Chapter 4: Existing environmental resources (4)
The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.
Additional Information
Field | Value |
---|---|
Last updated | 2021၊ 3 စက်တင်ဘာ |
Created | 2021၊ 9 ဇူလိုင် |
ပုံစံ | |
လိုင်စင် | Creative Commons Attribution Share-Alike |
အမည် | Chapter 4: Existing environmental resources (4) |
Resource's languages |
|
ဖော်ပြချက် | The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port. |