739,105.241,"Huyen Thanh Chuong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [153,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.883,105.804,"Huyen Vinh Hung",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [154,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.834,105.688,"Huyen Tan Hung",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [155,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.752,106.017,"Huyen Moc Hoa",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [156,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.865,106.259,"Huyen Duc Hue",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [157,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.667,106.167,"Huyen Thanh Hoa",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [158,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.689,106.455,"Huyen Ben Luc",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [159,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.532,106.404,"Thi Xa Tan An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [160,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.229,104.953,"Huyen Hon Dat",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [161,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.871,105.491,"Huyen Tan Hong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [162,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.811,105.293,"Huyen Hong Ngu",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [163,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.728,105.525,"Huyen Tam Nong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [164,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.601,105.478,"Huyen Thanh Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [165,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.544,105.819,"Huyen Thap Muoi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [166,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.468,105.71,"Huyen Cao Lanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [167,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.241,105.663,"Huyen Lai Vung",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [168,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.225,105.824,"Huyen Chau Thanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [169,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",9.801,105.7,"Huyen Phung Hiep",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [170,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.235,105.532,"Huyen Thot Not",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [171,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.125,105.593,"Huyen O Mon",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [172,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",9.921,105.817,"Huyen Chau Thanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [173,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",9.975,106.01,"Huyen Tra On",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [174,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.087,106.16,"Huyen Vung Liem",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [175,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.136,105.776,"Huyen Binh Minh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [176,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.081,105.954,"Huyen Tam Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [177,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.216,105.985,"Huyen Long Phuoc",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [178,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.388,105.946,"Huyen Cai Be",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [179,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.389,106.068,"Huyen Cai Lay",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [180,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM2",10.066,106.606,"Huyen Ba Tri",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [181,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.5,105.167,"Tinh An Giang",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [182,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.6,105.417,"An Phong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [183,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.017,106.133,"Ap An Phuoc",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [184,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.933,105.1,"Ap Khanh An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [185,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.494,104.907,"Ap Ba Chuc",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [186,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.452,105.353,"Ap Binh Phu",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [187,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.4,105.75,"Ap My Hoa (1)",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [188,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.683,105.333,"Ap Phu Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [189,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.367,106.117,"Ap Phu My (2)",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [190,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.6,105.833,"Ap Thap Muoi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [191,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.733,105.1,"Ap Vinh An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [192,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.608,106.052,"Kinh Bac Dong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [193,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.317,106.067,"Rach Ba Rai",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [194,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [195,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [196,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.85,106.283,"Binh Thanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [197,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.783,106.267,"Kinh Bo Bo",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [198,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.174,106.111,"Cai Nhum",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [199,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.054,105.803,"Rach Cai Von",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [200,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.65,105.2,"Rach Can Thao",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [201,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.035,105.791,"Rach Can Tho",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [202,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLI",10.85,105.567,"Kinh Cong Hoa",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [203,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [204,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.659,105.779,"Kinh Phuoc Xuyen",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [205,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.659,105.782,"Kinh Duong Van Duong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [206,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.767,106.233,"Tinh Long An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [207,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",11.083,108.083,"Tinh Binh Thuan",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [208,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [209,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPLC",21.025,105.841,"Ha Noi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [210,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [211,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.8,105.35,"Hong Ngu",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [212,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",12.333,109,"Tinh Khanh Hoa",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [213,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10,105.167,"Tinh Kien Giang",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [214,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.286,104.646,"Kien Luong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [215,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.7,106.167,"Tinh Long An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [216,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.733,106.433,"Luong Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [217,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","LCTY",10.433,104.933,"Luong Phi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [218,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.164,106.169,"Song Mang Thit",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [219,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STMX",16.6,107.25,"Rach My Chanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [220,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.515,105.558,"Kinh Nguyen Van Tiep",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [221,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",9.767,105.983,"Ke Sach",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [222,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",13.167,109.083,"Tinh Phu Yen",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [223,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",17.5,106.333,"Tinh Quang Binh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [224,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [225,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [226,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPLA",10.012,105.081,"Rach Gia",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [227,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.015,105.09,"Kinh Rach Gia di Long Xuyen",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [228,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.291,105.756,"Sa Dec",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [229,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","HLL",10.265,105.273,"Nui Sap",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [230,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.927,105.397,"Rach Sa Rai",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [231,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.826,105.341,"Prek Kraom",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [232,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STMM",18.451,105.927,"Cua Sot",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [233,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","LCTY",10.15,105.2,"Tan Hiep",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [234,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",9.793,105.377,"Kinh Thac Lac",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [235,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [236,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [237,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",9.9,105.333,"Kinh Thot Not",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [238,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [239,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [240,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.19,104.927,"Kinh Tri Ton",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [241,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.506,106.558,"Song Vam Co Dong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [242,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","STM",10.502,106.556,"Song Vam Co Tay",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [243,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PCLI",16.167,107.833,"Socialist Republic of Vietnam",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [244,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","LCTY",10.433,105.233,"Vinh Hanh",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [245,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPLA",10.254,105.972,"Vinh Long",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [246,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.667,105.083,"Vinh Te",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [247,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.533,104.599,"Kinh Vinh Te",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [248,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","LCTY",10.35,105.333,"Vinh Trach",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [249,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.096,106.185,"Vung Liem",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [250,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",10.45,106.1,"Kinh Phu Thuan",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [251,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","CNLN",9.755,105.416,"Kinh Xa No",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [252,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",10.123,105.016,"Xom Ta Lua Moi",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [253,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",20.383,105.6,"Yen Lac",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [254,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","PPL",20.1,105.6,"Yen Phong",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [255,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [256,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",11.75,108.833,"Tinh Ninh Thuan",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [257,155070000,172902000,127184000,94820300,"2013-12-31T00:00:00",4058,"2002-11-21T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",161210000,170767000,119055000,100962000,"Completion","VN -Natural Disaster Risk Mngt Project","The objectives of the Natural Disasters Risk Management Project for Vietnam are the establishment and implementation of comprehensive natural disaster risk management framework to assist the Government to: (a) strengthen the capacity of national and local disaster risk management institutions; (b) reduce the vulnerability to flood and storm hazards in project areas; and (c) increase the efficiency of post-disaster recovery and reconstruction efforts. The executing agency, the Ministry of Agriculture and Rural Development (MARD) in close collaboration with the Ministry of Natural Resources and Environment (MONRE), has prepared a detailed implementation plan for the remaining activities towards project completion. Agreement on the pending contents and procedures for an International Competitive Bidding (ICB) procurement of hydromet equipment is expected to occur in the coming weeks enabling the start of the bidding process in July 2011. If this does indeed occur it is expected that the closing date will be extended for a further six months to the end of June 2012 to enable the completion of the procurement and the equipment installation. This will be the second extension of the project. As a result, a total extension period of 18 months will be made from the original closing date.","http://d-portal.org/q.html?aid=44000-P073361"],
    [258,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",21.016,106.504,"Huyen Kinh Mon",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [259,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.896,106.434,"Huyen Thanh Ha",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [260,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.78,106.222,"Huyen Thanh Mien",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [261,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.852,106.291,"Huyen Gia Loc",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [262,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.628,105.962,"Tien Noi",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [263,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [264,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",18.351,105.811,"Huyen Thach Ha",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [265,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",18.349,105.892,"Thi Xa Ha Tinh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [266,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",13.846,109.153,"Huyen Tuy Phuoc",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [267,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM1",21.1,106.1,"Tinh Bac Ninh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [268,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",19.826,105.583,"Huyen Trieu Son",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [269,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",11.819,108.212,"Huyen Lam Ha",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [270,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",11.753,108.554,"Huyen Don Duong",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [271,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",11.425,107.638,"Huyen Da Hu Oai",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [272,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.806,106.636,"Quan Kien An",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [273,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.595,106.212,"Huyen Hung Ha",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [274,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM2",20.544,106.341,"Huyen Dong Hung",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [275,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",11.533,107.783,"Ap Tan Ha",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [276,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [277,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",14.429,109.016,"Bong Son",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [278,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",20.209,105.47,"Huong Cam Thuy",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [279,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",19.033,105.033,"Binh Son",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [280,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",18.317,105.917,"Thach Binh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [281,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPLA",20.865,106.683,"Hai Phong",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [282,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPLA",18.343,105.906,"Ha Tinh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [283,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM1",11.667,108.083,"Tinh Lam Dong",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [284,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",20.092,105.368,"Huong Ngoc Lac",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [285,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",20.9,105.833,"Nguyet Ang",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [286,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",19.7,105.683,"Nong Cong",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [287,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",20.662,106.327,"Quynh Coi",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [288,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",14.547,109.043,"Tam Quan",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [289,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [290,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [291,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",19.446,105.779,"Tinh Gia",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [292,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",13.827,109.167,"Tuy Phuoc",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [293,80194900,104219000,59219900,37882700,"2013-06-30T00:00:00",3489,"2003-12-11T00:00:00","PPL",21.05,106.383,"Tan Dan",83059900,85619200,61837800,51692500,"Completion","VN-WATER SUPPLY DEV.","The development objective of the Urban Water Supply Development Project for Vietnam is to improve water, and household sanitation services in district towns, and large urban centers in ways that are financially, and environmentally sustainable, thus enhancing the health, and economic potential of resident households. Project implementation has improved during the last twelve months. All contracts have been awarded with physical progress of all works combined reaching 70 percent as of May 30, 2012 with an overall International Development Association (IDA) disbursement rate of more than 55 percent. It is expected that by June 30, 2012 the project will be substantially completed, with eighty seven percent (87 percent) of the IDA funds (US$ 98.0 million) committed and an expected cancellation of the uncommitted IDA funds (US$ 14.6 million). The project currently has an overall rating of moderately satisfactory. Notwithstanding recent improvement, the project has met with implementation difficulties during the previous seven years which have led to the project restructuring. The changes are: (i) partial cancellation of the credit amount; (ii) first time extension of the credit closing date for selected provinces and project components to June 30, 2013; (iii) a reduction in the number of provinces anticipated to participate in component A; (iv) a change in the design/build/operate contracting process in component A to design/build only with operations assumed by the water utilities directly; (v) inclusion of an additional province in component B; (vi) a name change of the implementing institution for component C; (vii) a revision of first schedule, withdrawal of the proceeds of the credit to reflect the actual costs and disbursements; (viii) a revision of second schedule, description of the project, to specify the name of project participating provinces and of the content","http://d-portal.org/q.html?aid=44000-P073763"],
    [294,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM1",21.333,105.567,"Tinh Vinh Phuc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [295,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.71,106.197,"Huyen Phu Cu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [296,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.746,106.036,"Huyen Kim Dong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [297,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.685,106.125,"Huyen Tien Lu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [298,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM1",20.817,106.05,"Tinh Hung Yen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [299,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.137,106.396,"Huyen Chi Linh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [300,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.016,106.504,"Huyen Kinh Mon",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [301,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.005,106.34,"Huyen Nam Sach",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [302,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.938,106.51,"Huyen Kim Thanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [303,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.896,106.434,"Huyen Thanh Ha",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [304,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.804,106.414,"Huyen Tu Ky",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [305,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.78,106.222,"Huyen Thanh Mien",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [306,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.852,106.291,"Huyen Gia Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [307,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.876,106.191,"Huyen Binh Giang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [308,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.95,106.217,"Huyen Cam Giang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [309,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",8.96,105.241,"Huyen Dam Doi",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [310,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",9.127,104.923,"Huyen Tran Van Thoi",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [311,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM1",9.083,105.083,"Tinh Ca Mau",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [312,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.788,104.12,"Huyen Mu Cang Chai",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [313,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.486,104.428,"Huyen Tram Tau",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [314,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.9,104.567,"Huyen Van Yen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [315,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.557,104.64,"Huyen Van Chan",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [316,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",13.251,109.206,"Huyen Tuy An",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [317,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.271,107.885,"Huyen Phu Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [318,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.378,107.469,"Huyen Huong Tra",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [319,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.488,107.289,"Huyen Phong Dien",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [320,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.579,107.494,"Huyen Quang Dien",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [321,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.47,107.715,"Huyen Phu Vang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [322,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",16.315,107.624,"Huyen Huong Thuy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [323,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.501,106.03,"Huyen Binh Luc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [324,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.462,105.921,"Huyen Thanh Liem",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [325,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.573,105.85,"Huyen Kim Bang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [326,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.628,105.962,"Huyen Duy Tien",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [327,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.78,108.979,"Huyen Duc Pho",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [328,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.955,108.888,"Huyen Mo Duc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [329,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.987,108.8,"Huyen Nghia Hanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [330,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.954,108.677,"Huyen Minh Long",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [331,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.319,108.764,"Huyen Binh Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [332,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.191,108.743,"Huyen Son Tinh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [333,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.095,108.771,"Huyen Tu Nghia",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [334,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.476,105.329,"Huyen Huong Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [335,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.497,105.61,"Huyen Duc Tho",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [336,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.624,105.768,"Huyen Nghi Xuan",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [337,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.444,105.764,"Huyen Can Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [338,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.351,105.811,"Huyen Thach Ha",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [339,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.17,105.698,"Huyen Huong Khe",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [340,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.058,106.246,"Huyen Ky Anh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [341,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.191,106.002,"Huyen Cam Xuyen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [342,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.419,105.485,"Huyen Lap Thach",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [343,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.244,105.497,"Huyen Vinh Tuong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [344,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.218,105.576,"Huyen Yen Lac",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [345,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.182,105.711,"Huyen Me Linh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [346,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.557,108.801,"Huyen An Lao",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [347,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.339,108.904,"Huyen Hoai An",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [348,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.211,108.744,"Huyen Vinh Thanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [349,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.505,109.023,"Huyen Hoai Nhon",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [350,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.223,109.086,"Huyen Phu My",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [351,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",14.05,109.081,"Huyen Phu Cat",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [352,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",13.943,108.88,"Huyen Tay Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [353,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",13.664,108.962,"Huyen Van Canh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [354,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",13.87,109.063,"Huyen An Nhon",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [355,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",13.846,109.153,"Huyen Tuy Phuoc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [356,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.433,108.574,"Huyen Nui Thanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [357,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.471,108.283,"Huyen Tien Phuoc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [358,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.539,108.095,"Huyen Hiep Duc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [359,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.837,107.979,"Huyen Dai Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [360,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.899,108.225,"Huyen Dien Ban",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [361,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.79,108.202,"Huyen Duy Xuyen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [362,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.712,108.262,"Huyen Que Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [363,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.687,108.392,"Huyen Thang Binh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [364,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",15.592,108.506,"Thi Xa Tam Ky",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [365,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.901,105.733,"Huyen Bao Lac",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [366,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.908,106.125,"Huyen Ha Quang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [367,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.624,105.932,"Huyen Nguyen Binh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [368,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.477,106.342,"Huyen Thach An",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [369,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.709,106.677,"Huyen Ha Lang",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [370,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.833,106.561,"Huyen Trung Khanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [371,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.81,106.325,"Huyen Tra Linh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [372,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.708,106.225,"Huyen Hoa An",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [373,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.654,105.89,"Huyen Dong Hy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [374,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.756,105.723,"Huyen Phu Luong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [375,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.905,105.621,"Huyen Dinh Hoa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [376,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.634,105.615,"Huyen Dai Tu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [377,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.412,105.824,"Huyen Pho Yen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [378,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.49,105.963,"Huyen Phu Binh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [379,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",17.913,106.027,"Huyen Tuyen Hoa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [380,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",17.834,106.367,"Huyen Quang Trach",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [381,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",17.536,106.283,"Huyen Bo Trach",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [382,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",17.271,106.514,"Huyen Quang Ninh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [383,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",17.112,106.705,"Huyen Le Thuy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [384,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.528,104.629,"Huyen Muong Lat",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [385,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.476,104.953,"Huyen Quan Hoa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [386,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.167,105.667,"Huyen Thach Thanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [387,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.016,105.99,"Huyen Nga Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [388,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.196,105.468,"Huyen Cam Thuy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [389,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.937,105.241,"Huyen Thuong Xuan",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [390,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.703,105.793,"Huyen Quang Xuong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [391,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",11.712,107.753,"Huyen Bao Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [392,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.374,102.738,"Huyen Muong Te",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [393,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.607,103.392,"Huyen Phong Tho",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [394,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.299,103.275,"Huyen Sin Ho",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [395,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.034,103.123,"Huyen Muong Lay",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [396,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.954,103.373,"Huyen Tua Chua",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [397,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.695,103.418,"Huyen Tuan Giao",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [398,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",21.253,103.269,"Huyen Dien Bien Dong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [399,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.595,106.212,"Huyen Hung Ha",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [400,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.539,106.517,"Huyen Thai Thuy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [401,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.385,106.529,"Huyen Tien Hai",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [402,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.401,106.42,"Huyen Kien Xuong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [403,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.544,106.341,"Huyen Dong Hung",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [404,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.437,106.265,"Huyen Vu Thu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [405,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.557,105.092,"Huyen Quy Chau",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [406,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.382,105.441,"Huyen Nghia Dan",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [407,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.227,105.644,"Huyen Quynh Luu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [408,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.116,105.197,"Huyen Tan Ky",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [409,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.929,105.083,"Huyen Anh Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [410,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.893,105.34,"Huyen Do Luong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [411,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",19.027,105.436,"Huyen Yen Thanh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [412,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.989,105.576,"Huyen Dien Chau",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [413,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.831,105.624,"Huyen Nghi Loc",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [414,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.67,105.526,"Huyen Nam Dan",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [415,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",18.678,105.625,"Huyen Hung Nguyen",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [416,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.422,105.621,"Huyen Yen Thuy",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [417,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.688,105.548,"Huyen Kim Boi",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [418,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.876,105.512,"Huyen Luong Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [419,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.606,105.234,"Huyen Tan Lac",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [420,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.663,105.031,"Huyen Mai Chau",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [421,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",20.896,105.397,"Huyen Ky Son",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [422,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.07,104.181,"Huyen Van Ban",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [423,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.51,104.308,"Huyen Bac Ha",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [424,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.671,104.118,"Huyen Muong Khuong",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [425,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.568,103.713,"Huyen Bat Xat",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [426,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",22.338,103.84,"Huyen Sa Pa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [427,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",10.194,106.645,"Huyen Binh Dai",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [428,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",10.159,106.47,"Huyen Giong Trom",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [429,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",10.227,106.171,"Huyen Cho Lach",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [430,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",10.07,106.364,"Huyen Mo Cay",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [431,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM2",9.93,106.543,"Huyen Thanh Phu",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [432,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [433,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [434,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPL",8.759,104.993,"Nam Can",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [435,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPL",22.533,106.517,"Phuc Hoa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [436,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPL",15.167,108.783,"Phu Ninh (2)",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [437,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPL",22.695,104.279,"Si Ma Kai",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [438,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPLA",20.45,106.34,"Thai Binh",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [439,403737000,472439000,291779000,225406000,"2014-06-30T00:00:00",3714,"2004-04-29T00:00:00","PPLA",13.095,109.321,"Tuy Hoa",422336000,442307000,310674000,260617000,"Completion","VN-RURAL ENERGY 2","The objective of the Second Rural Energy Project for Vietnam is to improve access to good quality, affordable electricity services to rural communities in the project provinces in an efficient and sustainable manner, to support Vietnam's efforts toward socio-economic development. This paper pertains to a restructuring of the project to amend a portion of the financing agreement and to revise the disbursement letter to increase the ceiling of the designated account of Northern Power Corporation (NPC) for faster disbursement for the last period of the project. The purpose of the restructuring is to allow the following: (a) management of the low voltage system by the NPC; (b) support for the rehabilitation and expansion of the low voltage grid networks using a part of the credit proceeds; and (c) increase in the ceiling of the designated account of the NPC.","http://d-portal.org/q.html?aid=44000-P074688"],
