[Draft] Initial Environment and Social Impact Assessment on quarry business of Black Diamond Stone SJC Co., Ltd
Published by: Open Development Cambodia
Data Resources (1)
Data Resource Preview - [Draft] Initial Environment and Social Impact Assessment on quarry business of Black Diamond Stone SJC Co., Ltd
Additional Info
Field | Value |
---|---|
Geographic area (spatial range) |
|
Topics | Environmental impact assessments |
Document type | Environmental Impact Assessment |
Contracting Parties |
|
Government Entity (multiple) |
|
Disclosure Mode | Released by company |
License |
No license given |
Copyright | No |
Access and use constraints |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use. |
Version / Edition | 1 |
Language of document |
|
Province(s) |
|
Metadata Reference Information |
Metadata last updated on 2024-08-06. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net |
Signature date | September 14, 2017 |
Contact |
SBK Research and Development Co., Ltd. Address: No. 43, Street 317, Corner of Street 572, Sangkat Boeng Kak Ti Pir, Khan Tuol Kouk, Phnom Penh. Tel: (855-61) 33 8888 Email: khnhelbora@gmail.com |
Granted area | 30.0 |
Land use planning | 30 |
Land use planning unit | Ha |
Party's obligation in the implementation of the project |
According to the project owner's estimate, the potential of the quarry in the project site is 20 ha, with a total battery volume of 6,000,000 m3 (usable battery is 1,200,000 m3). Meanwhile, the operation period is estimated at 60 years. Height 5 m. And leave a width of 7 m. According to the actual situation, to be the way down to the quarry. |
Job creation summary |
In order to operate this stone business, the company needs a total of 60 employees/workers (05 foreign employees, Vietnamese), of which 27 permanent employees/workers are on site and 33 temporary employees. |
Number of created jobs | 60.0 |
Training summary |
The Company recognizes that it is important to train employees/workers at all levels to understand their roles and responsibilities to the environment and society. |
Environmental protection obligation |
The company has mitigation measures such as: on soil degradation, air quality, vibration sound, groundwater quality, groundwater quality and soil quality, protect forests and wildlife |
Socio-cultural protection |
• The company plans to cooperate with local authorities in educating and instructing employees and workers to respect and love each other's traditions, culture, and religion, especially the beliefs of the local people. • The company is cooperating with competent departments and relevant local authorities to determine the boundaries of the project site before clearing the land. • The company is preparing a social fund budget of USD 22,000/10 years for the construction and repair of schools, health channels, monasteries, and roads, drilling pump wells (05 wells in Roveang Chey village and 05 wells in Sameakki village), digging ponds, providing cooking tanks, etc. |
Fiscal duties summary |
Profit tax 30%: USD 118 440 (in 2018), USD 158 040 (in 2019), USD 158 040 (in 2020), USD158 040 (in 2021) |
Environmental fund summary |
The company is obliged to implement and be responsible for a number of rules, such as: (1) developing the local community (building physical infrastructure, health centers, schools, training, and providing jobs to the citizens in the area who are employed); and (2) taking collective social responsibility (safety protection in the mine, environmental protection, allocation of restoration funds, restoration of wells, restoration of wells to an appropriate condition, etc.). |
Total amount of environmental funds | 50000.0 |
Legacy reference document | Draft_IESIA_Black_Diamond_Stone_SJC__14.09.2017.pdf |
Keywords | IESIA,BLACK DIAMOND STONE SJC,EIA,Environment Impact Assement,Kratie,SBK RESEARCH ADN DEVELOMENT,Initial Environment and Social Impact Assessment,quarry business |
Open Contracting Identifier | ocds-miumsd-7b13d938-d91a-46be-a772-4fa05880bf61 |
Date uploaded | August 6, 2024, 07:09 (UTC) |
Date modified | January 30, 2025, 04:03 (UTC) |