-
Webpage capture on Siem Reap 38-road project sees progress during tourism lull
The 38-road project in Siem Reap is seeing significant progress since its groundbreaking in late November 2020. The infrastructure project is constructing and rehabilitating roads in the city along with building and repairing rainwater drainage and wastewater purification systems.
Additional Information
Field | Value |
---|---|
Last updated | 2021၊ 18 ဩဂုတ် |
Created | 2021၊ 18 ဩဂုတ် |
ပုံစံ | |
လိုင်စင် | Attribution-NonCommercial-ShareAlike 3.0 IGO (CC BY-NC-SA 3.0 IGO) |
အမည် | Webpage capture on Siem Reap 38-road project sees progress during tourism lull |
ဖော်ပြချက် |
The 38-road project in Siem Reap is seeing significant progress since its groundbreaking in late November 2020. The infrastructure project is constructing and rehabilitating roads in the city along with building and repairing rainwater drainage and wastewater purification systems. |
Resource's languages |
|