    [440,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",21.884,105.277,"Huyen Yen Son",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [441,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",21.636,105.389,"Huyen Son Duong",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [442,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.333,105.567,"Tinh Vinh Phuc",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [443,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",20.71,106.197,"Huyen Phu Cu",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [444,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",20.746,106.036,"Huyen Kim Dong",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [445,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",20.685,106.125,"Huyen Tien Lu",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [446,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.817,106.05,"Tinh Hung Yen",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [447,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.917,106.333,"Tinh Hai Duong",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [448,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.25,105.833,"Tinh Bac Kan",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [449,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [450,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.25,106.25,"Tinh Nam Dinh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [451,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.333,105.133,"Tinh Phu Tho",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [452,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",15.471,108.283,"Huyen Tien Phuoc",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [453,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",15.539,108.095,"Huyen Hiep Duc",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [454,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM2",15.712,108.262,"Huyen Que Son",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [455,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",15.583,107.917,"Tinh Quang Nam",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [456,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.667,105.833,"Tinh Thai Nguyen",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [457,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.333,106.433,"Tinh Bac Giang",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [458,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.1,106.1,"Tinh Bac Ninh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [459,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.333,102.933,"Huyen Dien Bien",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [460,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [461,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.75,106.083,"Tinh Cao Bang",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [462,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","PPL",21.833,105.4,"Cong Da",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [463,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.75,105,"Tinh Ha Giang",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [464,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [465,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [466,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.283,103.25,"Tinh Lai Chau",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [467,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.833,106.583,"Tinh Lang Son",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [468,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.667,105.333,"Tinh Hoa Binh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [469,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",13.167,109.083,"Tinh Phu Yen",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [470,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",17.5,106.333,"Tinh Quang Binh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [471,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [472,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [473,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","PPL",15.674,108.22,"Que Son",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [474,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","PPL",15.717,108.35,"Binh Nguyen",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [475,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.167,104,"Tinh Son La",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [476,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [477,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [478,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [479,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","PPL",15.717,108.45,"Binh Hai",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [480,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.3,104.167,"Tinh Lao Cai",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [481,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",21.75,104.583,"Tinh Yen Bai",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [482,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",22.117,105.25,"Tinh Tuyen Quang",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [483,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",20.233,105.9,"Tinh Ninh Binh",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [484,197091000,216157000,157239000,119142000,"2014-06-30T00:00:00",3484,"2004-12-15T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",203821000,212754000,151407000,127879000,"Completion","VN-Rural Transport 3","The development objective of the Third Rural Transport Project (RTP3) is to reduce travel costs and improve access to markets, off-farm economic opportunities, and social services for poor rural communities in the 33 participating provinces in Northern and Central Vietnam. The purpose of this restructuring paper is to request an approval for retroactive financing of an additional 35 percent of eligible expenses for all expenditure categories under the Development Credit Agreement (DCA) for the RTP3. The following changes to the original credit were requested: 1) extending the closing date of the credit; 2) increasing the ceiling of special account from 10,000,000 USD to 14,800,000 USD for International Development Association (IDA) funds; 3) reallocating credit proceeds and increase IDA's financed expenses percentage from 65 percent to 100 percent; and 4) approval for retroactive financing for an additional 35 percent of eligible expenses with effect September 1, 2011. The restructuring is assessed as being a level two restructuring as it does not include modifications in the project's development objective, changes in the safeguards category, nor the triggering of a new safeguards policy.","http://d-portal.org/q.html?aid=44000-P075407"],
    [485,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",21.333,105.567,"Tinh Vinh Phuc",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [486,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.817,106.05,"Tinh Hung Yen",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [487,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",21.016,106.504,"Huyen Kinh Mon",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [488,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.938,106.51,"Huyen Kim Thanh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [489,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.78,106.222,"Huyen Thanh Mien",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [490,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.876,106.191,"Huyen Binh Giang",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [491,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",16.456,107.576,"Thanh Pho Hue",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [492,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.628,105.962,"Tien Noi",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [493,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [494,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.309,106.361,"Huyen Xuan Truong",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [495,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.377,106.097,"Huyen Vu Ban",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [496,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.25,106.25,"Tinh Nam Dinh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [497,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",21.333,105.133,"Tinh Phu Tho",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [498,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",21.1,106.1,"Tinh Bac Ninh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [499,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.347,105.864,"Huyen Gia Vien",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [500,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.19,106.096,"Huyen Yen Khanh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [501,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.13,106.002,"Huyen Yen Mo",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [502,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.06,106.099,"Huyen Kim Son",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [503,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",21.027,105.79,"Quan Cau Giay",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [504,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.539,106.517,"Huyen Thai Thuy",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [505,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.385,106.529,"Huyen Tien Hai",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [506,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.401,106.42,"Huyen Kien Xuong",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [507,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM2",20.437,106.265,"Huyen Vu Thu",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [508,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","PPL",20.933,105.217,"Yen Son",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [509,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",12.75,108.25,"Tinh Dac Lak",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [510,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","PPLA",20.971,105.779,"Ha Dong",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [511,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","PPLC",21.025,105.841,"Ha Noi",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [512,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",21,105.75,"Thu Do Ha Noi",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [513,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [514,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [515,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","LK",21.017,105.85,"Ho Hoan Kiem",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [516,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","PPL",21.033,105.817,"Kim Ma",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [517,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","PPL",21.56,106.624,"Tan Son",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [518,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","DLTA",10.333,106.667,"Mekong Delta",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [519,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",21.25,107.333,"Tinh Quang Ninh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [520,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","STM",20.248,106.587,"Red River",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [521,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [522,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [523,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",20.233,105.9,"Tinh Ninh Binh",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [524,103501000,113684000,85271600,64881900,"2013-06-30T00:00:00",3426,"2004-02-12T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",105559000,108098000,78655100,66328700,"Completion","VN-RRD RWSS","This project paper provides an additional credit to the Socialist Republic of Vietnam for first phase of the Red River Delta Rural Water Supply and Sanitation Project. The additional credit will help finance the costs associated with completion of the original project activities within the same project areas that could not be finished as a result of unanticipated cost over-runs. The cost over-runs are due to high inflation and design changes necessary due to increased demand for connections and capacity in the original project areas that were higher than appraisal estimates. The additional credit will allow for the completion of the original target of coverage in 120 communes in first phase of the project, whereas current resources are sufficient for only 52 communes. As a result, 450,000 more people would have access to a piped water source and improved hygiene facilities achieving the original target of an estimated 800,000 beneficiaries. The project is also expected to introduce sustainable management models for rural water supply schemes, with tariffs set at a level sufficient to cover operations, maintenance and debt service.","http://d-portal.org/q.html?aid=44000-P077287"],
    [525,67938100,82550800,56467700,36076600,"2013-12-31T00:00:00",3441,"2004-07-30T00:00:00","PPLA",16.068,108.221,"Hai Chau",73469400,76747800,55030200,45742500,"Completion","VN -ICT Development","This project paper seeks the approval of the Executive Directors to restructure the Vietnam Information and Communication Technologies (ICT) Development Project to reflect changes in the demand for International Development Association (IDA) resources from the participating ministries and cities. The following changes are: 1) modification of the project development objectives (PDOs) and performance targets to focus more narrowly on project activities funded by IDA. The development credit agreement will be amended to reflect the restructuring; 2) reallocation of funds to increase the credit amounts allocated to the General Statistical Office's (GSO) subproject by $6.76 million and to the Danang subproject by $10 million; 3) scaling down the Hanoi subproject by $11.38 million; 4) reallocation of funds to increase the credit amounts to the Ministry of Information and Communications (MIC) subproject by $4.79 million to implement the Ministry of Foreign Affairs (MOFA) activities; 5) cancellation of the remaining Hanoi and Ho Chi Minh City (HCMC) subproject, leaving $10,000 for payment of completed activity; and 6) cancellation of the excess IDA funds of $5.46 million as a result of the above reallocations.","http://d-portal.org/q.html?aid=44000-P079344"],
    [526,67938100,82550800,56467700,36076600,"2013-12-31T00:00:00",3441,"2004-07-30T00:00:00","PPLC",21.025,105.841,"Ha Noi",73469400,76747800,55030200,45742500,"Completion","VN -ICT Development","This project paper seeks the approval of the Executive Directors to restructure the Vietnam Information and Communication Technologies (ICT) Development Project to reflect changes in the demand for International Development Association (IDA) resources from the participating ministries and cities. The following changes are: 1) modification of the project development objectives (PDOs) and performance targets to focus more narrowly on project activities funded by IDA. The development credit agreement will be amended to reflect the restructuring; 2) reallocation of funds to increase the credit amounts allocated to the General Statistical Office's (GSO) subproject by $6.76 million and to the Danang subproject by $10 million; 3) scaling down the Hanoi subproject by $11.38 million; 4) reallocation of funds to increase the credit amounts to the Ministry of Information and Communications (MIC) subproject by $4.79 million to implement the Ministry of Foreign Affairs (MOFA) activities; 5) cancellation of the remaining Hanoi and Ho Chi Minh City (HCMC) subproject, leaving $10,000 for payment of completed activity; and 6) cancellation of the excess IDA funds of $5.46 million as a result of the above reallocations.","http://d-portal.org/q.html?aid=44000-P079344"],
    [527,67938100,82550800,56467700,36076600,"2013-12-31T00:00:00",3441,"2004-07-30T00:00:00","",10.823,106.63,"Thanh pho Ho Chi Minh",73469400,76747800,55030200,45742500,"Completion","VN -ICT Development","This project paper seeks the approval of the Executive Directors to restructure the Vietnam Information and Communication Technologies (ICT) Development Project to reflect changes in the demand for International Development Association (IDA) resources from the participating ministries and cities. The following changes are: 1) modification of the project development objectives (PDOs) and performance targets to focus more narrowly on project activities funded by IDA. The development credit agreement will be amended to reflect the restructuring; 2) reallocation of funds to increase the credit amounts allocated to the General Statistical Office's (GSO) subproject by $6.76 million and to the Danang subproject by $10 million; 3) scaling down the Hanoi subproject by $11.38 million; 4) reallocation of funds to increase the credit amounts to the Ministry of Information and Communications (MIC) subproject by $4.79 million to implement the Ministry of Foreign Affairs (MOFA) activities; 5) cancellation of the remaining Hanoi and Ho Chi Minh City (HCMC) subproject, leaving $10,000 for payment of completed activity; and 6) cancellation of the excess IDA funds of $5.46 million as a result of the above reallocations.","http://d-portal.org/q.html?aid=44000-P079344"],
    [528,183469000,199435000,135222000,99703900,"2014-11-30T00:00:00",3547,"2005-03-15T00:00:00","PPLA",17.469,106.622,"Dong Hoi",185533000,195862000,141375000,116157000,"Completion","VN-COASTAL CITIES ENVMT SANIT.","The development objective of the Additional Financing for the Coastal Cities Environmental and Sanitation Project is to improve the environmental sanitation in the project cities in a sustainable manner thereby enhancing the quality of life for city residents. This project paper seeks the approval of the Executive Directors to provide an additional International Development Association (IDA) credit in an amount of US$65.3 million equivalent to the socialist Republic of Vietnam project. The Additional Financing (AF) will bridge an unanticipated financing gap resulting from a period of exceptionally high inflation in 2007-08 exacerbated by low original cost estimates. The Ministry of planning and investment officially requested the AF from the World Bank in a letter dated September 24, 2010. No extension of the closing date is being requested.","http://d-portal.org/q.html?aid=44000-P082295"],
    [529,183469000,199435000,135222000,99703900,"2014-11-30T00:00:00",3547,"2005-03-15T00:00:00","PPLA",12.245,109.194,"Nha Trang",185533000,195862000,141375000,116157000,"Completion","VN-COASTAL CITIES ENVMT SANIT.","The development objective of the Additional Financing for the Coastal Cities Environmental and Sanitation Project is to improve the environmental sanitation in the project cities in a sustainable manner thereby enhancing the quality of life for city residents. This project paper seeks the approval of the Executive Directors to provide an additional International Development Association (IDA) credit in an amount of US$65.3 million equivalent to the socialist Republic of Vietnam project. The Additional Financing (AF) will bridge an unanticipated financing gap resulting from a period of exceptionally high inflation in 2007-08 exacerbated by low original cost estimates. The Ministry of planning and investment officially requested the AF from the World Bank in a letter dated September 24, 2010. No extension of the closing date is being requested.","http://d-portal.org/q.html?aid=44000-P082295"],
    [530,183469000,199435000,135222000,99703900,"2014-11-30T00:00:00",3547,"2005-03-15T00:00:00","PPLA",13.776,109.224,"Quy Nhon",185533000,195862000,141375000,116157000,"Completion","VN-COASTAL CITIES ENVMT SANIT.","The development objective of the Additional Financing for the Coastal Cities Environmental and Sanitation Project is to improve the environmental sanitation in the project cities in a sustainable manner thereby enhancing the quality of life for city residents. This project paper seeks the approval of the Executive Directors to provide an additional International Development Association (IDA) credit in an amount of US$65.3 million equivalent to the socialist Republic of Vietnam project. The Additional Financing (AF) will bridge an unanticipated financing gap resulting from a period of exceptionally high inflation in 2007-08 exacerbated by low original cost estimates. The Ministry of planning and investment officially requested the AF from the World Bank in a letter dated September 24, 2010. No extension of the closing date is being requested.","http://d-portal.org/q.html?aid=44000-P082295"],
    [531,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",9.776,105.464,"Hau Giang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [532,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",20.25,106.25,"Tinh Nam Dinh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [533,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.667,105.833,"Tinh Thai Nguyen",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [534,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",16.083,108.083,"Tinh Da Nang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [535,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.333,106.433,"Tinh Bac Giang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [536,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.5,105.167,"Tinh An Giang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [537,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [538,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",22.75,106.083,"Tinh Cao Bang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [539,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.583,107.25,"Tinh Ba Ria-Vung Tau",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [540,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",11,107.167,"Tinh Dong Nai",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [541,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [542,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",11.083,108.083,"Tinh Binh Thuan",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [543,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","PPLA",20.865,106.683,"Hai Phong",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [544,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [545,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","PPLC",21.025,105.841,"Ha Noi",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [546,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [547,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",12.333,109,"Tinh Khanh Hoa",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [548,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10,105.167,"Tinh Kien Giang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [549,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",22.283,103.25,"Tinh Lai Chau",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [550,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.833,106.583,"Tinh Lang Son",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [551,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.25,107.333,"Tinh Quang Ninh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [552,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.167,104,"Tinh Son La",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [553,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",11.333,106.167,"Tinh Tay Ninh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [554,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [555,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [556,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [557,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [558,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [559,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","PCLI",16.167,107.833,"Socialist Republic of Vietnam",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [560,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",21.75,104.583,"Tinh Yen Bai",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [561,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [562,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",9.55,105.917,"Tinh Soc Trang",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [563,34969900,42629600,26522200,18351100,"2012-12-31T00:00:00",3143,"2004-05-24T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",35041600,38444000,26085500,20723100,"Completion","VN-HIV/AIDS  Prevention Project","The objective of this HIV/AIDS Prevention Project for Vietnam is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations and between these vulnerable populations and the general population. The changes reflected in two sub-components on behavior change communication (BCC) and care and treatment. These activities will be restructured by decentralization from the central to the provincial levels. The possible extension of methadone sites is also a proposed change. A justification of these changes is presented in the annexes. Since Department for International Development (United Kingdom) (DFID) has granted an additional financing, the project coverage will be extended from current 20 participating provinces and cities to 32.","http://d-portal.org/q.html?aid=44000-P082604"],
    [564,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",22.25,105.833,"Tinh Bac Kan",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [565,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","",21.333,102.933,"Huyen Dien Bien",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [566,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",22.75,106.083,"Tinh Cao Bang",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [567,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",22.75,105,"Tinh Ha Giang",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [568,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",22.283,103.25,"Tinh Lai Chau",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [569,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",21.167,104,"Tinh Son La",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [570,58277200,57871000,37123100,28645600,"2016-02-29T00:00:00",4367,"2004-03-16T00:00:00","ADM1",22.3,104.167,"Tinh Lao Cai",56697900,59672800,42739400,35663500,"Completion","VN-Northern Upland Health Support Proje","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P082672"],
    [571,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",20.995,105.813,"Quan Thanh Xuan",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [572,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",20.929,105.836,"Huyen Thanh Tri",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [573,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.042,105.752,"Huyen Tu Liem",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [574,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.066,105.82,"Quan Tay Ho",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [575,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.028,105.854,"Quan Hoan Kiem",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [576,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.013,105.827,"Quan Dong Da",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [577,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.027,105.79,"Quan Cau Giay",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [578,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","ADM2",21.036,105.822,"Quan Ba Dinh",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [579,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","PPLC",21.025,105.841,"Ha Noi",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [580,115902000,108047000,77150100,46939000,"2016-12-31T00:00:00",4208,"2005-06-24T00:00:00","PPL",20.946,105.845,"Van Dien",107388000,125029000,87984000,72008400,"Completion","VN-HANOI URBAN TRANSPORT","The GEF strategic objectives of the Hanoi Urban Transport Development Project are to promote a shift to more environmentally-sustainable transport modes and urban development plans, and to promote the replication of these approaches in the country and region. The global environment objective of this project is to lower Hanoi's transport-related greenhouse gas emissions, relative to a business-as-usual scenario. The project has three components: 1) The Bus Rapid Transit Component (BRT) will support the development of segregated bus lanes and bus priority; 2) The Road Infrastructure and Sustainable Urban Planning component includes the construction of a section of the Second Ring Road, construction of a resettlement site, and support for sustainable urban land development; 3) The Institutional Development Component includes equipment procurement and technical assistance for various Hanoi agencies.","http://d-portal.org/q.html?aid=44000-P083581"],
    [581,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",9.776,105.464,"Hau Giang",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [582,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",9.083,105.083,"Tinh Ca Mau",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [583,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",9.3,105.5,"Tinh Bac Lieu",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [584,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM2",10.799,105.19,"Huyen Tan Chau",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [585,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.5,105.167,"Tinh An Giang",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [586,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",9.294,105.728,"Bac Lieu",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [587,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [588,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","STM",10.317,105.567,"Rach Cai Dau Lon",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [589,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",9.177,105.152,"Ca Mau",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [590,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","STM",10.317,105.917,"Rach Chanh",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [591,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","CNLN",10.34,106.403,"Kinh Cho Gao",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [592,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPL",9.724,106.081,"Long Duc",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [593,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [594,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPL",9.234,105.458,"Gia Rai",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [595,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [596,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10,105.167,"Tinh Kien Giang",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [597,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPL",9.955,105.121,"Ap Rach Soi",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [598,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.7,106.167,"Tinh Long An",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [599,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","CNLN",10.438,105.058,"Kinh Mac Can Dung",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [600,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","DLTA",10.333,106.667,"Mekong Delta",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [601,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",10.36,106.36,"My Tho",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [602,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",10.012,105.081,"Rach Gia",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [603,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",10.536,106.414,"Tan An",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [604,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [605,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [606,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [607,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",9.8,106.3,"Tinh Tra Vinh",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [608,351153000,364793000,263969000,198881000,"2016-06-30T00:00:00",3760,"2006-03-15T00:00:00","ADM1",9.55,105.917,"Tinh Soc Trang",336386000,391338000,276692000,221915000,"Completion","VN-MKG DELTA TRANSPORT INFRA DEV","The development objective of the Mekong Transport Infrastructure Development Project for Vietnam is to improve access to markets by businesses, farmers and the poor with lower logistics costs resulting from the alleviation of key physical and institutional bottlenecks of the main transport corridors in the Mekong Delta region. The restructuring will involve the amendment of the International Development Association (IDA) Financing Agreement to revise the disbursement schedule in order to consolidate the current 40 disbursement categories. The project restructuring will also involve the amendment of the Administration Agreement, signed between the Bank and the Donor (AusAID), to extend the end disbursement date to June 30, 2014, and the AusAID Trust Fund Grant Agreement, signed between the Bank and the Borrower (the Government of Vietnam), to: (i) provide a one-year extension of the closing date for the Grant from December 30, 2012 to December 31, 2013, to coincide with the current closing date of the IDA Financing Agreement, in order to complete the on-going works in Can Tho and Tra Vinh provinces; and (ii) revise the disbursement schedule in order to consolidate the current 30 disbursement categories into a single new category for investments implemented by 13 Mekong Delta provincial authorities.","http://d-portal.org/q.html?aid=44000-P083588"],
    [609,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.569,105.013,"Co Luong",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [610,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.613,104.846,"Quan Hoa ",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [611,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.528,104.629,"Huyen Muong Lat",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [612,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.476,104.953,"Huyen Quan Hoa",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [613,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",21.833,104.75,"Bao Dap",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [614,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.606,105.234,"Huyen Tan Lac",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [615,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.663,105.031,"Huyen Mai Chau",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [616,330000000,322324000,229365000,203527000,"2017-12-31T00:00:00",3267,"2009-01-20T00:00:00","",20.666,105.085,"Mai Chau",258062000,308809000,217309000,175362000,"Completion","VN-Trung Son Hydropower Project","The objective of the Trung Son Hydropower Project for Vietnam is to improve, or at least restore, livelihoods and living standards of affected households and villages while allowing them to maintain their cultural identity. There are four components to the project. The first component of the project is dam and ancillary construction. Construction of main dam and appurtenant structures, supply and installation of hydraulic mechanical and electro-mechanical equipment, access roads, bridges, borrow pits and quarries, power supply lines for construction and provision of supporting consultant services. The second component of the project is transmission line. Construction of the transmission line to evacuate power from the plant during the operation phase. The third component of the project is social and environment impact management. Implementation of the resettlement, livelihoods and ethnic minorities' development program, the public health action plan and the environment management plan. The fourth component of the project is capacity development and scale-up. Building of Vietnam Electricity (EVN) capacity to prepare hydropower projects to international standards.","http://d-portal.org/q.html?aid=44000-P084773"],
    [617,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PS",15.338,108.74,"Doc Soi 500KV Substation",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [618,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",10.762,107.027,"Huyen Long Thanh",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [619,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",10.978,107.159,"Huyen Thong Nhat",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [620,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",11.257,107.028,"Huyen Vinh Cuu",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [621,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",11.052,106.741,"Huyen Tan Uyen",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [622,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",11.052,106.741,"Huyen Tan Uyen",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [623,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",11.006,106.658,"Thi Xa Thu Dau Mot",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [624,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",21.271,105.83,"Huyen Soc Son",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [625,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",10.125,105.593,"Huyen O Mon",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [626,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",10.645,106.734,"Huyen Nha Be",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [627,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM2",10.389,106.068,"Huyen Cai Lay",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [628,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",21.273,106.195,"Bac Giang",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [629,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",19.75,105.9,"Sam Som",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [630,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",12.667,108.038,"Buon Ma Thuot",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [631,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.4,106.117,"Cai Lay",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [632,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",15.416,108.671,"Chu Lai",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [633,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",17.469,106.622,"Dong Hoi",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [634,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [635,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [636,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",10.823,106.63,"Thanh pho Ho Chi Minh",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [637,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",20.95,107.073,"Ha Long",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [638,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.4,106.333,"Long An",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [639,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",10.7,106.167,"Tinh Long An",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [640,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.683,106.767,"Nha Be",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [641,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.11,105.623,"O Mon",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [642,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.733,105.283,"Phu Lam",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [643,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",21.25,107.333,"Tinh Quang Ninh",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [644,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",20.9,106.6,"An Duong",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [645,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",14.547,109.043,"Tam Quan",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [646,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",10.536,106.414,"Tan An",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [647,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [648,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",14.75,107.917,"Tinh Kon Tum",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [649,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [650,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPLA",10.254,105.972,"Vinh Long",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [651,376479000,407136000,288924000,219696000,"2014-06-30T00:00:00",3328,"2005-05-20T00:00:00","PPL",10.617,107.067,"Xom My Xuan",387652000,406529000,290809000,241047000,"Completion","VN-TRANS&DISTRIB 2","The objective of the Second Transmission and Distribution Project is the efficient development of Vietnam's transmission and distribution system. The closing date for the will be extended from December 31, 2010 until June 30, 2011.  Overall implementation of the project has been satisfactory at all times although some delays have occurred due to: (i) high rates of inflation in late 2007 and 2008 which caused rebidding of several subprojects; (ii) slow clearance of project sites because of slow compensation processes; and (iii) slow decisions on location of facilities and the complexities of bidding documents for sophisticated information systems component.  These issues have been addressed and implementation is proceeding smoothly. This project is in compliance with all dated legal covenants. There are no overdue or qualified audit reports.  Overall compliance with project covenants is satisfactory. Vietnam Electricity Authority (EVN) has complied with financial covenants every year including in 2008 and 2009 when the Bank waived and temporarily reduced the covenants respectively due to special circumstances. With the approval of the Additional Financing (AF), the closing date for this project will be extended for a further three years which will be adequate to complete all the outstanding activities. This will be the first extension of the project.  The extension will allow adequate time for processing the proposed Additional Financing Loan through effectiveness.  The AF loan will scale up the impact of the transmission activities to meet growing demand in an efficient manner. There is a firm schedule for processing the AF loan to effectiveness within six months.  A further three year extension will be granted to June 30, 2014 upon approval of the AF loan and will be adequate for completion of the remaining activities under the parent project.","http://d-portal.org/q.html?aid=44000-P084871"],
