Skip to content

Lower Sesan II hydropower project

The Lower Sesan 2 (LS2) hydropower project​ has installed capacity of 400MW, with a height of 75 meters and length of 6 kilometers. It will be implemented in Sesan district, Stung Treng province. Despite the environmental impact assessment (EIA) falling to meet international best practice, Cambodia's cabinet approved the project in late 2012. With the total estimated cost of US$ 781 million, most of which was allegedly reported from China's bank loans, the project is running under 40-years "built-operate-transfer"(BOT) concessional contract.

Data Resources (1)

Data Resource Preview - Lower Sesan II hydropower project

Additional Info

Field Value
စာတမ်းအမျိုးအစား Reports, journal articles, and research papers (including theses and dissertations)
စာရွက်စာတမ်း၏ ဘာသာစကား
  • အင်္ဂလိပ်ဘာသာစကား
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
မူပိုင်ခွင့် Yes
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1.0
ခွင့်ပြုချက် CC-BY-SA-4.0
ဆက်သွယ်ရန်

Mekong Watch Address: 3F AOKI Bldg. 1-12-11 Taito, Taito-ku, Tokyo 110-0016, Japan Contact: Tel: +81 3 3832 5034, Fax: +81 3 3832 5039 Website: http://www.mekongwatch.org/english/index.html E-mail: info@mekongwatch.org

ရေးသားသူ (အဖွဲ့) Mekong Watch
ထုတ်ဝေသည့်နေရာ Tokyo
ထုတ်ဝေသူ Mekong Watch
ထုတ်ဝေသည့်ရက်စွဲ 2015
စာမျက်နှာခွဲ 1
ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Mekong_watch_lower_sesan2_16.02.2015.pdf
တင်ခဲ့သည့်ရက်စွဲ ဖေဖော်ဝါရီ 26, 2016, 03:42 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ ဇူလိုင် 22, 2024, 03:09 (UTC)