Skip to content

Grid Emission Factors in Cambodia

The calculation approach in this report adopts the CDM tool “Tool to calculate the emission factor for an electricity system” version 4.0. (hereafter referred to “ the tool”). The tool for calculating the baseline is comprised of the following six steps; Step 1: identify the relevant electricity systems, step 2: choose whether to include off-grid power plants in the project electricity system (optional), step 3: select the method to determine the operating margin (OM), Step 4: calculate the operating margin emission factor according to the selected method, step 5: calculate the build margin (BM) emission factor, step 6: calculate the combined margin (CM) emissions factor.

Data Resources (1)

Data Resource Preview - Grid Emission Factors in Cambodia

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Topics
  • Development and funding for electricity
  • Electricity production
  • Environmental impact assessments
Geographic area (spatial range)
  • Cambodia
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1.0
License unspecified
Contact
  • Institute for Global Environmental Strategies (IGES) 2108-11 Kamiyamaguchi, Hayama, Kanagawa 240-0115, Japan, Telephone: +81-(0)46-855-3700, Fax: +81-(0)46-855-3709, website: http://www.iges.or.jp

  • National Council for Sustainable Development, Cambodia Address: #48, Samdech Preah Sihanouk Blvd, Tonle Bassac, Chamkarmon, Phnom Penh, Kingdom of Cambodia, Telephone/Fax: +855-23-218-370, website: http://www.camclimate.org.kh

Author (corporate) National Council for Sustainable Development, Ministry of Envirionment
Co-author (coorporate) Institute for Global Environmental Strategies (IGES)
Publication place Cambodia
Publisher Ministry of Environment
Publication date 2016
Pagination 19
General note

This document has detail information about electricity plants and imports in national grid.

Legacy reference document MOE_Grid_Emission_Factor__01.03.2016.pdf
Keywords electricity,electricity plant,grid
Date uploaded May 10, 2017, 06:30 (UTC)
Date modified July 31, 2020, 04:00 (UTC)