    [652,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM2",21.137,106.396,"Huyen Chi Linh",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [653,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [654,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLA",10.945,106.824,"Bien Hoa",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [655,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLA",10.037,105.788,"Can Tho",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [656,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.583,107.25,"Tinh Ba Ria-Vung Tau",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [657,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",11,107.167,"Tinh Dong Nai",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [658,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [659,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLC",21.025,105.841,"Ha Noi",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [660,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",21,105.75,"Thu Do Ha Noi",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [661,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [662,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.823,106.63,"Thanh pho Ho Chi Minh",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [663,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.7,106.167,"Tinh Long An",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [664,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [665,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [666,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [667,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLA",18.673,105.692,"Vinh",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [668,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","PPLA",10.346,107.084,"Vung Tau",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [669,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [670,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",20.233,105.9,"Tinh Ninh Binh",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [671,23388200,30971200,19727000,12240400,"2012-12-31T00:00:00",3121,"2004-06-15T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",23963900,24448800,18043200,14913100,"Completion","VN-ROAD SAFETY","The Road Safety Project aims at reducing the rate of accidents, injury, and death associated with road transport, through physical improvement works, and institutional development to strengthen the management of road transport safety. The project has three components: Institutional and Capacity Building Program, Road Safety Demonstration and Awareness Program, and, Road Safety Monitoring and Evaluation Program. The first component will provide technical assistance within the implementation of the project to strengthen the management, and technical capacity of the National Traffic Safety Committee (NTSC) Executive Office, and the Traffic Safety Project Management Unit (TSPMU), and will further prepare a national road safety strategy. The second component will assist the government in developing, and implementing comprehensive, integrated safety programs, which includes the enhancement of road safety auditing processes, and funding of blackspot treatments, for three high-risk road corridors. In addition, a program of road user education, traffic safety enforcement, and emergency service preparedness along the three demonstration corridors will be implemented. Finally, the third component will support the development of a national road accident database system, to be used initially by the Vietnam Road Administration (VRA) to enhance the identification and treatment of blackspots, and by the Ministry of Public Safety to improve enforcement strategies and priorities.","http://d-portal.org/q.html?aid=44000-P085080"],
    [672,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16.042,108.213,"Quan Hai Chau",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [673,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16.067,108.037,"Huyen Hoa Vang",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [674,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16.115,108.124,"Quan Lien Chieu",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [675,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16,108.25,"Quan Ngu Hanh Son",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [676,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16.111,108.264,"Quan Son Tra",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [677,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","ADM2",16.067,108.185,"Quan Thanh Khe",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [678,152425000,154973000,98006700,77611500,"2013-06-30T00:00:00",2495,"2006-08-31T00:00:00","PPLA",16.068,108.221,"Turan",146238000,148718000,111695000,93365600,"Completion","VN-Priority Infra Investment","The objective of the Da Nang Priority Infrastructure Investment Project is to improve the efficiency, effectiveness and sustainability of urban services under the control of Da Nang city through a package of priority investments including urban upgrading, environmental improvement and strategic road access, as well as measures for institutional strengthening for management of urban services. There are four components to the project. The first component of the project is urban area upgrading. This component will fund: (a) tertiary infrastructure (community level) upgrading and service improvements in 14 low income areas; (b) construction of three resettlement sites; and (c) micro-finance for housing improvement. The second component of the project is environment infrastructure improvement. This component will finance: (a) drainage linking to the tertiary systems of all 14 low income areas; (b) improvement to primary and secondary drainage systems; (c) Phu LOC river environmental improvement; and (d) improvement and extension of primary wastewater systems. The third component of the project is urban roads and bridges. This component will support the construction of two major road links for improving access to the fast growing new district of Cam Le: (a) city center to Southern area; and (b) Southern Da Nang link road section. The fourth and the final component of the project is capacity building and project implementation support. This component will provide technical assistance and training to enhance the capacity of Da Nang City's departments to carry out their responsibilities in: (a) housing and land management; (b) urban development management; (c) urban technical infrastructure management; (d) municipal finance management; and (e) to support the Project Management Unit (PMU) in project implementation.","http://d-portal.org/q.html?aid=44000-P086508"],
    [679,60000000,73993500,44637300,40313400,"2017-12-31T00:00:00",4359,"2006-01-24T00:00:00","A",16.167,107.833,"Socialist Republic of Vietnam",48352500,59289100,41037400,32736400,"Completion","Fin Sector Modern and Info Mgnt System","The objectives of the Financial Sector Modernization and Information Management System Project is to assist the State Bank of Vietnam (SBV), the Credit Information Center (CIC), and the Deposit Insurance of Vietnam(DIV) to improve the delivery of their main functions in accordance with relevant international standards for the banking sector, through: (a) developing a centralized and integrated system of advanced business processes and a modern information technology architecture; and (b) strengthening their institutional capacity in carrying out their operations. There are three components to the project. The first component is the functional strengthening and business re-engineering. This component will provide the SBV to develop a policy and institutional framework as well as capabilities for information management and informed decision making. The second component is the Information and Communications Technology (ICT) platform development. This component will provide the SBV to design and build a centralized ICT platform based on international Information Technology (IT) standards to support SBV's evolving role as a central bank, taking account of relevant international practices and all critical Vietnamese realities. If successfully implemented, the component will deliver a centralized data warehouse and a centralized core banking system which will capture data from credit institutions, financial markets and central banking operations, and then process and feed them to user groups. User groups will be equipped with business development/data interrogation tools to turn data into information in the form of customized and standard reports to support policy and supervision functions, as well as to meet the central bank's disclosure obligations. Centralized information flows through automated processes are also expected to fundamentally change the business model of SBV","http://d-portal.org/q.html?aid=44000-P088759"],
    [680,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",20.817,106.05,"Tinh Hung Yen",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [681,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM2",21.032,105.974,"Huyen Gia Lam",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [682,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM2",20.651,106.364,"Huyen Quynh Phu",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [683,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM2",20.544,106.341,"Huyen Dong Hung",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [684,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",22.75,106.083,"Tinh Cao Bang",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [685,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPL",20.583,106.433,"Co Dang",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [686,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",11,107.167,"Tinh Dong Nai",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [687,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPLA",20.865,106.683,"Hai Phong",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [688,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPLC",21.025,105.841,"Ha Noi",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [689,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",21,105.75,"Thu Do Ha Noi",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [690,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [691,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",10.823,106.63,"Thanh pho Ho Chi Minh",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [692,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",11.667,108.083,"Tinh Lam Dong",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [693,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",10.7,106.167,"Tinh Long An",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [694,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPL",10.95,106.517,"Tan Thong",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [695,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [696,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [697,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPL",20.388,106.438,"Thanh Ne",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [698,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PCLI",16.167,107.833,"Socialist Republic of Vietnam",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [699,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","PPL",10.867,106.567,"Xuan Thoi Thuong",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [700,109863000,125778000,84598500,68622700,"2018-12-31T00:00:00",4358,"2007-01-25T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",90441600,104945000,72795400,59950800,"Implementation","VN-Livestock Competitiveness&Food Safety","The objectives of the Livestock Competitiveness and Food Safety Project for Vietnam are to increase the production efficiency of household-based livestock producers, to reduce the environmental impact of livestock production, processing and marketing, and to improve food safety in livestock product supply chains (mainly meat) in selected provinces. There are three components to the project. The first component of the project is upgrading household-based livestock production and market integration. The key objective of this component is to support the improvement of: (a) the competitiveness of household-based livestock production; (b) food safety and hygiene along the meat supply chain; and (c) the environmental management of livestock waste. The second component of the project is strengthening central-level livestock and veterinary services. This component will support the strengthening of the capacity of the Department of Livestock Production (DLP) and the Department of Animal Health (DAH) under Ministry of Agriculture and Rural Development (MARD) in developing and monitoring the implementation of bio-security, livestock disease control, animal production technology, food safety, and livestock waste management policies and technical standards. The third component of the project is project management, and monitoring and evaluation. This component will provide support to project implementation through the strengthening of coordination of the various government agencies at central, provincial and district levels, and the monitoring and evaluation of project activities and impact.","http://d-portal.org/q.html?aid=44000-P090723"],
    [701,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",9.776,105.464,"Hau Giang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [702,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",9.083,105.083,"Tinh Ca Mau",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [703,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",9.3,105.5,"Tinh Bac Lieu",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [704,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.25,105.833,"Tinh Bac Kan",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [705,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",15.583,107.917,"Tinh Quang Nam",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [706,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",11.75,106.917,"Tinh Binh Phuoc",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [707,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",21.333,102.933,"Huyen Dien Bien",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [708,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",12.167,107.75,"Dak Nong",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [709,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10.5,105.167,"Tinh An Giang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [710,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [711,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.75,106.083,"Tinh Cao Bang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [712,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",12.75,108.25,"Tinh Dac Lak",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [713,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [714,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",11.083,108.083,"Tinh Binh Thuan",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [715,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",13.75,108.25,"Tinh Gia Lai",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [716,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.75,105,"Tinh Ha Giang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [717,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10,105.167,"Tinh Kien Giang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [718,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.283,103.25,"Tinh Lai Chau",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [719,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",11.667,108.083,"Tinh Lam Dong",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [720,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",21.833,106.583,"Tinh Lang Son",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [721,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10.7,106.167,"Tinh Long An",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [722,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",20.667,105.333,"Tinh Hoa Binh",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [723,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [724,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [725,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",21.167,104,"Tinh Son La",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [726,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [727,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",14.75,107.917,"Tinh Kon Tum",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [728,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.3,104.167,"Tinh Lao Cai",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [729,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",21.75,104.583,"Tinh Yen Bai",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [730,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [731,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",22.117,105.25,"Tinh Tuyen Quang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [732,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",9.8,106.3,"Tinh Tra Vinh",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [733,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",9.55,105.917,"Tinh Soc Trang",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [734,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",11.75,108.833,"Tinh Ninh Thuan",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [735,123300000,138207000,87316500,74754200,"2016-12-31T00:00:00",3379,"2007-10-01T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",123026000,137859000,97241400,79367300,"Completion","VN-School Education Quality Assurance","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P091747"],
    [736,139688000,140561000,85571200,80373200,"2016-06-30T00:00:00",3329,"2007-05-20T00:00:00","ADM1",11.167,106.667,"Tinh Binh Duong",134799000,156610000,110349000,87419100,"Completion","VN-Local  Development Investment (LDIFP)","The development objectives of the Local Development Investment Fund Project for Vietnam are to improve the effectiveness of qualified local development investment funds (LDIFs) in leveraging private sector financing for municipal infrastructure, and to strengthen their financial and technical capability and capacity for social and environmental safeguards management through investments in eligible local development sub-projects. Under this restructuring, the closing date of the project is to be changed from December 31, 2014 to June 30, 2016.","http://d-portal.org/q.html?aid=44000-P094055"],
    [737,139688000,140561000,85571200,80373200,"2016-06-30T00:00:00",3329,"2007-05-20T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",134799000,156610000,110349000,87419100,"Completion","VN-Local  Development Investment (LDIFP)","The development objectives of the Local Development Investment Fund Project for Vietnam are to improve the effectiveness of qualified local development investment funds (LDIFs) in leveraging private sector financing for municipal infrastructure, and to strengthen their financial and technical capability and capacity for social and environmental safeguards management through investments in eligible local development sub-projects. Under this restructuring, the closing date of the project is to be changed from December 31, 2014 to June 30, 2016.","http://d-portal.org/q.html?aid=44000-P094055"],
    [738,234599000,258718000,166358000,136719000,"2019-12-31T00:00:00",4396,"2007-12-18T00:00:00","ADM1",20.25,106.25,"Tinh Nam Dinh",139218000,157619000,112210000,89506500,"Implementation","VN-Northern Delta Transport Dev","The development objective of the Northern Delta Transport Development Project for Vietnam is to enhance the efficiency, environmental sustainability, and safety of transport infrastructure and services, through the alleviation of physical and institutional bottlenecks in two major waterway corridors in the Northern Delta region. This level two restructuring will extend the closing date of the credit by 18 months, from June 30, 2014 to December 31, 2015. The extension is necessary to complete all on-going civil works and to complete a technical assistance activity to strengthen capacity at the Vietnam Inland Waterways Administration (VIWA).","http://d-portal.org/q.html?aid=44000-P095129"],
    [739,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.271,107.885,"Huyen Phu Loc",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [740,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.378,107.469,"Huyen Huong Tra",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [741,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.488,107.289,"Huyen Phong Dien",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [742,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.47,107.715,"Huyen Phu Vang",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [743,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.456,107.576,"Thanh Pho Hue",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [744,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.476,105.329,"Huyen Huong Son",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [745,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.497,105.61,"Huyen Duc Tho",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [746,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.624,105.768,"Huyen Nghi Xuan",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [747,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.17,105.698,"Huyen Huong Khe",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [748,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.058,106.246,"Huyen Ky Anh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [749,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.191,106.002,"Huyen Cam Xuyen",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [750,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.778,105.881,"Huyen Minh Hoa",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [751,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.913,106.027,"Huyen Tuyen Hoa",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [752,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.834,106.367,"Huyen Quang Trach",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [753,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.536,106.283,"Huyen Bo Trach",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [754,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.112,106.705,"Huyen Le Thuy",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [755,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",17.016,106.934,"Huyen Vinh Linh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [756,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.917,107,"Huyen Gio Linh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [757,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",16.676,107.234,"Huyen Hai Lang",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [758,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.528,104.629,"Huyen Muong Lat",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [759,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.476,104.953,"Huyen Quan Hoa",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [760,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.258,104.834,"Huyen Quan Son",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [761,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.358,105.253,"Huyen Ba Thuoc",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [762,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.933,105.889,"Huyen Hau Loc",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [763,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.196,105.468,"Huyen Cam Thuy",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [764,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.159,105.151,"Huyen Lang Chanh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [765,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",20.068,105.374,"Huyen Ngoc Lac",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [766,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.937,105.241,"Huyen Thuong Xuan",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [767,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.846,105.861,"Huyen Hoang Hoa",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [768,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.625,105.389,"Huyen Nhu Xuan",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [769,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.445,105.728,"Huyen Tinh Gia",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [770,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.424,104.222,"Huyen Ky Son",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [771,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.31,104.578,"Huyen Tuong Duong",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [772,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.702,104.879,"Huyen Que Phong",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [773,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.382,105.441,"Huyen Nghia Dan",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [774,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.227,105.644,"Huyen Quynh Luu",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [775,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.739,105.241,"Huyen Thanh Chuong",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [776,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",19.027,105.436,"Huyen Yen Thanh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [777,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.989,105.576,"Huyen Dien Chau",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [778,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.831,105.624,"Huyen Nghi Loc",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [779,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM2",18.67,105.526,"Huyen Nam Dan",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [780,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [781,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",17.5,106.333,"Tinh Quang Binh",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [782,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [783,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [784,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [785,63575200,65557400,51911200,42899000,"2016-08-31T00:00:00",2800,"2008-12-31T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",59804200,67968800,48625400,39073900,"Completion","VN-Central North Region Health Support","The development objective of the Central North Region Health Support Project for Vietnam is to strengthen district level curative and preventive health services and improve their accessibility for the economically vulnerable population in the Central North provinces. There are four components to the project. The first component of the project is supporting health insurance for the near poor population. This component aims to expand access to health insurance for near poor households in the Central North region and to improve the system's capacity to manage health insurance. It will do so by: (i) subsidizing health insurance for the near poor; (ii) conducting a social marketing and information and education campaign; and (iii) strengthening institutional capacities for the administration of health insurance. The second component of the project is strengthening district health services. This component aims to: (i) improve the capacity of district hospitals to provide basic curative health services to the population; and (ii) strengthen the capacity of district preventive health centers to carry out basic public health functions. This will be done through providing basic medical equipment and ambulances to 30 district hospitals, and building and equipping 30 districts preventive health centers. The component will also include a Results Based Financing (RBF) pilot to improve the performance of hospitals and preventive health centers in Nghe An province. The third component of the project is improving supply and quality of human resources for health. The objective of this component is to strengthen the capacity of existing medical educational institutions and to improve skills and knowledge of already practicing medical personnel. This will be done through providing teaching equipment to medical colleges in selected provinces; supporting upgrading of Nghe An medical colleg","http://d-portal.org/q.html?aid=44000-P095275"],
    [786,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",20.817,106.05,"Tinh Hung Yen",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [787,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [788,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [789,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","",20.917,105.667,"Tinh Ha Tay",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [790,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","",20.917,105.667,"Tinh Ha Tay",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [791,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [792,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",12.333,109,"Tinh Khanh Hoa",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [793,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [794,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [795,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [796,62860600,59107400,37387900,28914400,"2015-06-30T00:00:00",2905,"2007-07-17T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",57600400,63726700,45631400,36667100,"Completion","VN-Land Administration Project","The objectives of the Land Administration Project are to increase access to land information services by all stakeholders through development of an improved land administration system in selected provinces in Vietnam. Such a system is considered to be an essential public good to be provided by the Government of Vietnam and is embedded in the government's responsibility to guide and regulate a continuation of sustainable economic and social development. There are three components to the project. The first component is the modernization of the land registration system. This component will support the development of an accurate, current and complete information system to support land registration through: (a) completing and updating all cadastral mapping showing all land parcels; (b) completing and updating all land records for land use rights and land use; (c) further developing and implementing computerized land record system; and (d) selected policy studies in support of the land administration system. The second component is the improvement of land registration service Delivery. This component will provide support for three main areas: (i) modernization and improvement of Land Registration Offices (LROs) to implement the government's policy for one door single service centers for land registration; (ii) access to land registration data through all LROs and the Internet; and (iii)comprehensive program to support public awareness raising and better communications of land registration and participation in the processes to complete and update land records, surveying and mapping. Finally, the third component will support the overall implementation of the project through project management monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P096418"],
    [797,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",9.776,105.464,"Hau Giang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [798,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",13.021,108.207,"Huyen Krong Buk",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [799,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",12.5,108.083,"Huyen Krong Ana",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [800,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",21.333,105.567,"Tinh Vinh Phuc",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [801,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",21.005,106.34,"Huyen Nam Sach",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [802,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",20.938,106.51,"Huyen Kim Thanh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [803,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.917,106.333,"Tinh Hai Duong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [804,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",9.083,105.083,"Tinh Ca Mau",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [805,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",9.3,105.5,"Tinh Bac Lieu",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [806,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",13.159,108.973,"Huyen Son Hoa",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [807,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.533,105.967,"Tinh Ha Nam",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [808,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.25,106.25,"Tinh Nam Dinh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [809,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",14.78,108.979,"Huyen Duc Pho",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [810,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",14.74,108.693,"Huyen Ba To",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [811,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",14.954,108.677,"Huyen Minh Long",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [812,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",14.984,108.536,"Huyen Son Ha",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [813,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",15.238,108.526,"Huyen Tra Bong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [814,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",15.191,108.743,"Huyen Son Tinh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [815,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",15.095,108.771,"Huyen Tu Nghia",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [816,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",21.333,105.133,"Tinh Phu Tho",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [817,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",10.912,107.436,"Huyen Xuan Loc",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [818,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",15.79,108.202,"Huyen Duy Xuyen",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [819,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.75,106.917,"Tinh Binh Phuoc",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [820,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.167,106.667,"Tinh Binh Duong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [821,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",21.333,106.433,"Tinh Bac Giang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [822,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",21.122,106.04,"Huyen Tien Son",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [823,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.819,108.212,"Huyen Lam Ha",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [824,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.753,108.554,"Huyen Don Duong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [825,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.627,108.353,"Huyen Duc Trong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [826,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.495,108.087,"Huyen Di Linh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [827,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.663,107.368,"Huyen Cat Tien",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [828,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.584,107.528,"Huyen Da Teh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [829,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.712,107.753,"Huyen Bao Lam",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [830,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",11.538,107.786,"Thi Xa Bao Loc",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [831,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",20.688,105.548,"Huyen Kim Boi",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [832,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM2",13.6,107.811,"Huyen Chu Prong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [833,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.5,105.167,"Tinh An Giang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [834,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.167,106.5,"Tinh Ben Tre",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [835,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [836,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.583,107.25,"Tinh Ba Ria-Vung Tau",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [837,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPLA",11.946,108.442,"Da Lat",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [838,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11,107.167,"Tinh Dong Nai",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [839,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [840,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",15.829,108.26,"Duy Xuyen",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [841,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.083,108.083,"Tinh Binh Thuan",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [842,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPLA",20.941,106.333,"Hai Duong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [843,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPLA",20.865,106.683,"Hai Phong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [844,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.117,105.5,"Tinh Can Tho",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [845,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPLA",20.817,105.338,"Hoa Binh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [846,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10,105.167,"Tinh Kien Giang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [847,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",20.65,105.783,"Kim Boi",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [848,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.667,108.083,"Tinh Lam Dong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [849,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.7,106.167,"Tinh Long An",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [850,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.667,105.333,"Tinh Hoa Binh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [851,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",19.7,105.683,"Nong Cong",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [852,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",16.883,107.2,"Pho Hoi",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [853,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",13.167,109.083,"Tinh Phu Yen",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [854,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",17.5,106.333,"Tinh Quang Binh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [855,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",15,108.667,"Tinh Quang Ngai",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [856,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",21.25,107.333,"Tinh Quang Ninh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [857,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",16.75,107,"Tinh Quang Tri",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [858,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",21.141,105.507,"Son Tay",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [859,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.333,106.167,"Tinh Tay Ninh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [860,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPLA",20.45,106.34,"Thai Binh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [861,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [862,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [863,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [864,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [865,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","PPL",20.95,106.417,"Tien Trung",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [866,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",10.1,106,"Tinh Vinh Long",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [867,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",22.117,105.25,"Tinh Tuyen Quang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [868,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",9.8,106.3,"Tinh Tra Vinh",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [869,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",9.55,105.917,"Tinh Soc Trang",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [870,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",11.75,108.833,"Tinh Ninh Thuan",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [871,132727000,134130000,83838900,65828900,"2013-06-30T00:00:00",2294,"2007-03-20T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",123425000,126383000,91350700,78771700,"Completion","VN-Rural Distribution Project","The objective of the Rural Distribution Project is to improve the reliability and quality of medium voltage service to targeted retail electricity distribution systems. There are seven components to the project. The first component of the project is improvement of the rural distribution system in the Northern Region. This component will rehabilitate and strengthen rural distribution networks in about 15 provinces in the northern region of Vietnam, which are the responsibility of Power Company No.1 (PC1). The second component of the project is improvement of the rural distribution system in the Southern Region. This component will rehabilitate and strengthen rural distribution networks in about 20 provinces in the southern region of Vietnam, which are the responsibility of Power Company No.2 (PC2). The third component of the project is improvement of the rural distribution system in the Central Region. This component will rehabilitate and strengthen rural distribution networks in about 11 provinces in the central region of Vietnam, which are the responsibility of Power Company No.3 (PC3). The fourth component of the project is improvement of the rural distribution system in the area of Hai Phong City. This component will rehabilitate and strengthen rural distribution networks in the rural areas and islands surrounding Hai Phong City, in the north of Vietnam, which are the responsibility of Hai Phong Power Company (PC Hai Phong). The fifth component of the project is improvement of the rural distribution system in Hai Duong province. This component will rehabilitate and strengthen rural distribution networks of Hai Duong province in the northern region of Vietnam, which are the responsibility of Hai Duong Power Company (PC Hai Duong). The sixth component of the project is improvement of the rural distribution system in Dong Nai province. This component will rehabilitate","http://d-portal.org/q.html?aid=44000-P099211"],
    [872,8894410,-7822550,-8022630,-7792000,"2015-03-31T00:00:00",2720,"2007-10-19T00:00:00","A",21,105.75,"Ha Noi",674674,509803,383545,436999,"Completion","Tax Administration Modernization Project","The objectives of the Vietnam Tax Administration Modernization Project (TAMP) are to assist the general department of taxation (GDT) in strengthening governance in tax administration and to increase the level of voluntary compliance with the tax system by improving the effectiveness, efficiency, transparency and accountability of the tax administration. The amendments involve: (i) the project component will be simplified in accordance with the recommendations of the mid-term review mission. The redesign will neither affect the definition of the project development objectives (PDOs) nor the financing plan or total amount of resources required for project implementation; (ii) the redesign of the project components will require reallocation of project proceeds in both Financing Agreement and the Grant Agreement; and (iii) the closing date of both Financing Agreement and Grant Agreement will be extended from June 30, 2013 to May 30, 2015, to allow for completion of the project's activities.","http://d-portal.org/q.html?aid=44000-P099376"],
    [873,199282000,202566000,128070000,101413000,"2013-12-31T00:00:00",2114,"2008-03-18T00:00:00","PPLA",16.068,108.221,"Turan",198375000,202928000,146881000,125038000,"Completion","VN-Third Rural Finance Project","The objective of the Third Rural Finance Project for Vietnam will be to increase economic benefits to rural private enterprises and households by increasing their access to finance. The expected outcomes will include: (i) improved access to financial services for rural entrepreneurs; (ii) increased capital investment made by the rural entrepreneurs as well as increased employment; (iii) increased lending, particularly term lending to the rural private sector for capital investment by all participating financial institutions (PFIs) on market-based terms. There are three components to the project. The first component is the increase capital investment by rural enterprises - rural development fund. This component, the Rural Development Fund (RDF), is designed to address the term financing constraints of financial institutions to provide funding to rural enterprises for longer-term investment needs. The goal is to enable rural private entrepreneurs to access medium to long-term financing for capital investments, such as equipment and new technologies, which will enable opportunities for efficiency gains and business expansion. The second component is the increase access to microfinance in the rural economy - micro-finance loan fund. This component, the Micro-finance Loan Fund (MLF), will provide a small line of credit to demonstrate the commercial viability of lending to micro-enterprises and household businesses. These may be defined as formal and informal businesses employing 2-3 employees outside of their immediate families. Finally, the third component is the build institutional capacities and new products. The institutional building component is a core element to the success of the RFIII project. This component is designed to help strengthening the financial institutions participating in the project and demonstrating a credible strategy for expanding access to financ","http://d-portal.org/q.html?aid=44000-P100916"],
    [874,199282000,202566000,128070000,101413000,"2013-12-31T00:00:00",2114,"2008-03-18T00:00:00","PPLA",20.865,106.683,"Hai Phong",198375000,202928000,146881000,125038000,"Completion","VN-Third Rural Finance Project","The objective of the Third Rural Finance Project for Vietnam will be to increase economic benefits to rural private enterprises and households by increasing their access to finance. The expected outcomes will include: (i) improved access to financial services for rural entrepreneurs; (ii) increased capital investment made by the rural entrepreneurs as well as increased employment; (iii) increased lending, particularly term lending to the rural private sector for capital investment by all participating financial institutions (PFIs) on market-based terms. There are three components to the project. The first component is the increase capital investment by rural enterprises - rural development fund. This component, the Rural Development Fund (RDF), is designed to address the term financing constraints of financial institutions to provide funding to rural enterprises for longer-term investment needs. The goal is to enable rural private entrepreneurs to access medium to long-term financing for capital investments, such as equipment and new technologies, which will enable opportunities for efficiency gains and business expansion. The second component is the increase access to microfinance in the rural economy - micro-finance loan fund. This component, the Micro-finance Loan Fund (MLF), will provide a small line of credit to demonstrate the commercial viability of lending to micro-enterprises and household businesses. These may be defined as formal and informal businesses employing 2-3 employees outside of their immediate families. Finally, the third component is the build institutional capacities and new products. The institutional building component is a core element to the success of the RFIII project. This component is designed to help strengthening the financial institutions participating in the project and demonstrating a credible strategy for expanding access to financ","http://d-portal.org/q.html?aid=44000-P100916"],
    [875,199282000,202566000,128070000,101413000,"2013-12-31T00:00:00",2114,"2008-03-18T00:00:00","PPLC",21.025,105.841,"Ha Noi",198375000,202928000,146881000,125038000,"Completion","VN-Third Rural Finance Project","The objective of the Third Rural Finance Project for Vietnam will be to increase economic benefits to rural private enterprises and households by increasing their access to finance. The expected outcomes will include: (i) improved access to financial services for rural entrepreneurs; (ii) increased capital investment made by the rural entrepreneurs as well as increased employment; (iii) increased lending, particularly term lending to the rural private sector for capital investment by all participating financial institutions (PFIs) on market-based terms. There are three components to the project. The first component is the increase capital investment by rural enterprises - rural development fund. This component, the Rural Development Fund (RDF), is designed to address the term financing constraints of financial institutions to provide funding to rural enterprises for longer-term investment needs. The goal is to enable rural private entrepreneurs to access medium to long-term financing for capital investments, such as equipment and new technologies, which will enable opportunities for efficiency gains and business expansion. The second component is the increase access to microfinance in the rural economy - micro-finance loan fund. This component, the Micro-finance Loan Fund (MLF), will provide a small line of credit to demonstrate the commercial viability of lending to micro-enterprises and household businesses. These may be defined as formal and informal businesses employing 2-3 employees outside of their immediate families. Finally, the third component is the build institutional capacities and new products. The institutional building component is a core element to the success of the RFIII project. This component is designed to help strengthening the financial institutions participating in the project and demonstrating a credible strategy for expanding access to financ","http://d-portal.org/q.html?aid=44000-P100916"],
    [876,199282000,202566000,128070000,101413000,"2013-12-31T00:00:00",2114,"2008-03-18T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",198375000,202928000,146881000,125038000,"Completion","VN-Third Rural Finance Project","The objective of the Third Rural Finance Project for Vietnam will be to increase economic benefits to rural private enterprises and households by increasing their access to finance. The expected outcomes will include: (i) improved access to financial services for rural entrepreneurs; (ii) increased capital investment made by the rural entrepreneurs as well as increased employment; (iii) increased lending, particularly term lending to the rural private sector for capital investment by all participating financial institutions (PFIs) on market-based terms. There are three components to the project. The first component is the increase capital investment by rural enterprises - rural development fund. This component, the Rural Development Fund (RDF), is designed to address the term financing constraints of financial institutions to provide funding to rural enterprises for longer-term investment needs. The goal is to enable rural private entrepreneurs to access medium to long-term financing for capital investments, such as equipment and new technologies, which will enable opportunities for efficiency gains and business expansion. The second component is the increase access to microfinance in the rural economy - micro-finance loan fund. This component, the Micro-finance Loan Fund (MLF), will provide a small line of credit to demonstrate the commercial viability of lending to micro-enterprises and household businesses. These may be defined as formal and informal businesses employing 2-3 employees outside of their immediate families. Finally, the third component is the build institutional capacities and new products. The institutional building component is a core element to the success of the RFIII project. This component is designed to help strengthening the financial institutions participating in the project and demonstrating a credible strategy for expanding access to financ","http://d-portal.org/q.html?aid=44000-P100916"],
    [877,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [878,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",10.583,105.633,"Tinh Dong Thap",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [879,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",20.917,105.667,"Tinh Ha Tay",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [880,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",18.333,105.75,"Tinh Ha Tinh",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [881,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",21.833,106.583,"Tinh Lang Son",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [882,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",10.7,106.167,"Tinh Long An",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [883,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",11.333,106.167,"Tinh Tay Ninh",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [884,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",20.5,106.367,"Tinh Thai Binh",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [885,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [886,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",16.333,107.583,"Tinh Thua Thien-Hue",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [887,28156800,31070700,20568200,15258100,"2014-06-30T00:00:00",2621,"2007-04-27T00:00:00","ADM1",10.4,106.3,"Tinh Tien Giang",28495900,29735300,21149800,17866200,"Completion","VN-Avian&Human Influenza Control&Prep","The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Minist","http://d-portal.org/q.html?aid=44000-P101608"],
    [888,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",15.163,108.353,"Tra Bong",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [889,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPLA2",20.877,105.254,"Da Bac",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [890,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",22.267,104.15,"Bao Thang",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [891,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",21.55,103.933,"Muong La",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [892,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPLA",12.667,108.038,"Buon Ma Thuot",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [893,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",21.4,103.4,"Sop Bam",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [894,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",22.517,104.217,"Tam Pouc",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [895,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","PPL",22.462,103.833,"Tinh Lao Cai",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [896,202000000,227651000,144122000,123497000,"2018-06-30T00:00:00",3649,"2008-07-03T00:00:00","ADM1",22.3,104.167,"Huyen Bao Thang",166982000,201767000,140372000,115017000,"Completion","VN-Renewable Energy Development Project","The objective of the Renewable Energy Development Project for Vietnam is to increase the supply of electricity to the national grid from renewable energy sources on a commercially, environmentally, and socially sustainable basis. There are three components to the project. The first component of the project is renewable energy investments. There are two sub-components to the component. The first sub-component of the project is credit to support renewable energy investments. This sub-component will provide a re-financing facility to participating commercial banks (PBs) for loans to eligible renewable-based projects not exceeding 30MW developed by private sponsors. The second sub-component of the project is technical assistance for investment implementation. This subcomponent will provide technical assistance for application review, monitoring the eligibility of PBs and developers, project management by Ministry of Industry and Trade (MOIT) and for building the capacity of PBs and developers to prepare, appraise, finance, and implement renewable-based projects according to international best practices. The second component of the project is regulatory development. This component will provide technical assistance for developing the regulatory infrastructure and building the requisite capacities of MOIT, the electricity regulatory authority of Vietnam, and other relevant government agencies for renewable energy development particularly for grid-connected electricity generation projects not exceeding 30 MW. The third component of the project is pipeline development. This component will support activities to facilitate the development of further renewable energy projects contributing directly to building a pipeline of renewable energy projects.","http://d-portal.org/q.html?aid=44000-P103238"],
    [897,47808200,51009100,35600400,23764300,"2012-12-31T00:00:00",2378,"2006-06-28T00:00:00","PPL",10.723,106.605,"An Lac",48409300,49402300,35879800,29362200,"Completion","VN-HIFU DEVELOPMENT","The development objective of the Ho Chi Minh City (HCMC) Investment Fund for Urban (HIFU) Development Project is to develop HIFU as a model LDIF (in terms of internal policy and procedures for financial policy, sub-project appraisal, social and environmental safeguards, and partnership with the private sector) and increase private sector participation in financing municipal infrastructure in HCMC. The changes will: 1) change the legal name of the entity from HCMC Investment Fund for Urban Development (HIFU) to Ho Chi Minh Financial Investment State Owned Company (HFIC); 2) modify allocation of eligible expenditure categories between loan and equity investments; and 3) revise project outcome indicators and intermediate results indicators to reflect the changes in eligible expenditure categories.","http://d-portal.org/q.html?aid=44000-P104848"],
    [898,47808200,51009100,35600400,23764300,"2012-12-31T00:00:00",2378,"2006-06-28T00:00:00","PPL",10.667,106.65,"Da Phuoc",48409300,49402300,35879800,29362200,"Completion","VN-HIFU DEVELOPMENT","The development objective of the Ho Chi Minh City (HCMC) Investment Fund for Urban (HIFU) Development Project is to develop HIFU as a model LDIF (in terms of internal policy and procedures for financial policy, sub-project appraisal, social and environmental safeguards, and partnership with the private sector) and increase private sector participation in financing municipal infrastructure in HCMC. The changes will: 1) change the legal name of the entity from HCMC Investment Fund for Urban Development (HIFU) to Ho Chi Minh Financial Investment State Owned Company (HFIC); 2) modify allocation of eligible expenditure categories between loan and equity investments; and 3) revise project outcome indicators and intermediate results indicators to reflect the changes in eligible expenditure categories.","http://d-portal.org/q.html?aid=44000-P104848"],
    [899,47808200,51009100,35600400,23764300,"2012-12-31T00:00:00",2378,"2006-06-28T00:00:00","PPLA",10.823,106.63,"Thanh pho Ho Chi Minh",48409300,49402300,35879800,29362200,"Completion","VN-HIFU DEVELOPMENT","The development objective of the Ho Chi Minh City (HCMC) Investment Fund for Urban (HIFU) Development Project is to develop HIFU as a model LDIF (in terms of internal policy and procedures for financial policy, sub-project appraisal, social and environmental safeguards, and partnership with the private sector) and increase private sector participation in financing municipal infrastructure in HCMC. The changes will: 1) change the legal name of the entity from HCMC Investment Fund for Urban Development (HIFU) to Ho Chi Minh Financial Investment State Owned Company (HFIC); 2) modify allocation of eligible expenditure categories between loan and equity investments; and 3) revise project outcome indicators and intermediate results indicators to reflect the changes in eligible expenditure categories.","http://d-portal.org/q.html?aid=44000-P104848"],
    [900,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",16.042,108.213,"Quan Hai Chau",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [901,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",14.987,108.8,"Huyen Nghia Hanh",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [902,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.319,108.764,"Huyen Binh Son",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [903,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.191,108.743,"Huyen Son Tinh",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [904,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.095,108.771,"Huyen Tu Nghia",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [905,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.433,108.574,"Huyen Nui Thanh",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [906,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.899,108.225,"Huyen Dien Ban",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [907,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.79,108.202,"Huyen Duy Xuyen",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [908,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.712,108.262,"Huyen Que Son",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [909,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.687,108.392,"Huyen Thang Binh",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [910,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.592,108.506,"Thi Xa Tam Ky",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [911,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.583,107.917,"Tinh Quang Nam",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [912,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",16.067,108.037,"Huyen Hoa Vang",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [913,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",16.083,108.083,"Tinh Da Nang",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [914,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",16.068,108.221,"Turan",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [915,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15,108.667,"Tinh Quang Ngai",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [916,613500000,599229000,426410000,378376000,"2018-10-31T00:00:00",3459,"2009-05-12T00:00:00","",15.574,108.474,"Tam Ky",237718000,299319000,203709000,168869000,"Implementation","VN-EXPRESSWAY DEVEL DaNang-QNgai","The development objectives of the Da Nang-Quang Ngai Expressway Development Project are to construct an expressway that will enhance efficiency and safety for road users travelling between Da Nang city and Quang Ngai province and build institutional capacity for expressway development in Vietnam's Ministry of Transport. There are two components to the project. The first component of the project is Da Nang-Quang Ngai expressway. This component explains about the construction of a two-lane highway, including bridges, from the southern end of such expressway to national highway one A, in Quang Ngai province, and compensation, resettlement, and rehabilitation, including livelihood restoration, of project affected persons. The second component of the project is project implementation support and institutional strengthening. This component includes the provision of technical assistance to Vietnam Expressway Corporation (VEC) in relation to project implementation, including: a) construction supervision; b) integrated review and monitoring; c) financial auditing; and d) implementation of the governance, transparency, and anti-corruption plan; and capacity building for financial management.","http://d-portal.org/q.html?aid=44000-P106235"],
    [917,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",14.167,109,"Tinh Binh Dinh",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [918,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",12.75,108.25,"Tinh Dac Lak",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [919,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",11.083,108.083,"Tinh Binh Thuan",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [920,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",13.75,108.25,"Tinh Gia Lai",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [921,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",11.667,108.083,"Tinh Lam Dong",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [922,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",20.067,105.333,"Tinh Thanh Hoa",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [923,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","PPL",11.883,108.55,"Xuan Truong",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [924,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",11.75,108.833,"Tinh Ninh Thuan",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [925,58001200,61188200,40162500,32135200,"2014-06-30T00:00:00",2272,"2008-04-10T00:00:00","ADM1",19.25,104.917,"Tinh Nghe An",54483000,56207300,41026000,34326200,"Completion","VN - Agriculture Competitiveness Project","The development objective of Agriculture Competitiveness Project for Vietnam is to strengthen the competitiveness of smallholder farmers, with a focus on eight provinces in central Vietnam, in collaboration with the agri-business sector. There are four components to the project. The first component of the project is enhancement of agricultural technology. This component will support the identification and implementation of applied research and the dissemination of proven technologies that are cost-efficient, responsive to market demands and incentives, and enhance the environmental sustainability of increasingly competitive farming practices. There are three subcomponents: (i) conducting technology research and development (R&D) for a competitive agriculture; (ii) enhancing sustainable farming practices; and (iii) monitoring and controlling chemical residues. The second component of the project is support to productive partnerships. This component will demonstrate the feasibility of fostering the competitiveness of small-holder farmers and agribusinesses by facilitating the establishment, development, and operation of private, demand-driven productive partnerships (through public support provided on the basis of competitive and transparent procedures), improving private service delivery supporting productive partnerships, and enhancing the provincial rural investment climate. There are three subcomponents: (i) establishing new productive partnerships; (ii) scaling up successful value chain initiatives; and (iii) implementing an information campaign, networking, and match-making. The third component of the project is provision of critical infrastructure. This component will support critical public infrastructure needs supporting the competitiveness of the agricultural sector. These investments will contribute to increased agricultural productivity and the reduction of","http://d-portal.org/q.html?aid=44000-P108885"],
    [926,180400000,187240000,147775000,122268000,"2020-11-30T00:00:00",4079,"2009-09-30T00:00:00","LCTY",11.083,106.617,"Thoi Hoa",30213900,37829800,25719700,21540100,"Implementation","VN New Model University","The purpose of this Procurement Threshold Projects for Vietnam is to seek the approval of the country director to proceed with an umbrella restructuring to change the provisions for the Bank's review  thresholds specified in the respective Development Credit Agreement (DCA) or Financing Agreement (FA) for the projects in the Vietnam portfolio listed in annex one. The specific change for which approval is sought through this project paper is to change the provisions for 'review by the association of procurement decisions' of DCA or FA to reflect the new thresholds as defined in table one of these restructuring papers.","http://d-portal.org/q.html?aid=44000-P110693"],
    [927,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.822,106.646,"Quan Tru",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [928,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.857,106.674,"Tam Bac",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [929,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.838,106.664,"Niem 1 Bridge",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [930,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.689,106.701,"Nam Hai",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [931,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.875,106.591,"Bac Son",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [932,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.869,106.657,"Quan Hong Bang",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [933,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.73,106.665,"Huyen Kien Thuy",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [934,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.873,106.588,"Huyen An Hai",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [935,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.806,106.636,"Quan Kien An",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [936,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.858,106.702,"Quan Ngo Quyen",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [937,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.846,106.674,"Quan Le Chan",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [938,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.767,106.517,"Dai Cong",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [939,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.845,106.704,"Dong Khe",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [940,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.865,106.683,"Hai Phong",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [941,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.8,106.667,"Thanh Pho Hai Phong",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [942,175000000,170812000,125014000,108247000,"2018-08-31T00:00:00",3088,"2010-03-18T00:00:00","",20.805,106.626,"Kien An",114794000,140449000,96889800,78120400,"Implementation","VN-Haiphong Urban Transport Project","The objective of the Haiphong Urban Transport Development Project for Vietnam is to improve urban accessibility and strengthen capacity for urban transport management and planning in Haiphong. There are three components to the project, the first component being urban main road development. This component will increase urban accessibility through construction of a new east-west link (connected to main north-south links) for cross town traffic within Haiphong and longer distance freight to and from Haiphong's port system. The second component is the transport improvement. This component supports transformation of the public transportation services along the Tam Bac-Kien an urban corridor, including measures to strengthen institutional development for public transport management, piloting of transformative approaches to fleet management, acquisition of new buses, and upgrading of infrastructure and facilities. Finally, the third component is the capacity-building.","http://d-portal.org/q.html?aid=44000-P111548"],
    [943,50000000,49473400,38141500,30969900,"2018-09-30T00:00:00",2784,"2011-02-15T00:00:00","",20.533,105.967,"Tinh Ha Nam",21037200,25883600,17926400,14604200,"Implementation","VN- Industrial Pollution Management","The development objective of the Industrial Pollution Management Project for Vietnam is to improve compliance with industrial wastewater treatment regulations in four of the most industrialized provinces in Vietnam. There are three components to the project. The first component is environmental policy, monitoring and enforcement. This will comprise three subcomponents: (a) policy review and revision; (b) environmental monitoring and enforcement; and (c) information disclosure and public participation. Subcomponent (a) will provide support for a comprehensive review of the legal and regulatory framework on pollution management, including reviewing and revising laws, regulations, and other legal documents at central and provincial levels. Subcomponent (b) will support the development of environmental monitoring infrastructure and the improvement in environmental enforcement activities, including: (i) acquisition of testing laboratory equipment, standard samples, monitoring equipment, protection gears, and vehicles; (ii) acquisition and installation of automatic water quality monitoring stations; (iii) monitoring of surface water quality, Industrial zone (IZ) wastewater discharge, and inspection and enforcement; and (iv) development and upgrade of the environmental monitoring information management systems of Ministry of Natural Resources and Environment (MONRE) and the project provinces. Subcomponent (c) will support the development of an industrial pollution information disclosure system, including: (i) development of an environmental performance rating methodology; (ii) disclosure of environmental monitoring, enforcement results, and public complaint records on a website; (iii) maintenance of close communication with Centralized Effluent Treatment Plant (CETP) investors to enable them to understand the rating system and ways to improve their ratings; (iv) disclosure o","http://d-portal.org/q.html?aid=44000-P113151"],
    [944,50000000,49473400,38141500,30969900,"2018-09-30T00:00:00",2784,"2011-02-15T00:00:00","",20.25,106.25,"Tinh Nam Dinh",21037200,25883600,17926400,14604200,"Implementation","VN- Industrial Pollution Management","The development objective of the Industrial Pollution Management Project for Vietnam is to improve compliance with industrial wastewater treatment regulations in four of the most industrialized provinces in Vietnam. There are three components to the project. The first component is environmental policy, monitoring and enforcement. This will comprise three subcomponents: (a) policy review and revision; (b) environmental monitoring and enforcement; and (c) information disclosure and public participation. Subcomponent (a) will provide support for a comprehensive review of the legal and regulatory framework on pollution management, including reviewing and revising laws, regulations, and other legal documents at central and provincial levels. Subcomponent (b) will support the development of environmental monitoring infrastructure and the improvement in environmental enforcement activities, including: (i) acquisition of testing laboratory equipment, standard samples, monitoring equipment, protection gears, and vehicles; (ii) acquisition and installation of automatic water quality monitoring stations; (iii) monitoring of surface water quality, Industrial zone (IZ) wastewater discharge, and inspection and enforcement; and (iv) development and upgrade of the environmental monitoring information management systems of Ministry of Natural Resources and Environment (MONRE) and the project provinces. Subcomponent (c) will support the development of an industrial pollution information disclosure system, including: (i) development of an environmental performance rating methodology; (ii) disclosure of environmental monitoring, enforcement results, and public complaint records on a website; (iii) maintenance of close communication with Centralized Effluent Treatment Plant (CETP) investors to enable them to understand the rating system and ways to improve their ratings; (iv) disclosure o","http://d-portal.org/q.html?aid=44000-P113151"],
    [945,50000000,49473400,38141500,30969900,"2018-09-30T00:00:00",2784,"2011-02-15T00:00:00","",10.583,107.25,"Tinh Ba Ria-Vung Tau",21037200,25883600,17926400,14604200,"Implementation","VN- Industrial Pollution Management","The development objective of the Industrial Pollution Management Project for Vietnam is to improve compliance with industrial wastewater treatment regulations in four of the most industrialized provinces in Vietnam. There are three components to the project. The first component is environmental policy, monitoring and enforcement. This will comprise three subcomponents: (a) policy review and revision; (b) environmental monitoring and enforcement; and (c) information disclosure and public participation. Subcomponent (a) will provide support for a comprehensive review of the legal and regulatory framework on pollution management, including reviewing and revising laws, regulations, and other legal documents at central and provincial levels. Subcomponent (b) will support the development of environmental monitoring infrastructure and the improvement in environmental enforcement activities, including: (i) acquisition of testing laboratory equipment, standard samples, monitoring equipment, protection gears, and vehicles; (ii) acquisition and installation of automatic water quality monitoring stations; (iii) monitoring of surface water quality, Industrial zone (IZ) wastewater discharge, and inspection and enforcement; and (iv) development and upgrade of the environmental monitoring information management systems of Ministry of Natural Resources and Environment (MONRE) and the project provinces. Subcomponent (c) will support the development of an industrial pollution information disclosure system, including: (i) development of an environmental performance rating methodology; (ii) disclosure of environmental monitoring, enforcement results, and public complaint records on a website; (iii) maintenance of close communication with Centralized Effluent Treatment Plant (CETP) investors to enable them to understand the rating system and ways to improve their ratings; (iv) disclosure o","http://d-portal.org/q.html?aid=44000-P113151"],
    [946,50000000,49473400,38141500,30969900,"2018-09-30T00:00:00",2784,"2011-02-15T00:00:00","",11,107.167,"Tinh Dong Nai",21037200,25883600,17926400,14604200,"Implementation","VN- Industrial Pollution Management","The development objective of the Industrial Pollution Management Project for Vietnam is to improve compliance with industrial wastewater treatment regulations in four of the most industrialized provinces in Vietnam. There are three components to the project. The first component is environmental policy, monitoring and enforcement. This will comprise three subcomponents: (a) policy review and revision; (b) environmental monitoring and enforcement; and (c) information disclosure and public participation. Subcomponent (a) will provide support for a comprehensive review of the legal and regulatory framework on pollution management, including reviewing and revising laws, regulations, and other legal documents at central and provincial levels. Subcomponent (b) will support the development of environmental monitoring infrastructure and the improvement in environmental enforcement activities, including: (i) acquisition of testing laboratory equipment, standard samples, monitoring equipment, protection gears, and vehicles; (ii) acquisition and installation of automatic water quality monitoring stations; (iii) monitoring of surface water quality, Industrial zone (IZ) wastewater discharge, and inspection and enforcement; and (iv) development and upgrade of the environmental monitoring information management systems of Ministry of Natural Resources and Environment (MONRE) and the project provinces. Subcomponent (c) will support the development of an industrial pollution information disclosure system, including: (i) development of an environmental performance rating methodology; (ii) disclosure of environmental monitoring, enforcement results, and public complaint records on a website; (iii) maintenance of close communication with Centralized Effluent Treatment Plant (CETP) investors to enable them to understand the rating system and ways to improve their ratings; (iv) disclosure o","http://d-portal.org/q.html?aid=44000-P113151"],
    [947,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.788,104.12,"Huyen Mu Cang Chai",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [948,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.486,104.428,"Huyen Tram Tau",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [949,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.102,104.725,"Huyen Luc Yen",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [950,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.9,104.567,"Huyen Van Yen",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [951,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.557,104.64,"Huyen Van Chan",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [952,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.374,102.738,"Huyen Muong Te",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [953,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.607,103.392,"Huyen Phong Tho",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [954,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.299,103.275,"Huyen Sin Ho",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [955,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.034,103.123,"Huyen Muong Lay",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [956,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.954,103.373,"Huyen Tua Chua",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [957,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.695,103.418,"Huyen Tuan Giao",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [958,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.253,103.269,"Huyen Dien Bien Dong",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [959,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.833,104.75,"Huyen Moc Chau",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [960,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.214,104.69,"Huyen Phu Yen",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [961,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.25,104.385,"Huyen Bac Yen",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [962,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.159,104.048,"Huyen Mai Son",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [963,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",21.423,103.644,"Huyen Thuan Chau",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [964,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",20.422,105.621,"Huyen Yen Thuy",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [965,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",20.502,105.502,"Huyen Lac Son",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [966,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",20.606,105.234,"Huyen Tan Lac",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [967,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",20.663,105.031,"Huyen Mai Chau",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [968,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",20.901,105.079,"Huyen Da Bac",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [969,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.07,104.181,"Huyen Van Ban",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [970,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.671,104.118,"Huyen Muong Khuong",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [971,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.568,103.713,"Huyen Bat Xat",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [972,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","ADM2",22.338,103.84,"Huyen Sa Pa",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [973,249738000,281524000,214926000,168248000,"2018-06-30T00:00:00",3320,"2009-05-28T00:00:00","PPL",22.393,103.506,"Tam Duong",214439000,246814000,174480000,142922000,"Completion","VN-2nd Northern Mountains Poverty Redctn","The Second Northern Mountains Poverty Reduction Project (NMPRP-2 ) for Vietnam seeks to restructure the project by providing an additional credit (or additional financing) to the Socialist Republic of Vietnam for the Second Northern Mountains Poverty Reduction Project and the amendment to the Project Development Objective (PDO) of the original financing (i.e. level 1 restructuring to the original financing). The closing date of the additional financing would be June 30, 2018. The amended development objective is to enhance the living standards of the Project Beneficiaries by improving: (i) their access to productive infrastructure; (ii) the productive and institutional capacity of local governments and communities; (iii) commune integrated investment planning and (iv) market linkages and business innovations. The rationale for the additional financing request is to continue and scale up the activities that have proven to be effective and to explore means to mainstream the positive features of NMPRP-2 into the national programs, especially the successful livelihood support to common interest groups and the strengthened socio-economic development plan approach.","http://d-portal.org/q.html?aid=44000-P113493"],
    [974,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","PPLA",9.177,105.152,"Ca Mau",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [975,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","PPLA",10.037,105.788,"Can Tho",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [976,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","PPLA",10.46,105.633,"Cao Lanh",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [977,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","PPLA",10.36,106.36,"My Tho",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [978,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","PPLA",10.012,105.081,"Rach Gia",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [979,292000000,290206000,221201000,184615000,"2018-12-28T00:00:00",3195,"2010-03-30T00:00:00","ADM1",9.8,106.3,"Tinh Tra Vinh",216830000,275683000,188784000,152709000,"Completion","Mekong Delta Region Urban Upgrading Proj","The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure.","http://d-portal.org/q.html?aid=44000-P113904"],
    [980,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",9.776,105.464,"Hau Giang",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [981,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",9.083,105.083,"Tinh Ca Mau",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [982,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",9.3,105.5,"Tinh Bac Lieu",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [983,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",10.5,105.167,"Tinh An Giang",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [984,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",10.037,105.788,"Can Tho",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [985,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",10.117,105.5,"Tinh Can Tho",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [986,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",10,105.167,"Tinh Kien Giang",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [987,147345000,139665000,100371000,89158800,"2017-09-15T00:00:00",2523,"2010-10-19T00:00:00","",9.55,105.917,"Tinh Soc Trang",133354000,160191000,110803000,91202400,"Completion","VN-Mekong Delta Water Mgmt for Rural Dev","The objective of the Mekong Delta Water Management for Rural Development Project for Vietnam is to protect and enhance the utilization of water resources in the Mekong Delta. It is proposed to remove the project's results framework from the Financing Agreement and place said indicators in the relevant project manual. This amendment is part of the one-time amendment for 13 projects in order to assist the facilitation of timely and successful implementation activities and results of all 13 projects.","http://d-portal.org/q.html?aid=44000-P113949"],
    [988,263000000,285648000,206563000,175984000,"2020-12-31T00:00:00",3573,"2011-03-21T00:00:00","",22.486,103.971,"Lao Cai",164709000,205769000,141518000,114831000,"Implementation","Medium Cities Development Project","The objective of the Medium Cities Development Project for Vietnam is to promote sustainable urban development in the three medium sized cities of Lao Cai, Vinh, and Phu Ly through an integrated package of priority infrastructure investments based on a clear strategic vision for each city's development. The restructuring of the project responds to the request from the State Bank of Vietnam received on May 10, 2016. The request is to remove the project performance indicators from the Agreement to avoid further amendment in the future. This is a level two restructuring and the major modification being proposed is to remove project performance indicators from the financing agreement.","http://d-portal.org/q.html?aid=44000-P116398"],
    [989,263000000,285648000,206563000,175984000,"2020-12-31T00:00:00",3573,"2011-03-21T00:00:00","",20.545,105.912,"Phu Ly",164709000,205769000,141518000,114831000,"Implementation","Medium Cities Development Project","The objective of the Medium Cities Development Project for Vietnam is to promote sustainable urban development in the three medium sized cities of Lao Cai, Vinh, and Phu Ly through an integrated package of priority infrastructure investments based on a clear strategic vision for each city's development. The restructuring of the project responds to the request from the State Bank of Vietnam received on May 10, 2016. The request is to remove the project performance indicators from the Agreement to avoid further amendment in the future. This is a level two restructuring and the major modification being proposed is to remove project performance indicators from the financing agreement.","http://d-portal.org/q.html?aid=44000-P116398"],
    [990,263000000,285648000,206563000,175984000,"2020-12-31T00:00:00",3573,"2011-03-21T00:00:00","",18.673,105.692,"Vinh",164709000,205769000,141518000,114831000,"Implementation","Medium Cities Development Project","The objective of the Medium Cities Development Project for Vietnam is to promote sustainable urban development in the three medium sized cities of Lao Cai, Vinh, and Phu Ly through an integrated package of priority infrastructure investments based on a clear strategic vision for each city's development. The restructuring of the project responds to the request from the State Bank of Vietnam received on May 10, 2016. The request is to remove the project performance indicators from the Agreement to avoid further amendment in the future. This is a level two restructuring and the major modification being proposed is to remove project performance indicators from the financing agreement.","http://d-portal.org/q.html?aid=44000-P116398"],
    [991,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","R",16.071,108.209,"Ga Da Nang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [992,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.099,105.442,"Xa Long Dien Tay",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [993,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.776,105.464,"Hau Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [994,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [995,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.817,106.05,"Tinh Hung Yen",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [996,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.917,106.333,"Tinh Hai Duong",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [997,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.083,105.083,"Tinh Ca Mau",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [998,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [999,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.25,105.833,"Tinh Bac Kan",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1000,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.533,105.967,"Tinh Ha Nam",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1001,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.25,106.25,"Tinh Nam Dinh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1002,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.333,105.133,"Tinh Phu Tho",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1003,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",15.583,107.917,"Tinh Quang Nam",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1004,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.667,105.833,"Tinh Thai Nguyen",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1005,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.75,106.917,"Tinh Binh Phuoc",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1006,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.167,106.667,"Tinh Binh Duong",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1007,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.333,106.433,"Tinh Bac Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1008,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1009,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.5,105.167,"An Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1010,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.167,106.5,"Tinh Ben Tre",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1011,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",14.167,109,"Tinh Binh Dinh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1012,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","P",10.037,105.788,"Can Tho",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1013,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.75,106.083,"Tinh Cao Bang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1014,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.583,107.25,"Tinh Ba Ria-Vung Tau",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1015,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",12.75,108.25,"Tinh Dak Lak",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1016,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","P",16.068,108.221,"Da Nang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1017,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11,107.167,"Tinh Dong Nai",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1018,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.583,105.633,"Tinh Dong Thap",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1019,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1020,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","P",20.865,106.683,"Hai Phong",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1021,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21,105.75,"Ha Noi",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1022,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",13.75,108.25,"Gia Lai",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1023,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.75,105,"Tinh Ha Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1024,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1025,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",12.333,109,"Tinh Khanh Hoa",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1026,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10,105.167,"Tinh Kien Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1027,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.283,103.25,"Tinh Lai Chau",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1028,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.667,108.083,"Tinh Lam Dong",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1029,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.833,106.583,"Tinh Lang Son",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1030,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.7,106.167,"Long An",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1031,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1032,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",13.167,109.083,"Tinh Phu Yen",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1033,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",17.5,106.333,"Tinh Quang Binh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1034,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",15,108.667,"Tinh Quang Ngai",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1035,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1036,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",16.75,107,"Tinh Quang Tri",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1037,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.167,104,"Tinh Son La",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1038,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1039,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.5,106.367,"Tinh Thai Binh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1040,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1041,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","P",10.823,106.63,"Ho Chi Minh City",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1042,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",14.75,107.917,"Kon Tum",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1043,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",16.333,107.583,"Tinh Thua Thien-Hue",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1044,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.4,106.3,"Tinh Tien Giang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1045,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.3,104.167,"Tinh Lao Cai",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1046,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",21.75,104.583,"Tinh Yen Bai",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1047,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",10.1,106,"Tinh Vinh Long",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1048,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1049,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1050,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",9.55,105.917,"Tinh Soc Trang",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1051,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1052,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1053,99944400,102429000,77104500,66311100,"2017-06-30T00:00:00",2100,"2011-09-30T00:00:00","A",19.25,104.917,"Tinh Nghe An",95191100,112298000,78594600,61793900,"Completion","VN-School Readiness Promotion Project","The objective of the Vietnam School Readiness Promotion Project (SRPP) is to raise school readiness for 5 year old children, in particular for those most vulnerable to not succeeding in a school environment, through supporting selected elements of Vietnam's Early Childhood Education (ECE) program. There are two components to the project, the first component being promoting school readiness for disadvantaged children. On-budget funding will support the implementation of key elements of the Government's ECE program (program 239, complemented by decision 60). The SRPP will reimburse Government investments under the following eligible expenditure programs: (a) lunch subsidies3 for disadvantaged children aged 3-54, which will encourage participation and full day preschool attendance; and (b) salaries, including social and health insurance contributions, for contract preschool teachers to ease the shortage of teaching staff. Finally, the second component is the national early childhood education policy development and capacity building. The project will also finance technical assistance (TA), training expenditures, and operating costs to support capacity building and the further development of ECE policy over the coming years.","http://d-portal.org/q.html?aid=44000-P117393"],
    [1054,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","R",16.071,108.209,"Ga Da Nang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1055,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.099,105.442,"Xa Long Dien Tay",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1056,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.776,105.464,"Hau Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1057,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1058,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.817,106.05,"Tinh Hung Yen",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1059,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.917,106.333,"Tinh Hai Duong",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1060,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.083,105.083,"Tinh Ca Mau",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1061,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1062,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.25,105.833,"Tinh Bac Kan",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1063,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.533,105.967,"Tinh Ha Nam",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1064,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.25,106.25,"Tinh Nam Dinh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1065,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.333,105.133,"Tinh Phu Tho",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1066,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",15.583,107.917,"Tinh Quang Nam",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1067,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.667,105.833,"Tinh Thai Nguyen",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1068,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.75,106.917,"Tinh Binh Phuoc",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1069,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.167,106.667,"Tinh Binh Duong",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1070,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.333,106.433,"Tinh Bac Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1071,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1072,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.5,105.167,"An Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1073,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.167,106.5,"Tinh Ben Tre",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1074,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",14.167,109,"Tinh Binh Dinh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1075,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","P",10.037,105.788,"Can Tho",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1076,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.75,106.083,"Tinh Cao Bang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1077,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.583,107.25,"Tinh Ba Ria-Vung Tau",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1078,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",12.75,108.25,"Tinh Dak Lak",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1079,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","P",16.068,108.221,"Da Nang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1080,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11,107.167,"Tinh Dong Nai",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1081,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.583,105.633,"Tinh Dong thap",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1082,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1083,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","P",20.865,106.683,"Hai Phong",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1084,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21,105.75,"Ha Noi",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1085,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",13.75,108.25,"Gia Lai",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1086,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.75,105,"Tinh Hau Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1087,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1088,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",12.333,109,"Tinh Khanh Hoa",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1089,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10,105.167,"T?nh Kiên Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1090,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.283,103.25,"Tinh Lai Chau",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1091,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.667,108.083,"Tinh Lam Dong",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1092,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.833,106.583,"Tinh Lang Son",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1093,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.7,106.167,"Long An",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1094,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1095,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",13.167,109.083,"Tinh Phu Yen",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1096,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",17.5,106.333,"Tinh Quang Binh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1097,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",15,108.667,"Tinh Quang Ngai",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1098,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1099,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",16.75,107,"Tinh Quang Tri",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1100,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.167,104,"Tinh Son La",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1101,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1102,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.5,106.367,"Tinh Thai Binh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1103,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1104,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","P",10.823,106.63,"Ho Chi Minh City",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1105,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",14.75,107.917,"Kon Tum",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1106,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",16.333,107.583,"Tinh Thua Thien-Hue",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1107,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.4,106.3,"Tinh Tien Giang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1108,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.3,104.167,"Tinh Lao Cai",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1109,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",21.75,104.583,"Tinh Yen Bai",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1110,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",10.1,106,"Tinh Vinh Long",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1111,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1112,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1113,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",9.55,105.917,"Tinh Soc Trang",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1114,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1115,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1116,78000000,73818300,56232700,47424100,"2019-06-30T00:00:00",2739,"2011-12-30T00:00:00","A",19.25,104.917,"Tinh Nghe An",14371500,17772200,11710400,10082500,"Implementation","VN-Science&Technology Innovation","The development objective of the Fostering Innovation through Research, Science and Technology (FIRST) Project for Vietnam is to support science, technology and innovation (STI) in Vietnam by designing and piloting of STI policies, enhancing the effectiveness of project-aided research and development (R and D) institutions, and encouraging the development of innovative technology enterprises. The project has three components. The first component is knowledge and policy development. Under this component following activities will be carried out: (i) research on and pilot implementation of policies to attract overseas talented experts; and (ii) strengthening results measurement in STI. The second component is supporting Government Research Institutes (GRI) reform and enterprises innovation. This component will provide approximately fifteen GRI STI grants to selected GRIs in selected priority sectors. It will provide innovation links between enterprises and scientific communities. It will help in establishment of the national core technology laboratory for mechanical manufacturing automation and embedded technology. The third component is project management. This component will help in strengthening the institutional capacity of Ministry of Science and Technology (MOST) in order to implement the project and comply with the fiduciary, monitoring and evaluation, and reporting requirements. It will also help in carrying out of policy research programs on project activities.","http://d-portal.org/q.html?aid=44000-P117394"],
    [1117,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","R",16.071,108.209,"Ga Da Nang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1118,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.099,105.442,"Xa Long Dien Tay",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1119,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.776,105.464,"Hau Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1120,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1121,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.817,106.05,"Tinh Hung Yen",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1122,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.917,106.333,"Tinh Hai Duong",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1123,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.083,105.083,"Tinh Ca Mau",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1124,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1125,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.25,105.833,"Tinh Bac Kan",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1126,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.533,105.967,"Tinh Ha Nam",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1127,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.25,106.25,"Tinh Nam Dinh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1128,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.333,105.133,"Tinh Phu Tho",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1129,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",15.583,107.917," Tinh Quang Nam",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1130,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.667,105.833,"Tinh Thai Nguyen",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1131,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.75,106.917,"Tinh Binh Phuoc",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1132,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.167,106.667,"Tinh Binh Duong",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1133,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.333,106.433,"Tinh Bac Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1134,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1135,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.5,105.167,"An Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1136,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.167,106.5,"Tinh Ben Tre",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1137,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",14.167,109,"Tinh Binh Dinh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1138,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","P",10.037,105.788,"Can Tho",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1139,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.75,106.083,"Tinh Cao Bang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1140,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.583,107.25,"Tinh Ba Ria-Vung Tau",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1141,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",12.75,108.25,"Tinh Dak Lak",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1142,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","P",16.068,108.221,"Da Nang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1143,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11,107.167,"Tinh Dong Nai",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1144,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.583,105.633,"Tinh Dong Thap",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1145,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1146,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","P",20.865,106.683,"Hai Phong",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1147,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21,105.75,"Ha Noi",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1148,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",13.75,108.25,"Gia Lai",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1149,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.75,105,"Tinh Ha Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1150,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1151,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",12.333,109,"Tnh Khanh Hoa",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1152,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10,105.167,"Tinh Kien Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1153,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.283,103.25,"Tinh Lai Chau",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1154,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.667,108.083,"Tinh Lam Dong",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1155,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.833,106.583,"Tinh Lang Son",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1156,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.7,106.167,"Long An",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1157,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1158,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",13.167,109.083,"Tinh Phu Yen",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1159,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",17.5,106.333,"Tinh Quang Binh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1160,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",15,108.667,"Tinh Quang Ngai",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1161,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1162,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",16.75,107,"Tinh Quang Tri",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1163,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.167,104,"Tinh Son La",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1164,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1165,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.5,106.367,"Tinh Thai Binh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1166,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1167,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","P",10.823,106.63,"Ho Chi Minh City",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1168,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",14.75,107.917,"Kon Tum",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1169,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",16.333,107.583,"Tinh Thua Thien-Hue",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1170,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.4,106.3,"Tinh Tien Giang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1171,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.3,104.167,"Tinh Lao Cai",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1172,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",21.75,104.583,"Tinh Yen Bai",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1173,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",10.1,106,"Tinh Vinh Long",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1174,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1175,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1176,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",9.55,105.917,"Tinh Soc Trang",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1177,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1178,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1179,58142400,48227700,44002900,35706200,"2017-10-31T00:00:00",2713,"2010-05-28T00:00:00","A",19.25,104.917,"Tinh Nghe An",52797300,61073100,42890600,34236400,"Completion","VN-Project Preparation TA Facility","The objective of the Project Preparation Technical Assistance (TA) Facility Project for Vietnam is to increase the capacity of Government entities to plan and prepare public investments efficiently and to international quality standards. There are three components to the project, the first component being project preparation facility. The project will finance the preparation of a large number of sub-projects over a five-year implementation period. These range from large-scale infrastructure investments, requiring preparation budgets of up to US$20 million, to smaller scale social sector operations, requiring individual consultant inputs costing around US$0.5 million or less. The scope of this component will include all tasks required to complete the preparation of the selected subprojects so that their implementation can commence as soon as investment financing is available. The second component is the project preparation facility support and capacity building. This component provides support to Ministry of Planning and Investment (MPI), the project's executing agency to assist it with project implementation, and also for capacity building targeting Implementing Agencies (IAs), and broader policy dialogue and studies to improve the government's overall development program and project performance. Finally, the third component is the incremental operating costs and project management expenses.","http://d-portal.org/q.html?aid=44000-P118610"],
    [1180,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",15.583,107.917,"Tinh Quang Nam",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1181,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",14.167,109,"Tinh Binh Dinh",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1182,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","P",16.068,108.221,"Da Nang",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1183,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1184,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",17.5,106.333,"Tinh Quang Binh",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1185,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",15,108.667,"Tinh Quang Ngai",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1186,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",16.75,107,"Tinh Quang Tri",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1187,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1188,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1189,150000000,146726000,116552000,93062000,"2019-03-31T00:00:00",2575,"2012-03-12T00:00:00","A",19.25,104.917,"Tinh Nghe An",99488500,122202000,83334100,68193200,"Implementation","VN-Managing Natural Hazards Project","The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacit","http://d-portal.org/q.html?aid=44000-P118783"],
    [1190,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",9.083,105.083,"Tinh Ca Mau",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1191,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",14.167,109,"Tinh Binh Thuan",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1192,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1193,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",12.333,109,"Tinh Khanh Hoa",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1194,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",13.167,109.083,"Tinh Phu Yen",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1195,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1196,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",9.55,105.917,"Tinh Soc Trang",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1197,100000000,102806000,79834700,64267500,"2019-01-31T00:00:00",2498,"2012-03-30T00:00:00","A",19.25,104.917,"Tinh Nghe An",83529200,104850000,71663400,59161900,"Implementation","VN-Coastal Resources for Sustainable Dev","The development objective of the Additional Financing (AF) for the Coastal Resources for Sustainable Development (CRSD) Project for Vietnam is the same as that of the parent project: to improve the sustainable management of coastal fisheries in the project provinces. This project paper seeks the approval of the Executive Directors to provide Additional Financing (AF) by the Global Environment Facility (GEF) in the amount of US$6.5 million to this project to fill the financing gap due to the delay in obtaining GEF funds for CRSD, which was originally designed as a co-financed International Development Association (IDA)-GEF operation. These additional activities (originally designed) would enhance the likelihood of achieving the project's development of objective of improving the sustainable management of coastal fisheries in the project provinces. The decision on the use of savings will be made based on the CRSD mid-term review in 2015.","http://d-portal.org/q.html?aid=44000-P118979"],
    [1198,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",15.592,108.506,"Thi Xa Tam Ky",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1199,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",15.583,107.917,"Tinh Quang Nam",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1200,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.75,106.917,"Tinh Binh Phuoc",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1201,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.167,106.667,"Tinh Binh Duong",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1202,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",16.805,107.091,"Thi Xa Dong Ha",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1203,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",20.086,105.885,"Thi Xa Bim Son",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1204,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.931,108.474,"Thanh Pho Da Lat",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1205,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",21.084,106.768,"Thi Xa Uong Bi",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1206,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",10.255,104.015,"Huyen Phu Quoc",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1207,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",20.078,105.86,"Bim Son",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1208,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.946,108.442,"Da Lat",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1209,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",16.816,107.1,"Dong Ha",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1210,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.535,106.883,"Dong Xoai",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1211,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",21,105.75,"Thu Do Ha Noi",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1212,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",10,105.167,"Tinh Kien Giang",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1213,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",11.667,108.083,"Tinh Lam Dong",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1214,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",19.3,105.433,"Nghia Dan",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1215,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",20.258,105.98,"Ninh Binh",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1216,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",21.25,107.333,"Tinh Quang Ninh",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1217,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",16.75,107,"Tinh Quang Tri",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1218,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",15.574,108.474,"Tam Ky",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1219,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",20.067,105.333,"Tinh Thanh Hoa",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1220,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",21.034,106.77,"Uong Bi",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1221,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",20.233,105.9,"Tinh Ninh Binh",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1222,319000000,348753000,244990000,207144000,"2019-12-31T00:00:00",3176,"2011-04-21T00:00:00","",19.25,104.917,"Tinh Nghe An",189834000,232033000,160474000,126768000,"Implementation","VN-Urban Water Supply and Wastewater","The development objective of the Urban Water Supply and Wastewater Project for Vietnam is to increase access to sustainable water services and environmental sanitation in selected urban areas in the project provinces. The project comprises of two components. The first component, investments and project Implementation that includes seven subprojects under subcomponent 1A: water supply progress under the works contracts is going well, with physical progress Ministry of Construction (MOC) at 98 percent. Two water supply subprojects have been completed and the remaining five will be completed before the project closing date and seven subprojects under subcomponent 1B: environmental sanitation, each implemented by the provinces. The second component, technical assistance that includes institutional strengthening and project monitoring implemented by the MOC under subcomponent 2A and improving the efficiency of investments and operations undertaken by the Ministry of Planning and Investment (MPI) under Subcomponent 2B","http://d-portal.org/q.html?aid=44000-P119077"],
    [1223,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.042,106.59,"Ba Tri District Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1224,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.12,106.315,"Cu Lao Minh District Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1225,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.239,106.379,"Ben Tre General Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1226,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.532,106.426,"Long An General Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1227,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.472,105.626,"Dong Thap General Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1228,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.288,105.771,"General Hospital of Sa Dec",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1229,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.341,106.579,"Go Cong District Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1230,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.406,106.129,"Cai Lay District Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1231,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.355,106.365,"Tien Giang General Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1232,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",9.996,105.094,"Kien Giang Hospital of Traditional Medicine",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1233,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",21.016,105.848,"Hanoi Hospital of Traditional Medicine",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1234,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",9.978,105.106,"Kien Giang Provincial General Hospital",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1235,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.811,105.293,"Huyen Hong Ngu",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1236,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.544,105.819,"Huyen Thap Muoi",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1237,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.388,105.946,"Huyen Cai Be",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1238,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.4,106.658,"Thi Xa Go Cong",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1239,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.066,106.606,"Huyen Ba Tri",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1240,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.167,106.5,"Tinh Ben Tre",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1241,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.945,106.824,"Bien Hoa",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1242,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.4,106.117,"Cai Lay",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1243,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",11,107.167,"Tinh Dong Nai",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1244,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.583,105.633,"Tinh Dong Thap",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1245,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",21.025,105.841,"Ha Noi",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1246,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10,105.167,"Tinh Kien Giang",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1247,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.7,106.167,"Tinh Long An",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1248,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.291,105.756,"Sa Dec",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1249,150000000,146410000,107155000,92782800,"2019-08-30T00:00:00",3256,"2010-09-30T00:00:00","",10.4,106.3,"Tinh Tien Giang",109693000,139166000,94661300,75730500,"Implementation","Hospital Waste Management Support","The development objective of the Hospital Waste Management Support Project is to reduce environmental degradation and potential risks for human health through the improved management of health care waste in Vietnam's hospitals. There are three components to the project. The first component of the project is policy and institutional environment strengthening. The aim of this component is: (i) to create enabling policy environment for effective management of health care waste generated by the health sector; and (ii) to strengthen the institutional capacities of relevant ministries and agencies to implement, monitor and enforce health care waste pollution standards and associated management practices. The second component of the project is hospital waste management improvement facility. The objective of this component is the strengthening of individual health care facilities in environmentally sound health care waste management and occupational safety practices. The component will provide grants to finance sub-projects in eligible central and provincial hospitals, with a priority on larger hospitals (which are typically larger waste generators) in more densely populated areas. The third component of the project is project implementation support and coordination. This component will support: (i) the establishment and operation of the Central Project Management Unit (CPMU) under the Ministry of Health (MOH); and (ii) coordination between the MOH and concerned ministries and agencies in implementing the project.","http://d-portal.org/q.html?aid=44000-P119090"],
    [1250,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","R",16.071,108.209,"Ga Da Nang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1251,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.099,105.442,"Xa Long Dien Tay",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1252,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.776,105.464,"Hau Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1253,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1254,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.817,106.05,"Tinh Hung Yen",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1255,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.917,106.333,"Tinh Hai Duong",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1256,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.083,105.083,"Tinh Ca Mau",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1257,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1258,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.25,105.833,"Tinh Bac Kan",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1259,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.533,105.967,"Tinh Ha Nam",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1260,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.25,106.25,"Tinh Nam Dinh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1261,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.333,105.133,"Tinh Phu Tho",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1262,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",15.583,107.917,"Tinh Quang Nam",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1263,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.667,105.833,"Tinh Thai Nguyen",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1264,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.75,106.917,"Tinh Binh Phuoc",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1265,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.167,106.667,"Tinh Binh Duong",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1266,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.333,106.433,"Tinh Bac Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1267,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1268,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.5,105.167,"An Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1269,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.167,106.5,"Tinh Ben Tre",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1270,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",14.167,109,"Tinh Binh Dinh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1271,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","P",10.037,105.788,"Can Tho",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1272,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.75,106.083,"Tinh Cao Bang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1273,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.583,107.25,"Tinh Ba Ria-Vung Tau",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1274,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",12.75,108.25,"Tinh Dak Lak",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1275,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","P",16.068,108.221,"Da Nang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1276,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11,107.167,"Tinh Dong Nai",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1277,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.583,105.633,"Tinh Dong Thap",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1278,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1279,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","P",20.865,106.683,"Hai Phong",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1280,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21,105.75,"Ha Noi",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1281,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",13.75,108.25,"Gia Lai",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1282,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.75,105,"Tinh Ha Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1283,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1284,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",12.333,109,"Tinh Khanh Hoa",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1285,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10,105.167,"Tinh Kien Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1286,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.283,103.25,"Tinh Lai Chau",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1287,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.667,108.083,"Tinh Lam Dong",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1288,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.833,106.583,"Tinh Lang Son",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1289,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.7,106.167,"Long An",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1290,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1291,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",13.167,109.083,"Tinh Phu Yen",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1292,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",17.5,106.333,"Tinh Quang Binh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1293,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",15,108.667,"Tinh Quang Ngai",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1294,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1295,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",16.75,107,"Tinh Quang Tri",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1296,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.167,104,"Tinh Son La",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1297,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1298,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.5,106.367,"Tinh Thai Binh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1299,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1300,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","P",10.823,106.63,"Ho Chi Minh City",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1301,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",14.75,107.917,"Kon Tum",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1302,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",16.333,107.583,"Tinh Thua Thien-Hue",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1303,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.4,106.3,"Tinh Tien Giang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1304,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.3,104.167,"Tinh Lao Cai",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1305,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",21.75,104.583,"Tinh Yen Bai",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1306,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",10.1,106,"Tinh Vinh Long",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1307,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1308,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1309,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",9.55,105.917,"Tinh Soc Trang",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1310,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1311,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1312,6416660,-7915360,-1561930,-2416280,"2017-06-30T00:00:00",2227,"2011-05-26T00:00:00","A",19.25,104.917,"Tinh Nghe An",1384030,1295180,1078520,339266,"Completion","Vietnam Inclusive Innovation","The development objective of the Inclusive Innovation Project for Vietnam is to adopt, upgrade and develop inclusive innovations for the benefit of the Base of Pyramid population.(BoP). The project has four components. The first component is development of inclusive technologies. This component will provide support: (i) developing technological solutions to address a few National Development Challenges (NDCs) that are specific to Vietnam; and (ii) developing, acquiring, adapting and upgrading inclusive technologies by Research and Development (R&D) institutions, enterprises and grassroots innovators. The second component is scale up and commercialization of inclusive technologies. This component will provide loans and matching grants to private enterprises for upgrading, scaling up and commercialization of inclusive technologies. This will include: (i) support enterprises for scaling up, commercialization and sustainable production of inclusive technologies dealing with manufacturing of products and delivery of services for the BoP; and (ii) funding to private sector Small and Medium Enterprises (SMEs) for the acquisition, adoption and use of technology and innovations in priority areas with significant potential for technological upgrading and growth. The third component is capacity building and global knowledge transfer. The project will support capacity building of key Vietnamese national institutions such as the National Institute of Medicine Materials (NIMM), the National Hospital of Traditional Medicine (NHTM), National Foundation for Science and Technology Development (NAFOSTED), Vietnam Academy of Sciences and Technology (VAST), Hanoi University of Science and Technology (HUST) for the sustainable development and delivery of inclusive technologies in the priority areas supported under the project: a) enhancing technology, quality and clinical trials of traditi","http://d-portal.org/q.html?aid=44000-P121643"],
    [1313,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.817,106.05,"Tinh Hung Yen",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1314,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.917,106.333,"Tinh Hai Duong",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1315,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.533,105.967,"Tinh Ha Nam",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1316,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.25,106.25,"Tinh Nam Dinh",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1317,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",21.333,105.133,"Tinh Phu Tho",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1318,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",21.667,105.833,"Tinh Thai Nguyen",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1319,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",21.333,106.433,"Tinh Bac Giang",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1320,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",21.833,106.583,"Tinh Lang Son",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1321,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.667,105.333,"Tinh Hoa Binh",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1322,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.5,106.367,"Tinh Thai Binh",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1323,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",21.75,104.583,"Tinh Yen Bai",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1324,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",22.117,105.25,"Tinh Tuyen Quang",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1325,150000000,154611000,113737000,96914600,"2019-12-31T00:00:00",2842,"2012-03-20T00:00:00","",20.233,105.9,"Tinh Ninh Binh",77990400,101577000,69681500,58106900,"Implementation","VN-NORRED","The development objective of the North East and Red River Delta Regional Health System Support Project for Vietnam is to increase the efficiency and equity in the use of hospital services in selected provinces of the North East and Red River Delta regions. The project will be achieved through two principals: (A) strengthening the capacity of local hospitals to deliver quality hospital services; and (B) reducing the financial barriers to accessing health services by the economically vulnerable. The project consists of the following three components, the first component is strengthening the capacity of lower level hospitals to deliver quality services, it aims to support the implementation of the government master plan on reducing hospital overcrowding 14 through increasing the capacity of the health system to provide more and better quality health services in the project provinces; the second  component is reducing the financial barriers to access health services by the economically vulnerable, it aims to support the implementation of the government master plan on Universal Health Coverage (UHC) through reducing the financial barriers to accessing health services, particularly for the poor and near poor. And the final third component is  project management, monitoring and evaluation, it aim to ensure adequate management structure, processes and human resource capacities for the project, and to setup mechanisms for effective monitoring of activities and evaluation of results.","http://d-portal.org/q.html?aid=44000-P122629"],
    [1326,275020000,305161000,218127000,187485000,"2019-06-30T00:00:00",2484,"2012-09-10T00:00:00","",16.083,108.083,"Thanh Pho Da Nang",100000000,124460000,84293600,68914300,"Implementation","VN-Danang Sustainable City Development","The development objective of the Danang Sustainable City Development Project (SCDP) for Vietnam is to expand access of city residents to improved drainage, wastewater collection and treatment services, the arterial road network, and public transport in selected areas of Da Nang city. There are five components to the project. The first component of the project is drainage and wastewater improvement. The second component of the project is bus rapid transit development. The third component of the project is urban strategic roads. This component comprises: improvement of the connectivity of the urban arterial system, including construction of two new east-west connecting roads to the north-south bypass of Da Nang and the national expressway network; and construction of resettlement sites. The fourth component of the project is technical assistance and capacity building. The fifth component of the project is transferred activities of Da Nang priority infrastructure investment project. This component support completion of some major infrastructure for which construction started under the Priority Infrastructure Investment Project (PIIP).","http://d-portal.org/q.html?aid=44000-P123384"],
    [1327,60000000,66658300,43408000,36094000,"2019-12-31T00:00:00",2541,"2013-01-15T00:00:00","",15.583,107.917,"Tinh Quang Nam",28513000,37218100,25370400,20679100,"Implementation","VN-Social Assistance System Strengthenin","The objective of the Social Assistance System Strengthening Project for Vietnam is to support the government in strengthening the social assistance system by developing innovations in management and service delivery nationwide, and by piloting these innovations in the four project provinces. The project consists of the following components: 1) strengthening the social assistance and poverty reduction system; 2) launching a consolidated social assistance program; and 3) project management. The first component supports the development and testing of improved mechanisms for social assistance delivery and management. The second component tests the mechanisms developed under the first component, through the launching of social assistance consolidation, and the final component provides project management and capacity building support. This paper pertains to the provision of a credit for the project.","http://d-portal.org/q.html?aid=44000-P123960"],
    [1328,60000000,66658300,43408000,36094000,"2019-12-31T00:00:00",2541,"2013-01-15T00:00:00","",22.823,104.984,"Ha Giang",28513000,37218100,25370400,20679100,"Implementation","VN-Social Assistance System Strengthenin","The objective of the Social Assistance System Strengthening Project for Vietnam is to support the government in strengthening the social assistance system by developing innovations in management and service delivery nationwide, and by piloting these innovations in the four project provinces. The project consists of the following components: 1) strengthening the social assistance and poverty reduction system; 2) launching a consolidated social assistance program; and 3) project management. The first component supports the development and testing of improved mechanisms for social assistance delivery and management. The second component tests the mechanisms developed under the first component, through the launching of social assistance consolidation, and the final component provides project management and capacity building support. This paper pertains to the provision of a credit for the project.","http://d-portal.org/q.html?aid=44000-P123960"],
    [1329,60000000,66658300,43408000,36094000,"2019-12-31T00:00:00",2541,"2013-01-15T00:00:00","",11.667,108.083,"Tinh Lam Dong",28513000,37218100,25370400,20679100,"Implementation","VN-Social Assistance System Strengthenin","The objective of the Social Assistance System Strengthening Project for Vietnam is to support the government in strengthening the social assistance system by developing innovations in management and service delivery nationwide, and by piloting these innovations in the four project provinces. The project consists of the following components: 1) strengthening the social assistance and poverty reduction system; 2) launching a consolidated social assistance program; and 3) project management. The first component supports the development and testing of improved mechanisms for social assistance delivery and management. The second component tests the mechanisms developed under the first component, through the launching of social assistance consolidation, and the final component provides project management and capacity building support. This paper pertains to the provision of a credit for the project.","http://d-portal.org/q.html?aid=44000-P123960"],
    [1330,60000000,66658300,43408000,36094000,"2019-12-31T00:00:00",2541,"2013-01-15T00:00:00","",9.947,106.342,"Tra Vinh",28513000,37218100,25370400,20679100,"Implementation","VN-Social Assistance System Strengthenin","The objective of the Social Assistance System Strengthening Project for Vietnam is to support the government in strengthening the social assistance system by developing innovations in management and service delivery nationwide, and by piloting these innovations in the four project provinces. The project consists of the following components: 1) strengthening the social assistance and poverty reduction system; 2) launching a consolidated social assistance program; and 3) project management. The first component supports the development and testing of improved mechanisms for social assistance delivery and management. The second component tests the mechanisms developed under the first component, through the launching of social assistance consolidation, and the final component provides project management and capacity building support. This paper pertains to the provision of a credit for the project.","http://d-portal.org/q.html?aid=44000-P123960"],
    [1331,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.817,106.05,"Tinh Hung Yen",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1332,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.817,106.05,"Tinh Hung Yen",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1333,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.917,106.333,"Tinh Hai Duong",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1334,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.917,106.333,"Tinh Hai Duong",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1335,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.917,106.333,"Tinh Hai Duong",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1336,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1337,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",22.75,105,"Tinh Ha Giang",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1338,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1339,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",21.167,104,"Tinh Son La",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1340,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.5,106.367,"Tinh Thai Binh",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1341,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",20.5,106.367,"Tinh Thai Binh",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1342,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1343,250000000,265991000,182508000,152684000,"2020-12-31T00:00:00",3220,"2012-03-08T00:00:00","A",19.25,104.917,"Tinh Nghe An",145630000,189488000,128077000,105316000,"Implementation","Vietnam Road Asset Management Project","The objective of the Vietnam Road Asset Management Project is to improve the efficiency and sustainability of the road asset management and maintenance practices performed by the country??s Ministry of Transport on national roads. The project consists of the following components: 1) Road Asset Management System (RAMS) development, with a goal towards financing the development and implementation of a comprehensive Road Asset Management System; 2) road asset preservation, aimed at supporting Performance-Based Contracts (PBCs) to demonstrate more efficient maintenance of selected highways, in addition to funding traditional road asset maintenance works; 3) road asset improvement, with an objective of financing improvement of road assets for high priority road sections of the national road network and other related activities, supervision of improvement works and undertaking of environmental and social monitoring; and undertaking technical, internal and financial audits; and 4) institutional strengthening, aimed at supporting targeted activities to develop the capacity of Vietnam??s road agencies to undertake better planning, budgeting, constructing, and monitoring of road assets.","http://d-portal.org/q.html?aid=44000-P123961"],
    [1344,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",9.776,105.464,"Hau Giang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1345,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",9.083,105.083,"Tinh Ca Mau",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1346,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1347,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10.5,105.167,"An Giang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1348,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10.167,106.5,"Tinh Ben Tre",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1349,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",12.75,108.25,"Tinh Dak Lak",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1350,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","P",16.068,108.221,"Da Nang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1351,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10.583,105.633,"Tinh Dong Thap",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1352,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",13.75,108.25,"Gia Lai",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1353,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10,105.167,"Tinh Kien Giang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1354,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",11.667,108.083,"Tinh Lam Dong",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1355,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10.7,106.167,"Long An",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1356,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1357,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",14.75,107.917,"Kon Tum",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1358,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",10.4,106.3,"Tinh Tien Giang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1359,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1360,25000000,26599100,18250800,15268400,"2019-04-30T00:00:00",2618,"2012-02-28T00:00:00","A",9.55,105.917,"Tinh Soc Trang",3580880,4592380,3058940,2543250,"Implementation","Mekong IWRM Project- Phase II","The development objective of the Second Phase of the Mekong Integrated Water Resources Management Project for Vietnam is to develop the capacity of the ministry of natural resources and environment, Vietnam national Mekong committee, and relevant agencies to manage trans-boundary water resources and climate risks through river basin approaches and improved water resources data collection, analysis, and exchange. The project has four components. The first component is support for the institutional development of integrated water resources management in the Vietnam part of the Sesan-Srepok basin. This component will support the following activities: establishment and support for operation of a river basin organization; provision of support for river basin planning and studies; provision of support for monitoring; capacity development; and component management. The second component is establishment of a water resources monitoring network at the border areas with Cambodia and Lao People??s Democratic Republic (PDR) in the lower Mekong and a water resources information system for the Vietnam part of the lower Mekong. This component will support the following activities: development of water resources monitoring networks at the border areas with Cambodia and Lao PDR in the Mekong delta and the central highlands to measure and analyze data on water quality and quantity; establishment of a water resources information system for the lower Mekong in Vietnam; provision of support for a salinity monitoring pilot for Kien Giang province; and component management. The third component is strengthening the hydro-meteorological information network, flood forecasting, and warning system in the central highlands. This component will include the following activities: strengthening of hydrometeorology network and forecasting services in the central highlands; institutional strengthening an","http://d-portal.org/q.html?aid=44000-P124942"],
    [1361,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","R",16.071,108.209,"Ga Da Nang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1362,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",9.776,105.464,"Hau Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1363,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1364,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.817,106.05,"Tinh Hung Yen",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1365,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.917,106.333,"Tinh Hai Duong",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1366,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",9.083,105.083,"Tinh Ca Mau",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1367,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",9.3,105.5,"Tinh Bac Lieu",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1368,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.25,105.833,"Tinh Bac Kan",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1369,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.533,105.967,"Tinh Ha Nam",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1370,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.25,106.25,"Tinh Nam Dinh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1371,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.333,105.133,"Tinh Phu Tho",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1372,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",15.583,107.917,"Tinh Quang Nam",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1373,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.667,105.833,"Tinh Thai Nguyen",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1374,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.75,106.917,"Tinh Binh Phuoc",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1375,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.167,106.667,"Tinh Binh Duong",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1376,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.333,106.433,"Tinh Bac Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1377,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.1,106.1,"Tinh Bac Ninh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1378,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.5,105.167,"An Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1379,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.167,106.5,"Tinh Ben Tre",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1380,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",14.167,109,"Tinh Binh Dinh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1381,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","P",10.037,105.788,"Can Tho",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1382,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.75,106.083,"Tinh Cao Bang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1383,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.583,107.25,"Tinh Ba Ria-Vung Tau",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1384,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",12.75,108.25,"Tinh Dak Lak",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1385,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","P",16.068,108.221,"Da Nang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1386,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11,107.167,"Tinh Dong Nai",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1387,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.583,105.633,"Tinh Dong Thap",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1388,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1389,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","P",20.865,106.683,"Hai Phong",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1390,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21,105.75,"Ha Noi",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1391,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",13.75,108.25,"Gia Lai",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1392,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.75,105,"Tinh Ha Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1393,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1394,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",12.333,109,"Tinh Khanh Hoa",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1395,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10,105.167,"Tinh Kien Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1396,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.283,103.25,"Tinh Lai Chau",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1397,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.667,108.083,"Tinh Lam Dong",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1398,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.833,106.583,"Tinh Lang Son",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1399,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.7,106.167,"Long An",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1400,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1401,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",13.167,109.083,"Tinh Phu Yen",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1402,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",17.5,106.333,"Tinh Quang Binh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1403,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",15,108.667,"Tinh Quang Ngai",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1404,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1405,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",16.75,107,"Tinh Quang Tri",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1406,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.167,104,"Tinh Son La",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1407,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1408,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","P",20.65,106.683,"Thai Binh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1409,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1410,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","P",10.823,106.63,"Ho Chi Minh City",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1411,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",14.75,107.917,"Kon Tum",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1412,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",16.333,107.583,"Tinh Thua Thien-Hue",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1413,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.4,106.3,"Tinh Tien Giang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1414,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.3,104.167,"Tinh Lao Cai",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1415,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",21.75,104.583,"Tinh Yen Bai",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1416,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",10.1,106,"Tinh Vinh Long",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1417,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1418,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",9.8,106.3,"Tinh Tra Vinh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1419,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",9.55,105.917,"Tinh Soc Trang",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1420,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1421,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1422,448900000,439103000,348800000,278503000,"2018-12-31T00:00:00",2301,"2012-09-12T00:00:00","A",19.25,104.917,"Tinh Nghe An",419165000,496571000,345149000,275536000,"Implementation","VN-Distribution Efficiency Project","The development objectives of the Distribution Efficiency Project are to improve the performance of Vietnam's power corporations (PCs) in providing quality and reliable electricity services, and to reduce greenhouse gas emissions through demand side response and efficiency gains. There are three components to the project. The first component is system expansion and reinforcement. This component will cover construction and reinforcement of 110 kV, Medium Voltage (MV) and Low Voltage (LV) electricity distribution networks, including substations, of the PCs. These investments will help the PCs to efficiently meet load growth, address load supply constraints due to distribution system congestion, reduce losses, and improve reliability and quality of power supply. The second component is introduction of smart grid technologies in distribution. This component, which includes Clean Technology Fund (CTF) co-financing, will focus on (i) automation, through introduction of supervisory control and data acquisition systems, of electricity distribution network operations of and data collection by the PCs; and (ii) introduction of Advanced metering infrastructure (AMI) systems, including two-way communication systems, as electricity distribution smart grid technologies for key substations and consumers of selected PCs. Supporting the first stage of the roadmap for smart grid technologies for power distribution in Vietnam, the component will assist to increase efficiency, reliability and effectiveness of the PCs' systems and operations, and optimize distribution system configuration by providing real time data from both the supply and the demand side. The third component is technical assistance and capacity building. Provision of technical assistance to and capacity building of Electricity Regulatory Authority of Vietnam (ERAV) for improvement of efficiency in electricity tariffs, e","http://d-portal.org/q.html?aid=44000-P125996"],
    [1423,124000000,153336000,110588000,79729200,"2020-12-31T00:00:00",2471,"2014-03-27T00:00:00","",10.823,106.63,"Ho Chi Minh City",68318,89467,62128.6,51126.9,"Implementation","29","The development objective of the Ho Chi Minh City Green Transport Development Project for Vietnam is to improve the performance and efficiency of public transport along a high priority corridor in Ho Chi Minh City. The project comprises of two components. The first component, bus rapid transit (BRT) corridor development will include: (a) carrying out the construction and supervision of the BRT infrastructure and facilities; (b) improvement of the traffic management system, including the modification of intersection controls and the deployment of an intelligent transport system and associated technologies; (c) development of a fare collection system, including smart cards and servers; (d) provision of BRT vehicles and fueling facilities; (e) carrying out integrated planning and urban development measures around BRT stations; (f) carrying out of marketing and public communication activities; (g) provision of support for project management; and (h) land acquisition and resettlement. The second component, institutional strengthening will include: (a) carrying out of training programs and technical support for relevant implementing agencies in project management, urban transport planning, and public transport operation including strategic support for the operation of the BRT system; (b) carrying out of monitoring and evaluation activities, including the assessment of the BRT system success on an on-going basis; (c) carrying out of feasibility and design studies for maximizing connectivity and ridership and continued development of the BRT system; and (d) carrying out of a study to develop the optimal fare structure and fare product range for the public transportation system.","http://d-portal.org/q.html?aid=44000-P126507"],
    [1424,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",21.333,105.567,"Tinh Vinh Phuc",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1425,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",20.817,106.05,"Tinh Hung Yen",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1426,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",20.533,105.967,"Tinh Ha Nam",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1427,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",21.333,105.133,"Tinh Phu Tho",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1428,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",21.1,106.1,"Tinh Bac Ninh",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1429,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",21,105.75,"Thanh Pho Ha Noi",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1430,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",21.25,107.333,"Tinh Quang Ninh",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1431,200000000,197894000,152566000,123880000,"2019-07-31T00:00:00",2344,"2013-02-28T00:00:00","",20.067,105.333,"Tinh Thanh Hoa",140957000,171224000,119162000,97484000,"Implementation","VN-Rural Water Supply&Sanitation (P4R)","The objective of the Results-Based Rural Water and Sanitation under the National Target Program Project for Vietnam is to increase sustained access to water supply and sanitation services and improve sector planning, monitoring and evaluation in the participating provinces of the Third Phase of the National Target Program for Rural Water Supply and Sanitation (NTP3). The program, to be co-financed by the proposed International Development Association, or IDA operation, will support NTP3 in eight geographically-clustered provinces. In these provinces, a new approach for NTP3 will be tested through the introduction of results-based planning and financing and by strengthening the institutional mechanisms related to governance, procurement, and financial management and environmental and social management systems. The program will therefore seek to progressively transform the NTP into a more focused and efficient system for delivering sustainable investments.","http://d-portal.org/q.html?aid=44000-P127435"],
    [1432,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",15.583,107.917,"Tinh Quang Nam",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1433,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",12.167,107.75,"Dak Nong",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1434,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",12.75,108.25,"Tinh Dak Lak",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1435,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",13.75,108.25,"Tinh Gia Lai",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1436,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",15,108.667,"Tinh Quang Ngai",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1437,150000000,159595000,109505000,91610300,"2019-12-31T00:00:00",2576,"2012-12-11T00:00:00","",14.75,107.917,"Tinh Kon Tum",78405300,102526000,69142200,58665100,"Implementation","VN-Central Highlands Poverty Reduction","The development objective of the Central Highlands Poverty Reduction Project for Vietnam is to enhance living standards by improving livelihood opportunities in project communes of upland districts of the central highlands of Vietnam. The project has four components. The first component is village and commune infrastructure development. It has following two sub-components: (i) support the design, construction or repair of small-scale village, and commune-level infrastructure (such as simple access roads, terracing, irrigation or water supply, basic social infrastructure, etc.) through the provision of block grants; and (ii) finance sub-projects for the repair, operation, and maintenance (O and M) of communal infrastructure. The second component, sustainable livelihoods development will support ethnic minorities (EMs) and other households in the targeted areas to enhance their food security and nutrition, their productive capacities for more diversified income sources, and their linkages to selected agricultural markets. It has following two sub-components: (i) target chronically poor and at risk households; and (ii) aim to develop productive partnerships (PP) between farmer groups and agribusinesses (ABs) which are operating in the targeted areas for proven commercially viable agriculture or agro-forestry endeavors. The third component is connective infrastructure development, capacity building, and communications. It has following three sub-components: (a) finance selective intra- and inter-commune level infrastructure that will strengthen physical connectivity within and between local economic zones; (b) support training and capacity building at all project levels for all aspects of project management; and (c) support communications activities to ensure beneficiaries, project staff, key stakeholders, and the public at large are aware of the project objectives and op","http://d-portal.org/q.html?aid=44000-P128072"],
    [1438,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",21.333,105.133,"Tinh Phu Tho",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1439,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",15.583,107.917,"Tinh Quang Nam",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1440,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",22.75,105,"Tinh Ha Giang",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1441,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1442,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",20.667,105.333,"Tinh Hoa Binh",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1443,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",16.75,107,"Tinh Quang Tri",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1444,180000000,199975000,130224000,108282000,"2020-12-31T00:00:00",2576,"2013-12-12T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",86238200,111773000,76249900,61665800,"Implementation","Irrigated Agriculture Improvement","The objective of the Irrigated Agriculture Improvement Project for Vietnam is to improve the sustainability of irrigated agricultural production systems in selected central coastal and northern mountains provinces in the country. The project consists of the following components: 1) improved irrigation water management, 2) irrigation and drainage scheme level improvements, 3) support services for climate-smart agricultural practices, and 4) project management, and monitoring and evaluation. The first component seeks to improve institutional capacity for modern, efficient, and accountable irrigation and drainage service delivery. The second component is to improve bulk water delivery to irrigation systems, service delivery, and management in the selected irrigation and drainage schemes. The third component aims to build on the improved irrigation infrastructure and water delivery activities realized under the previous component, to improve the productivity and quality of agriculture, increase farmers' incomes, and reduce their vulnerability to adverse climatic events. The final component of the project supports the operating costs of the implementing agencies.","http://d-portal.org/q.html?aid=44000-P130014"],
    [1445,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",20.25,106.25,"Tinh Nam Dinh",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1446,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",21.333,102.933,"Huyen Dien Bien",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1447,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",12.167,107.75,"Dak Nong",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1448,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",22.75,106.083,"Tinh Cao Bang",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1449,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",10.583,105.633,"Tinh Dong Thap",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1450,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",13.75,108.25,"Tinh Gia Lai",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1451,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",22.75,105,"Tinh Ha Giang",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1452,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",22.283,103.25,"Tinh Lai Chau",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1453,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",11.667,108.083,"Tinh Lam Dong",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1454,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",21.167,104,"Tinh Son La",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1455,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",20.5,106.367,"Tinh Thai Binh",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1456,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",14.75,107.917,"Tinh Kon Tum",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1457,86000000,88259200,60174400,47083600,"2020-12-31T00:00:00",2260,"2014-10-24T00:00:00","",21.75,104.583,"Tinh Yen Bai",7805730,10250200,6971930,5918520,"Implementation","Health Prof. Edc and Trg (HPET)","The development objectives of the Health Professionals Education and Training for Health System Reforms Project for Vietnam are to improve the quality of health professional's education, strengthen management competencies in the health sector, and improve the competencies of primary health care (PHC) teams at the grass-roots level. The project comprises of four components. The first component, improve the quality of health professionals education comprises of following two sub-components: (i) improve the quality assurance system of health professionals education will support the establishment, by ministry of health (MOH) decision, of a quality assurance (QA) council initially for medical and nursing education which in time can include other health disciplines such as pharmacy, public health, etc.; and (ii) supportive measures to meet the standards of health professionals education will be the reference for determining investment needs. The second component, strengthen management a competency in the health sector comprises of following two sub-components: (i) strengthen health management training will support Hanoi school of public health (HSPH) and Ho Chi Minh city (HCMC) institute of public health to strengthen their capacity in health management training; and (ii) improve policy-making in human resources for health aims to improve coverage and distribution of human resources for health (HRH), particularly in the disadvantaged areas. The third component, improve competencies of primary health care teams at the grass-roots level will address significant HRH issues particularly: (a) the mismatch between the knowledge and skills competencies of existing health personnel at grass-roots level and the burden of disease in the community; and (b) lack of modern equipment at commune health stations (CHS). It has following two sub-components: (i) train PHC teams at the grass-r","http://d-portal.org/q.html?aid=44000-P131825"],
    [1458,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",22.25,105.833,"Tinh Bac Kan",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1459,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",21.667,105.833,"Tinh Thai Nguyen",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1460,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",21.333,102.933,"Huyen Dien Bien",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1461,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",22.75,106.083,"Tinh Cao Bang",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1462,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",20.667,105.333,"Tinh Hoa Binh",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1463,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",21.75,104.583,"Tinh Yen Bai",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1464,250000000,270885000,183927000,147894000,"2021-06-30T00:00:00",2589,"2014-05-29T00:00:00","",22.117,105.25,"Tinh Tuyen Quang",95772100,125916000,84773000,70269700,"Implementation","Nat'l Urban Devt Program - NM","The Result-Based Northern Mountains Urban Program Project aims to enable participating northern mountains cities to effectively plan, deliver and sustain priority infrastructure services through strengthened systems and capacity, with the support of the Ministry of Construction, or MOC. The program will have four key results areas, namely: (a) institutional strengthening at city level; (b) delivery of infrastructure services in participating cities; (c) sustainable infrastructure investments; and (d) national policy, support and oversight. These results areas are designed to work together to improve the quality of infrastructure delivery by CPCs. The results framework (annex two) provides the basis on which the MOC will support the participating cities to appropriately measure and report on progress. This enhances monitoring and evaluation (M&E) for the NUDP and will enable the MOC to collate the results to assess program performance, progress in achieving the Disbursement Linked Indicator, or DLIs, and implications for national urban policies and programs. Monitoring and evaluation capacity will be enhanced through the program's capacity building component in order to strengthen the Government's ability to monitor indicators of program progress through the results framework. In association with the submission of the annual financial statements, participating cities will report annually against individual DLIs and results indicators (city results report), and provide evidence of compliance with individual indicators as specified in the Program Operational Manual, or POM.","http://d-portal.org/q.html?aid=44000-P143596"],
    [1465,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",9.776,105.464,"Hau Giang",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1466,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","",12.167,107.75,"Dak Nong",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1467,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10.5,105.167,"An Giang",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1468,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","",12.75,108.25,"Tinh GJak Lak",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1469,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10.583,105.633,"Tinh Dong Thap",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1470,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10.117,105.5,"Can Tho",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1471,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","",13.75,108.25,"Gia Lai",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1472,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10,105.167,"Tinh Kien Giang",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1473,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",11.667,108.083,"Tinh Lam Dong",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1474,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10.7,106.167,"Long An",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1475,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","T",10.333,106.667,"Mekong Delta",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1476,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","",14.75,107.917,"Kon Tum",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1477,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",10.4,106.3,"Tinh Tien Giang",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1478,238000000,294305000,212257000,153029000,"2020-12-31T00:00:00",2359,"2014-07-17T00:00:00","A",9.55,105.917,"Tinh Soc Trang",61517700,79431300,52858300,45655400,"Implementation","Sustainable Agriculture Transformation","The development objective of the Sustainable Agriculture Transformation Project for Vietnam is to improve farming practices and value chains in the targeted project areas, and promote institutional strengthening of relevant public agencies to effectively support implementation of the agricultural restructuring plan. The project comprises of four components. The first component, institutional strengthening to support agricultural transformation will support three activities: (a) capacity development for ministry of agriculture and rural development (MARD); (b) capacity development for the provincial level; and (c) capacity strengthening for value chain partners. The second component, supporting sustainable rice-based systems will support some 30 key rice producing districts in eight Mekong Delta (MKD) provinces in a cluster approach. It will consist of three activities: (a) supporting a large-scale program on improved agronomic practices and management; (b) supporting private sector investments in upgrading rice processing technology and facilities for high value and quality rice; and (c) improving public services delivery. The third component, supporting sustainable coffee production and rejuvenation will support the transformation of a substantial portion of Vietnam's coffee sector to sustainable practices. This component has three activities: (a) supporting an intensive coffee program on improved farm agronomic and management practices; (b) supporting sustainable coffee rejuvenation and replanting; and (c) improving public services delivery. The fourth component, project management, monitoring and evaluation will support: (a) project management; and (b) monitoring and evaluation.","http://d-portal.org/q.html?aid=44000-P145055"],
    [1479,77000000,95216500,68671500,49509200,"2020-12-31T00:00:00",2102,"2015-03-31T00:00:00","",21.025,105.841,"Hanoi",5425920,7150920,4710960,4130980,"Implementation","Renovation of General Education Project","The objective of the Renovation of General Education Project for Vietnam is to raise student learning outcomes by: (i) revising and implementing the curriculum following a competency-based approach; and (ii) improving the effectiveness of instruction by creating and disseminating textbooks aligned with the revised curriculum. There are four components to the project, the first component being curriculum development. This component will support the development and implementation of a revised curriculum that is competency-based for all school subjects from grades 1-12. The second component is the development and dissemination of aligned textbooks. This component will support the development a set of textbooks aligned with the new curriculum and the provision of aligned textbooks to schools with high numbers of economically-disadvantaged students. This component includes two sub-components: development of textbooks aligned with the new curriculum; and provision of textbooks to disadvantaged schools. The third component is the learning assessment and analysis for continuous improvement of curriculum and policy. This component includes three sub-components: establishment of the National Centre for Sustainable Development of General Education Quality (NCSDGEQ) and the National Center for Foreign Language Testing (NCFLT); research and capacity-building on curriculum development and assessment; and expansion of the national large-scale assessment system. Finally, the fourth component is the project management. This component combines project management with monitoring and evaluations (M&E).","http://d-portal.org/q.html?aid=44000-P150058"],
    [1480,77000000,95216500,68671500,49509200,"2020-12-31T00:00:00",2102,"2015-03-31T00:00:00","",16.167,107.833,"Socialist Republic of Vietnam",5425920,7150920,4710960,4130980,"Implementation","Renovation of General Education Project","The objective of the Renovation of General Education Project for Vietnam is to raise student learning outcomes by: (i) revising and implementing the curriculum following a competency-based approach; and (ii) improving the effectiveness of instruction by creating and disseminating textbooks aligned with the revised curriculum. There are four components to the project, the first component being curriculum development. This component will support the development and implementation of a revised curriculum that is competency-based for all school subjects from grades 1-12. The second component is the development and dissemination of aligned textbooks. This component will support the development a set of textbooks aligned with the new curriculum and the provision of aligned textbooks to schools with high numbers of economically-disadvantaged students. This component includes two sub-components: development of textbooks aligned with the new curriculum; and provision of textbooks to disadvantaged schools. The third component is the learning assessment and analysis for continuous improvement of curriculum and policy. This component includes three sub-components: establishment of the National Centre for Sustainable Development of General Education Quality (NCSDGEQ) and the National Center for Foreign Language Testing (NCFLT); research and capacity-building on curriculum development and assessment; and expansion of the national large-scale assessment system. Finally, the fourth component is the project management. This component combines project management with monitoring and evaluations (M&E).","http://d-portal.org/q.html?aid=44000-P150058"],
    [1481,101700000,135240000,90568000,79444500,"2022-07-31T00:00:00",2340,"2016-03-04T00:00:00","P",21.025,105.841,"Hanoi",420440,545041,343943,303477,"Implementation","Vietnam Energy Efficiency Financing","The objective of the Energy Efficiency for Industrial Enterprises (VEEIE) for Vietnam is to improve energy efficiency in Vietnam's industrial sector. The project has 2 components. (1) Energy Efficiency Investment Lending component consists of an Energy Efficiency lending program. An Operational Manual (OM) was developed, which outlines selection criteria for subborrowers and subprojects, appraisal procedures, roles and responsibilities of the Participating Financial Institutions (PFIs) and the government, the PFIs internal institutional arrangement for project implementation, technical evaluation, environmental and social assessment, procurement, and financial management frameworks that are consistent with the Bank and the Vietnamese government rules and procedures. During project implementation, the PFIs will be responsible for identifying, appraising and financing subprojects that meet the criteria in the OM and will bear all associated risks. (2) Project Implementation Support component will provide technical assistance and capacity building support to Ministry of Industry and Trade on Project monitoring and supervision, including audits of project activities and safeguards implementation.","http://d-portal.org/q.html?aid=44000-P151086"],
    [1482,101700000,135240000,90568000,79444500,"2022-07-31T00:00:00",2340,"2016-03-04T00:00:00","P",21.594,105.848,"Thanh Pho Thai Nguyen",420440,545041,343943,303477,"Implementation","Vietnam Energy Efficiency Financing","The objective of the Energy Efficiency for Industrial Enterprises (VEEIE) for Vietnam is to improve energy efficiency in Vietnam's industrial sector. The project has 2 components. (1) Energy Efficiency Investment Lending component consists of an Energy Efficiency lending program. An Operational Manual (OM) was developed, which outlines selection criteria for subborrowers and subprojects, appraisal procedures, roles and responsibilities of the Participating Financial Institutions (PFIs) and the government, the PFIs internal institutional arrangement for project implementation, technical evaluation, environmental and social assessment, procurement, and financial management frameworks that are consistent with the Bank and the Vietnamese government rules and procedures. During project implementation, the PFIs will be responsible for identifying, appraising and financing subprojects that meet the criteria in the OM and will bear all associated risks. (2) Project Implementation Support component will provide technical assistance and capacity building support to Ministry of Industry and Trade on Project monitoring and supervision, including audits of project activities and safeguards implementation.","http://d-portal.org/q.html?aid=44000-P151086"],
    [1483,101700000,135240000,90568000,79444500,"2022-07-31T00:00:00",2340,"2016-03-04T00:00:00","P",10.823,106.63,"Ho Chi Minh City",420440,545041,343943,303477,"Implementation","Vietnam Energy Efficiency Financing","The objective of the Energy Efficiency for Industrial Enterprises (VEEIE) for Vietnam is to improve energy efficiency in Vietnam's industrial sector. The project has 2 components. (1) Energy Efficiency Investment Lending component consists of an Energy Efficiency lending program. An Operational Manual (OM) was developed, which outlines selection criteria for subborrowers and subprojects, appraisal procedures, roles and responsibilities of the Participating Financial Institutions (PFIs) and the government, the PFIs internal institutional arrangement for project implementation, technical evaluation, environmental and social assessment, procurement, and financial management frameworks that are consistent with the Bank and the Vietnamese government rules and procedures. During project implementation, the PFIs will be responsible for identifying, appraising and financing subprojects that meet the criteria in the OM and will bear all associated risks. (2) Project Implementation Support component will provide technical assistance and capacity building support to Ministry of Industry and Trade on Project monitoring and supervision, including audits of project activities and safeguards implementation.","http://d-portal.org/q.html?aid=44000-P151086"],
    [1484,101700000,135240000,90568000,79444500,"2022-07-31T00:00:00",2340,"2016-03-04T00:00:00","A",16.167,107.833,"Socialist Republic of Vietnam",420440,545041,343943,303477,"Implementation","Vietnam Energy Efficiency Financing","The objective of the Energy Efficiency for Industrial Enterprises (VEEIE) for Vietnam is to improve energy efficiency in Vietnam's industrial sector. The project has 2 components. (1) Energy Efficiency Investment Lending component consists of an Energy Efficiency lending program. An Operational Manual (OM) was developed, which outlines selection criteria for subborrowers and subprojects, appraisal procedures, roles and responsibilities of the Participating Financial Institutions (PFIs) and the government, the PFIs internal institutional arrangement for project implementation, technical evaluation, environmental and social assessment, procurement, and financial management frameworks that are consistent with the Bank and the Vietnamese government rules and procedures. During project implementation, the PFIs will be responsible for identifying, appraising and financing subprojects that meet the criteria in the OM and will bear all associated risks. (2) Project Implementation Support component will provide technical assistance and capacity building support to Ministry of Industry and Trade on Project monitoring and supervision, including audits of project activities and safeguards implementation.","http://d-portal.org/q.html?aid=44000-P151086"],
    [1485,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1486,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",20.917,106.333,"Tinh Hai Duong",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1487,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",22.25,105.833,"Tinh Bac Kan",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1488,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",21.333,105.133,"Tinh Phu Tho",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1489,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",15.583,107.917,"Tinh Quang Nam",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1490,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",21.333,106.433,"Tinh Bac Giang",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1491,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",12.167,107.75,"Dak Nong",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1492,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",14.167,109,"Tinh Binh Dinh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1493,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",10.583,107.167,"Song Ca",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1494,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",12.75,108.25,"Tinh Dak Lak",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1495,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",11.083,108.083,"Tinh Binh Thuan",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1496,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",13.75,108.25,"Gia Lai",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1497,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",22.75,105,"Tinh Ha Giang",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1498,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","P",20.817,105.338,"Thanh Pho Hoa Binh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1499,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1500,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",12.333,109,"Tinh Khanh Hoa",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1501,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",11.667,108.083,"Tinh Lam Dong",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1502,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",20.667,105.333,"Tinh Hoa Binh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1503,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",13.167,109.083,"Tinh Phu Yen",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1504,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",17.5,106.333,"Tinh Quang Binh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1505,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",15,108.667,"Tinh Quang Ngai",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1506,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1507,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",16.75,107,"Tinh Quang Tri",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1508,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",11.55,108.983,"Song Quao",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1509,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",21.167,104,"Tinh Son La",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1510,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",11.333,106.167,"Tinh Tay Ninh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1511,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",20.067,105.333,"Tinh Thanh Hoa",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1512,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",14.75,107.917,"Kon Tum",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1513,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",16.333,107.583,"Tinh Thua Thien-Hue",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1514,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",15.863,108.274,"Song Thu Bon",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1515,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",15.846,108.117,"Song Vu Gia",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1516,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","",21.75,104.583,"Tinh Yen Bai",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1517,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",22.117,105.25,"Tinh Tuyen Quang",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1518,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",11.75,108.833,"Tinh Ninh Thuan",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1519,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",20.233,105.9,"Tinh Ninh Binh",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1520,415000000,568673000,381556000,276823000,"2022-06-30T00:00:00",2387,"2015-12-17T00:00:00","A",19.25,104.917,"Tinh Nghe An",6122660,7993610,5162410,4544240,"Implementation","VN  Dam Reha. and Safety Impro. Project","The objective of the Dam Rehabilitation and Safety Improvement Project for Vietnam is to improve the safety of targeted dams under the Government's Dam Safety Program to protect downstream communities and economic activities through priority investments and capacity enhancement. There are three components to the project, the first component being dam safety rehabilitation. This component will be implemented through MARD and the provinces with the aim of improving the safety of irrigation dams through physical rehabilitation of existing infrastructure. The implementation includes two different approaches required for the rehabilitation of small community-managed and large dams. The difference between the two approaches relates not only to the types of works and the regulatory framework involved, but also the institutional and implementation arrangements required to undertake such works and ensure their sustainable operations and maintenance. The second component is the dam safety management and planning. This component will be implemented through MARD, MOIT and MONRE with the aim of improving the planning and operational framework for dam management to safeguard the downstream communities and socio-economic infrastructure. Finally, the third component is the project management support.","http://d-portal.org/q.html?aid=44000-P152309"],
    [1521,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","",21.377,105.568,"Xa Huong Dao",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1522,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.217,105.512,"Vinh Tuong",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1523,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","A",21.306,105.662,"Huyen Binh Xuyen",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1524,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","A",21.333,105.567,"Tinh Vinh Phuc",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1525,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","A",21.218,105.576,"Huyen Yen Lac",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1526,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","H",21.265,105.702,"Ba Hanh",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1527,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.279,105.647,"Huong Canh",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1528,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","",21.417,105.517,"Ngoc Lien",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1529,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.237,105.705,"Phuc Yen",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1530,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.393,105.614,"Trai Ngau",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1531,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","",21.38,105.689,"Thanh Lanh",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1532,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","",21.298,105.598,"Dam Vac",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1533,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.522,105.519,"Vinh Ninh",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1534,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.309,105.605,"Vinh Yen",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1535,150000000,193368000,133589000,105623000,"2021-12-31T00:00:00",2103,"2016-03-29T00:00:00","P",21.236,105.573,"Yen Lac",5694900,7458690,4870840,4281480,"Implementation","Vinh Phuc Flood Risk","The development objective of the Vinh Phuc Flood Risk and Water Management Project for Vietnam is to strengthen flood risk management capacity and improve wastewater management in the central catchment of Vinh Phuc province. The project comprises of three components. The first component, flood risk management improves flood risk management through structural measures in basin B (including sub-basins B-1, B-2, and B-3) and basin C. The second component, water environment management aim to improve the environmental conditions in densely populated small towns and rural communities, as well as the water quality in the Phan River by providing wastewater and drainage services. The third component, implementation support, technical assistance, and institutional strengthening supports: (a) project implementation, including detailed engineering designs (DEDs), construction supervision, safeguard monitoring, project management office (PMO) support, and other related activities; (b) water resource, flood information, and early warning systems, including consulting services, works, equipment, and other related activities; (c) operation and maintenance (O and M) for assets to be built under the project, including training, development of operation manuals, and provision of necessary equipment; and (d) institutional development for river basin management and water-related sectors in an integrated manner.","http://d-portal.org/q.html?aid=44000-P152460"],
    [1536,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",9.993,105.785,"Cai Rang",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1537,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",10.011,105.812,"Rach Cai Sau",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1538,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",10.046,105.753,"Rach Ngong",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1539,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",11,106.633,"Rach Ba Co",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1540,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","P",10.074,105.74,"Binh Thuy",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1541,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",10.037,105.788,"Can Tho",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1542,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",9.117,105.333,"Rach Dai Su",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1543,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",10.117,105.5,"Thanh Pho Can Tho",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1544,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",12.683,109.217,"Song Hau",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1545,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","T",10.333,106.667,"Mekong Delta",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1546,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","H",10.297,105.851,"Mekong River",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1547,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","P",10.11,105.623,"O Mon",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1548,250000000,330622000,225222000,175702000,"2022-06-30T00:00:00",2289,"2016-03-24T00:00:00","",10.11,105.623,"O Mon",22714600,29824100,19475600,17121100,"Implementation","Can Tho Urban Development and Resilience","The development objective of the Can Tho Urban Development and Resilience Project for Vietnam is to reduce flood risk in the urban core area, improve connectivity between the city center and the new low risk urban growth areas, and enhance the capacity of city authorities to manage disaster risk in Can Tho city. The project comprises of three components. The first component, flood risk management and environmental sanitation objective is to reduce flood related risks in the urban core of Can Tho. This component consists of a balance between structural and non-structural measures to help the city manage urban flood risk. It consists of three sub-components: (i) priority flood control investments in urban core; (ii) drainage and waste water systems; and (iii) operation of the city integrated flood risk management system and early warning system. The second component, urban corridor development objective is to increase intra-city connectivity and encourage compact, mixed-use, pedestrian, and public transport oriented urban development in the less flood prone area of Cai Rang. It consists of three sub-components: (i) road and bridge links; (ii) construction of the residential area for resettlement; and (iii) effective transport systems management and equipment. The third component, spatial planning platform and financial and social protection instruments objective is to build management systems to improve spatial planning, data and information management, post-disaster budget execution, and the responsiveness of safety nets to flood events. It consists of two sub-components: (i) risk informed spatial planning platform; and (ii) disaster responsive social assistance system.","http://d-portal.org/q.html?aid=44000-P152851"],
    [1549,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",9.083,105.083,"Tinh Ca Mau",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1550,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",9.3,105.5,"Tinh Bac Lieu",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1551,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",10.5,105.167,"An Giang",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1552,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",10.167,106.5,"Tinh Ben Tre",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1553,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",10.583,105.633,"Tinh GJong Thap",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1554,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",10,105.167,"Tinh Kien Giang",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1555,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",10.1,106,"Tinh Vinh Long",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1556,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",9.8,106.3,"Tinh Tra Vinh",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1557,310000000,399627000,276085000,218287000,"2022-12-31T00:00:00",2570,"2015-12-18T00:00:00","",9.55,105.917,"Tinh Soc Trang",5151140,6745630,4390490,3861320,"Implementation","Mekong Delta Integrated Climate Resilien","The development objectives of the Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project for Vietnam are to enhance tools for climate-smart planning and improve climate resilience of land and water management practices in selected provinces of the Mekong delta in Vietnam. The project comprises of five components. The first component, enhancing monitoring, analytics, and information systems provides the framework for ensuring the capacity to undertake ???smart investments and cope with anticipated wide-scale environmental changes. It consists of three sub-components: (i) monitoring systems to enhance Mekong delta knowledge base; (ii) infrastructure and information systems for enhanced decisions; and (iii) mainstreaming climate resilience into planning processes. The second component, managing floods in the upper delta objective is to protect and or reclaim the benefits of controlled flooding (flood retention) measures while increasing rural incomes and protecting high-value assets in An Giang, Kien Giang, and Dong Thap provinces. The third component, adapting to salinity transitions in the delta estuary aims to address the challenges related to salinity intrusion, coastal erosion, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ben Tre, Tra Vinh, and Soc Trang provinces. The fourth component, protecting coastal areas in the Delta Peninsula aims to address the challenges related to coastal erosion, groundwater management, sustainable aquaculture, and improved livelihoods for communities living in the coastal areas of Ca Mau, Bac Lieu, and Kien Giang provinces. The fifth component, project management and implementation supports project management and capacity building for ministry of agriculture and rural development (MARD), ministry of natural resources and environment (MONRE), and the ministry of p","http://d-portal.org/q.html?aid=44000-P153544"],
    [1558,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",20.533,105.967,"Tinh Ha Nam",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1559,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",20.25,106.25,"Tinh Nam GJinh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1560,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.667,105.833,"Tinh Thai Nguyen",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1561,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.333,106.433,"Tinh Bac Giang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1562,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.1,106.1,"Tinh Bac Ninh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1563,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.5,105.167,"An Giang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1564,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.167,106.5,"Tinh Ben Tre",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1565,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",22.75,106.083,"Tinh Cao Bang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1566,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",12.75,108.25,"Tinh GJak Lak",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1567,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",20.8,106.667,"Thanh Pho Hai Phong",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1568,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.117,105.5,"Thanh Pho Can Tho",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1569,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",18.333,105.75,"Tinh Ha Tinh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1570,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",12.333,109,"Tinh Khanh Hoa",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1571,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10,105.167,"Tinh Kien Giang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1572,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",11.667,108.083,"Tinh Lam GJong",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1573,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.833,106.583,"Tinh Lang Son",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1574,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.7,106.167,"Long An",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1575,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",13.167,109.083,"Tinh Phu Yen",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1576,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",17.5,106.333,"Tinh Quang Binh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1577,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",15,108.667,"Tinh Quang Ngai",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1578,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",16.75,107,"Tinh Quang Tri",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1579,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.167,104,"Tinh Son La",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1580,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",11.333,106.167,"Tinh Tay Ninh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1581,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",20.5,106.367,"Tinh Thai Binh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1582,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",16.333,107.583,"Tinh Thua Thien-Hue",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1583,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.4,106.3,"Tinh Tien Giang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1584,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",22.3,104.167,"Tinh Lao Cai",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1585,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",21.75,104.583,"Tinh Yen Bai",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1586,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",10.1,106,"Tinh Vinh Long",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1587,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",22.117,105.25,"Tinh Tuyen Quang",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1588,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",9.8,106.3,"Tinh Tra Vinh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1589,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",20.233,105.9,"Tinh Ninh Binh",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1590,150000000,196629000,133753000,114165000,"2021-12-31T00:00:00",2005,"2016-07-05T00:00:00","",19.25,104.917,"Tinh Nghe An",0,0,0,0,"Implementation","Program for Improved Land Governance","The development objective of the Improved Land Governance and Database (VILG) Project for Vietnam is to improve the efficiency and transparency of land administration services in the Project Provinces, through the development and implementation of the national Multipurpose Land Information System (MPLIS). The project comprises three components. The first component, strengthening the quality of land service delivery will support (a) modernization and strengthening of local land administration by simplifying standard operating procedures and guidelines and improving business processes to enable the Land Registration Offices (LROs) to provide better quality and more accessible land services, though most of these activities will be financed by the Government using its own budget; (b) training and support for public awareness raising and communication among stakeholders, including implementation of ethnic minority development plans; and (c) establishing and operating a monitoring and evaluation (M&E) system for land use management. The investments under this component will support quality enhancement of land service delivery by streamlining service procedures and standards, renovating facilities, and enhancing the capacity of personnel working in LROs in project provinces. The component will support unification of business standards and provide LROs with equipment and working facilities at sub-national levels. The second component, establishment and development of the multi-purpose land information system (MPLIS) and land database will provide technical assistance for the development of MPLIS and land database, finance digitization of existing maps and records on land use rights; updating and integration of cadastre data (both cadastre map users and land use information), land price data, land use plan data, and land statistics and inventory to improve the completeness and","http://d-portal.org/q.html?aid=44000-P154387"],
    [1591,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",17.177,106.917,"Bau Sen",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1592,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",17.483,106.629,"Song Nhat Le",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1593,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",17.767,106.333,"Con Cuoi",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1594,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",12.567,109.233,"Dong Hai",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1595,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",12.245,109.194,"Nha Trang",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1596,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",11.564,108.989,"Phan Rang-Thap Cham",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1597,236200000,314098000,210346000,184511000,"2022-12-31T00:00:00",2221,"2016-12-01T00:00:00","",11.55,109,"Tan Tai",115000,148713,93219.8,82323.7,"Implementation","Coastal Cities Sustainable Environment P","The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to increase access to sanitation services and improve the operational performance of sanitation utilities in the Project Cities. This project has four components. 1) The first component, Sanitation Infrastructure Expansion, aims to contribute to PDO achievement (increase access to sanitation services) through investments in flood reduction works and drainage and wastewater collection networks. 2) The second component, Urban Connectivity Improvement, aims to create new key arterial roads/link roads/local roads or upgrade existing ones, thereby increasing the connectivity of the cities road network. 3) The third component, Compensation and Site Clearance, aims to provide funding for compensation, site clearance, and resettlement site works. 4) The fourth component, Implementation Support and Institutional Reform, aims to contribute to Project development objective (PDO) achievement (improve the operational performance of sanitation utilities in select cities) through a capacity strengthening program for the Project Management Units (PMUs) and relevant agencies, and reform activities related to implementation of Decree 80 (institutional reorganization, household connection policy, revolving funds in Nha Trang, Phan Rang, and Quy Nhon, service contracts and private sector participation, tariffs/cost recovery).","http://d-portal.org/q.html?aid=44000-P156143"],
    [1598,155000000,206118000,138034000,121081000,"2022-12-31T00:00:00",2200,"2016-12-22T00:00:00","",21.025,105.841,"Hanoi",0,0,0,0,"Implementation","Support for Autonomous Higher Education","The development objective of the Support for Autonomous Higher Education Project for Vietnam is to improve research, teaching, and institutional capacity at selected autonomous universities and strengthen the national higher education management system. The project has two components. The first component, improved research, teaching, and institutional management capacity at three selected autonomous universities will support the three selected autonomous universities so that they can provide lessons for the wider higher education system. Each university belongs to one of three types of Higher Education Institution (HEIs) and thus will serve as pilot models whose lessons can then be generalized into the revised policy on HE autonomy and quality assurance. Each university has its own subcomponent and will manage its own activities. The second component, strengthened national higher education (HE) management system and e-library establishment will strengthen the national HE system by supporting policy development and strengthening key HE subsystems. It will support the establishment of an eLibrary Portal, as one of the national system strengthening measures. Ministry of Education and Training (MOET) will be responsible managing Component 2, as well as monitoring and reporting on the project as a whole. The eLibrary Portal subcomponent will be managed by the National Economic University (NEU) on behalf of MOET.","http://d-portal.org/q.html?aid=44000-P156849"],
    [1599,155000000,206118000,138034000,121081000,"2022-12-31T00:00:00",2200,"2016-12-22T00:00:00","P",10.823,106.63,"Ho Chi Minh City",0,0,0,0,"Implementation","Support for Autonomous Higher Education","The development objective of the Support for Autonomous Higher Education Project for Vietnam is to improve research, teaching, and institutional capacity at selected autonomous universities and strengthen the national higher education management system. The project has two components. The first component, improved research, teaching, and institutional management capacity at three selected autonomous universities will support the three selected autonomous universities so that they can provide lessons for the wider higher education system. Each university belongs to one of three types of Higher Education Institution (HEIs) and thus will serve as pilot models whose lessons can then be generalized into the revised policy on HE autonomy and quality assurance. Each university has its own subcomponent and will manage its own activities. The second component, strengthened national higher education (HE) management system and e-library establishment will strengthen the national HE system by supporting policy development and strengthening key HE subsystems. It will support the establishment of an eLibrary Portal, as one of the national system strengthening measures. Ministry of Education and Training (MOET) will be responsible managing Component 2, as well as monitoring and reporting on the project as a whole. The eLibrary Portal subcomponent will be managed by the National Economic University (NEU) on behalf of MOET.","http://d-portal.org/q.html?aid=44000-P156849"],
    [1600,155000000,206118000,138034000,121081000,"2022-12-31T00:00:00",2200,"2016-12-22T00:00:00","",16.167,107.833,"Socialist Republic of Vietnam",0,0,0,0,"Implementation","Support for Autonomous Higher Education","The development objective of the Support for Autonomous Higher Education Project for Vietnam is to improve research, teaching, and institutional capacity at selected autonomous universities and strengthen the national higher education management system. The project has two components. The first component, improved research, teaching, and institutional management capacity at three selected autonomous universities will support the three selected autonomous universities so that they can provide lessons for the wider higher education system. Each university belongs to one of three types of Higher Education Institution (HEIs) and thus will serve as pilot models whose lessons can then be generalized into the revised policy on HE autonomy and quality assurance. Each university has its own subcomponent and will manage its own activities. The second component, strengthened national higher education (HE) management system and e-library establishment will strengthen the national HE system by supporting policy development and strengthening key HE subsystems. It will support the establishment of an eLibrary Portal, as one of the national system strengthening measures. Ministry of Education and Training (MOET) will be responsible managing Component 2, as well as monitoring and reporting on the project as a whole. The eLibrary Portal subcomponent will be managed by the National Economic University (NEU) on behalf of MOET.","http://d-portal.org/q.html?aid=44000-P156849"],
    [1601,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",20.8,106.667,"Thanh Pho Hai Phong",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1602,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",18.333,105.75,"Tinh Ha Tinh",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1603,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",17.5,106.333,"Tinh Quang Binh",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1604,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",21.25,107.333,"Tinh Quang Ninh",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1605,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",16.75,107,"Tinh Quang Tri",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1606,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",20.067,105.333,"Tinh Thanh Hoa",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1607,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","",16.333,107.583,"Tinh Thua Thien-Hue",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1608,150000000,199470000,133581000,117175000,"2023-12-31T00:00:00",2406,"2017-05-30T00:00:00","A",19.25,104.917,"Tinh Nghe An",0,0,0,0,"Implementation","Forest Sector Modernization&Coastal Re","The development objective of the Forest Sector Modernization and Coastal Resilience Enhancement Project for Vietnam is to improve coastal forest management in the Project Provinces. The project has three technical components in addition to a fourth component on project management, monitoring, and evaluation. The first component modernizes the technical know how and approaches used for planning, supplying seedlings, and financing coastal protection forest management and planting. The second component adopts a holistic approach that links the biophysical, physical, and management interventions for managing and planting mangroves and sandy soil forests. The third component focuses on augmenting the economic benefits derived from well-protected coastal forests, with the aim of reducing pressure to convert these natural systems. Component 1 will be implemented at the central level. Components 2 and 3 will be implemented at the sub national (provincial, district, and commune) level. The first component consists of three sub-components, a) modernizing coastal forest planning, b) expanding quality seedling production, and c) broadening payments for forest ecosystem services to coastal forests; The second component consists of two sub-component, a) planting and managing target coastal protection forests,and b) protection of planting areas with physical measures; The third component consists of two sub-component, a) investment packages for generating benefits from coastal forests, and b) demand driven productive infrastructure; The fourth component, project management and M&E will cover all the costs associated with project management and monitoring and evaluation (M&E). It will be divided into two subcomponents, the first focused on project management and the second cover M&E, safeguards quality assurance and the independent audit.","http://d-portal.org/q.html?aid=44000-P157127"],
    [1609,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.948,108.846,"Ta Giang",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1610,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",14.039,108.25,"Kon Dong",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1611,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.805,107.696,"Chu Ty",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1612,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.757,107.886,"Chu Prong",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1613,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.534,108.455,"Ia Pa",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1614,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.775,108.526,"Kong Chro",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1615,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.921,108.612,"Huyen Dak Po",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1616,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",14.066,108.142,"Huyen Dak Doa",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1617,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.995,108.112,"Dak Doa",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1618,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.943,108.88,"Huyen Tay Son",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1619,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.928,108.302,"Huyen Mang Yang",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1620,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.6,107.811,"Huyen Chu Prong",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1621,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.785,107.67,"Huyen GJuc Co",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1622,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.95,108.65,"An Khe",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1623,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.229,108.752,"Prong",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1624,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",14.167,109,"Tinh Binh GJinh",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1625,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",14.1,109.05,"Binh Long",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1626,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","A",13.75,108.25,"Gia Lai",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1627,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.833,107.683,"Le Thanh",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1628,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.983,108.15,"Le Trung",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1629,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.983,108,"Pleiku",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1630,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",13.776,109.224,"Qui Nhon",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1631,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","P",13.817,107.883,"Thanh An",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1632,150000000,199470000,133581000,117175000,"2023-06-30T00:00:00",2108,"2017-09-21T00:00:00","",16.167,107.833,"Socialist Republic of Vietnam",0,0,0,0,"Implementation","Central Highlands Connectivity","The development objective of the Central Highlands Connectivity Improvement Project for Vietnam is to improve the connectivity, safety and climate-resilience of the National Highway 19. The proposed Project will be financed by an IDA credit of US 150 million dollars and counterparts funds of US 3.7 million dollars to finance the following components, and will build on the lessons and results from previous World Bank-financed transport projects while expanding into new areas of engagement to address road safety and climate change. The Project will finance the following  two components. The first component, Road improvements will support the physical improvement of three sections of NH19 including pavement rehabilitation, widening of the road with paved shoulders, widening of lanes and features for the safe sharing of the road by users, including through the addition of dedicated motorcycle lanes, and reinforcement of slopes, to improve road connectivity, safety and to ensure sustainability of road assets. The second component,  implementation support through the following interventions: The provision of technical support for Project implementation, including overall detailed engineering design, construction supervision, financial audits, environmental and social management, and monitoring and evaluation. The Bank will provide enhanced implementation support and technical assistance to both components of the project through Bank-executed activities funded from the Global Facility for Disaster Reduction and Recovery, and the Global Road Safety Program, as described below: a) Bank- executed activities related to road safety supported from the Global Road Safety Program (GRSF) and Bank-executed activities related to climate resilient activities with support from the Global Facility for Disaster Reduction and Recovery (GDFRR).","http://d-portal.org/q.html?aid=44000-P159238"],
    [1633,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","P",9.294,105.728,"Thanh Pho Bac Lieu",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1634,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","P",10.241,106.376,"Ben Tre",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1635,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","",10.386,105.435,"Long Xuyen",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1636,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","P",9.6,105.972,"Soc Trang",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1637,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","",10.536,106.414,"Tan An",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1638,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","",10.254,105.972,"Vinh Long",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1639,240000000,319151000,213730000,187480000,"2023-12-31T00:00:00",2411,"2017-05-25T00:00:00","P",9.784,105.47,"Vi Thanh",0,0,0,0,"Implementation","Scaling up Urban Upgrading Project","The development objective of the Scaling up Urban Upgrading Project for Vietnam is to  improve access to infrastructure in priority city areas and improve urban planning in the participating cities. There are four components. The first component will support tertiary investments in approximately 30 LIAs, covering about 650 ha,including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, constructing septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of metered domestic connections; (v) provision of metered domestic connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, public places and green spaces. The second component provides support to improve priority networked infrastructure in line with the broader city development agenda, and with a view to increasing connectivity of primary and secondary infrastructure with tertiary infrastructure in LIAs. Social infrastructure facilities such as markets, community halls, public places, schools and green spaces will also be included to benefit urban poor, where needed. The third component will include the construction of resettlement areas for affected persons, including construction of primary, secondary and tertiary infrastructure and public facilities. The fourth component will be complemented by a Technical Assistance (TA) package under project management support which is intended to provide implementation support as well as enhance the cities capacity to manage urban development in a risk informed manner, th","http://d-portal.org/q.html?aid=44000-P159397"],
    [1640,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.457,106.029,"Tan Thinh",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1641,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","P",21.445,106.041,"Tan Lap",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1642,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.592,105.854,"Phuong Tuc Duyen",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1643,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.586,105.84,"Phuong Phan Dinh Phung",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1644,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.591,105.82,"Phuong Quang Trung",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1645,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.574,105.849,"Phuong Gia Sang",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1646,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.624,105.842,"Chua Hang",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1647,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.612,105.85,"Xa GJong Bam",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1648,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.586,105.874,"Xa Huong Thuong",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1649,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.467,105.767,"Ben Dong",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1650,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.717,105.767,"Dan Khe",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1651,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","P",21.633,105.65,"Hung Son",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1652,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.6,105.817,"Quang Vinh",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1653,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.483,105.917,"Quan Trang",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1654,80000000,105024000,68505000,60189400,"2023-12-31T00:00:00",2235,"2017-11-17T00:00:00","",21.567,105.817,"Thinh Dan",0,0,0,0,"Implementation","DCIDP-Thai Nguyen","The development objective of the Dynamic City Integrated Development Project for Vietnam is to improve access to urban infrastructure and to improve integrated urban planning and management in the project city. It has two components. First component, structural investments - rehabilitation and construction of urban infrastructure a series of municipal investments will be financed to improve the access to and quality of critical urban infrastructure services, including those in urban environmental sanitation, urban transport, and urban amenities. The selection of infrastructure sub-projects will be aligned with the updated city master plan. However, given that the sub-projects will be identified based on plans developed before project implementation, the proposals will be rigorously prioritized to ensure that these are no-regret investments that: (i) improve access to, and reliability of, urban services for the bottom 40 percent of the population; (ii) promote more compact and denser urbanization; (iii) promote the development of neighborhoods with access to high-quality public spaces and public transport; (iv) support long-term socio-economic growth objectives; (v) meet demands for climate change adaptation; and (vi) meet accepted standards for technical and economic soundness, including resilience measures to limit the potential losses from disasters; This component has four sub-component. (i) urban drainage; (ii) urban environmental sanitation; (iii) urban transport and (iv) urban amenities and public spaces; Second component, non-structural investments - technical assistance and implementation support a comprehensive package of TA and project implementation support will be provided to Thai Nguyen PPC to strengthen its capacities for integrated economic and spatial planning as well as climate change and disaster risk informed planning. The TA will ensure the strateg","http://d-portal.org/q.html?aid=44000-P160162"],
    [1655,118000000,156916000,105084000,92177500,"2021-12-31T00:00:00",1695,"2017-05-11T00:00:00","",14.167,109,"Tinh Binh GJinh",0,0,0,0,"Implementation","VN-Disaster Reconstruction Project","The development objective of the Emergency Flood Disaster Reconstruction Project for Vietnam is to reconstruct and rehabilitate infrastructure assets in disaster affected project provinces and strengthen the capacity of the government to effectively respond to future disaster events. The project comprises of three components. The first component, resilient reconstruction of damaged public use and preventive infrastructure at the provincial level objective is to strengthen resilience of flood???affected communities in five selected provinces through the reconstruction and rehabilitation of damaged critical provincial???scale infrastructure, especially irrigation, flood control, and road and bridge infrastructure. It consists of following sub-components: (i) resilient reconstruction in Binh Dinh province; (ii) resilient reconstruction in Phu Yen province; (iii) resilient reconstruction in Quang Ngai province; (iv) resilient reconstruction in Ninh Thuan province; and (v) resilient reconstruction in Ha Tinh province. The second component, disaster recovery capacity enhancement objective is to strengthen the institutional capacity of the government at the central and provincial levels to respond to future disasters. The third component, project management support objective is to support project management, safeguards, audits, and monitoring and evaluation (M and E).","http://d-portal.org/q.html?aid=44000-P163146"],
    [1656,118000000,156916000,105084000,92177500,"2021-12-31T00:00:00",1695,"2017-05-11T00:00:00","",18.333,105.75,"Tinh Ha Tinh",0,0,0,0,"Implementation","VN-Disaster Reconstruction Project","The development objective of the Emergency Flood Disaster Reconstruction Project for Vietnam is to reconstruct and rehabilitate infrastructure assets in disaster affected project provinces and strengthen the capacity of the government to effectively respond to future disaster events. The project comprises of three components. The first component, resilient reconstruction of damaged public use and preventive infrastructure at the provincial level objective is to strengthen resilience of flood???affected communities in five selected provinces through the reconstruction and rehabilitation of damaged critical provincial???scale infrastructure, especially irrigation, flood control, and road and bridge infrastructure. It consists of following sub-components: (i) resilient reconstruction in Binh Dinh province; (ii) resilient reconstruction in Phu Yen province; (iii) resilient reconstruction in Quang Ngai province; (iv) resilient reconstruction in Ninh Thuan province; and (v) resilient reconstruction in Ha Tinh province. The second component, disaster recovery capacity enhancement objective is to strengthen the institutional capacity of the government at the central and provincial levels to respond to future disasters. The third component, project management support objective is to support project management, safeguards, audits, and monitoring and evaluation (M and E).","http://d-portal.org/q.html?aid=44000-P163146"],
    [1657,118000000,156916000,105084000,92177500,"2021-12-31T00:00:00",1695,"2017-05-11T00:00:00","",13.167,109.083,"Tinh Phu Yen",0,0,0,0,"Implementation","VN-Disaster Reconstruction Project","The development objective of the Emergency Flood Disaster Reconstruction Project for Vietnam is to reconstruct and rehabilitate infrastructure assets in disaster affected project provinces and strengthen the capacity of the government to effectively respond to future disaster events. The project comprises of three components. The first component, resilient reconstruction of damaged public use and preventive infrastructure at the provincial level objective is to strengthen resilience of flood???affected communities in five selected provinces through the reconstruction and rehabilitation of damaged critical provincial???scale infrastructure, especially irrigation, flood control, and road and bridge infrastructure. It consists of following sub-components: (i) resilient reconstruction in Binh Dinh province; (ii) resilient reconstruction in Phu Yen province; (iii) resilient reconstruction in Quang Ngai province; (iv) resilient reconstruction in Ninh Thuan province; and (v) resilient reconstruction in Ha Tinh province. The second component, disaster recovery capacity enhancement objective is to strengthen the institutional capacity of the government at the central and provincial levels to respond to future disasters. The third component, project management support objective is to support project management, safeguards, audits, and monitoring and evaluation (M and E).","http://d-portal.org/q.html?aid=44000-P163146"],
    [1658,118000000,156916000,105084000,92177500,"2021-12-31T00:00:00",1695,"2017-05-11T00:00:00","",15,108.667,"Tinh Quang Ngai",0,0,0,0,"Implementation","VN-Disaster Reconstruction Project","The development objective of the Emergency Flood Disaster Reconstruction Project for Vietnam is to reconstruct and rehabilitate infrastructure assets in disaster affected project provinces and strengthen the capacity of the government to effectively respond to future disaster events. The project comprises of three components. The first component, resilient reconstruction of damaged public use and preventive infrastructure at the provincial level objective is to strengthen resilience of flood???affected communities in five selected provinces through the reconstruction and rehabilitation of damaged critical provincial???scale infrastructure, especially irrigation, flood control, and road and bridge infrastructure. It consists of following sub-components: (i) resilient reconstruction in Binh Dinh province; (ii) resilient reconstruction in Phu Yen province; (iii) resilient reconstruction in Quang Ngai province; (iv) resilient reconstruction in Ninh Thuan province; and (v) resilient reconstruction in Ha Tinh province. The second component, disaster recovery capacity enhancement objective is to strengthen the institutional capacity of the government at the central and provincial levels to respond to future disasters. The third component, project management support objective is to support project management, safeguards, audits, and monitoring and evaluation (M and E).","http://d-portal.org/q.html?aid=44000-P163146"],
    [1659,118000000,156916000,105084000,92177500,"2021-12-31T00:00:00",1695,"2017-05-11T00:00:00","",11.75,108.833,"Tinh Ninh Thuan",0,0,0,0,"Implementation","VN-Disaster Reconstruction Project","The development objective of the Emergency Flood Disaster Reconstruction Project for Vietnam is to reconstruct and rehabilitate infrastructure assets in disaster affected project provinces and strengthen the capacity of the government to effectively respond to future disaster events. The project comprises of three components. The first component, resilient reconstruction of damaged public use and preventive infrastructure at the provincial level objective is to strengthen resilience of flood???affected communities in five selected provinces through the reconstruction and rehabilitation of damaged critical provincial???scale infrastructure, especially irrigation, flood control, and road and bridge infrastructure. It consists of following sub-components: (i) resilient reconstruction in Binh Dinh province; (ii) resilient reconstruction in Phu Yen province; (iii) resilient reconstruction in Quang Ngai province; (iv) resilient reconstruction in Ninh Thuan province; and (v) resilient reconstruction in Ha Tinh province. The second component, disaster recovery capacity enhancement objective is to strengthen the institutional capacity of the government at the central and provincial levels to respond to future disasters. The third component, project management support objective is to support project management, safeguards, audits, and monitoring and evaluation (M and E).","http://d-portal.org/q.html?aid=44000-P163146"]
]}
