[Draft] Environmental impact assessment for feasibility study of Lower Sesan 2 hydropower project, Stung Treng province, Cambodia

The project will have an installed capacity of 400 MW to supply electricity to the surrounding provinces as well as for export to Vietnam. The project is Build Operate and Transfer (BOT) type and the investment cost is USD 816.23 million. The main dam length is 8km with crest 83m above the sea level and about 40m above the river. There are 5 turbine units with a capacity of 80MW each.

Data Resources (13)

Data Resource Preview - Table of content

Additional Info

Field Value
ပထဝီဧရိယာ (spatial range)
  • ကမ္ဘောဒီးယား
ခေါင်းစဉ်များ
  • Hydropower dams
  • SDG15 Life on Land
  • SDG7 Affordable and Clean Energy
စာရွက်စာတမ်းအမျိုးအစား Environmental Impact Assessment
စာချုပ်ချုပ်ဆိုသော အဖွဲ့အစည်းများ
  • Electricity of Vietnam
သက်ဆိုင်ရာ အစိုးရ (မျိုးစုံ)
  • Minister of Mines and Energy
ထုတ်ဖော်ဖွင့်ပြမှု နည်းလမ်း အစိုးရမဟုတ်သည့်ပြည်တွင်းအဖွဲ့အစည်းများမှထုတ်ပြန်ခြင်း (LNGOs)
ခွင့်ပြုချက် unspecified
မူပိုင်ခွင့် No
ရယူခြင်းနှင့် အသုံးပြုခြင်း အကန့်အသတ်များ

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ပြင်ဆင်ချက် 1
စာရွက်စာတမ်း၏ ဘာသာစကား
  • အင်္ဂလိပ်ဘာသာစကား
နယ်ပယ်
  • Stung Treng
Metadata ကိုရည်ညွှန်းသော သတင်းအချက်အလက်

Metadata last updated on 2018-08-03. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

ဆက်သွယ်ရန်

Key Consultants Cambodia

Room no. 684, 6th floor, Building F, Phnom Penh center, Preah Sihanouk Blvd, Khan Chamkarmon, Phnom Penh

စာချုပ်ကာလ 37.0
စာချုပ်ကာလ ယူနစ် နှစ်များ
အလုပ်အကိုင်ဖန်တီးပေးနိုင်မှု အကျဉ်းချုပ်

It will need a peak workforce of 3000 people during the four years of construction period.

ဖန်တီးပေးနိုင်သည့် အလုပ်အကိုင်အရေအတွက် 3000.0
ပတ်ဝန်းကျင်ကာကွယ်ရေးဆိုင်ရာ ဝတ္တရား

The company has obligations to mitigate the environmental impact of its project implementation to the maximum. The encroachment to the forest/habitat and hunting of the wildlife are strictly banned. Appropriated mean to maintain fish and other aquatic life re-appearance as existing by creating fish research center. Regularly control the water quality in the reservoir to avoid adverse effect.

လူမှု-ယဉ်ကျေးမှုဆိုင်ရာ ကာကွယ်မှု

Appropriate training course or new skilled and income restoration shall be provided to the local people (boat operators and fishermen). The compensation can be provided in strengthening livelihood program such as new career capacity building, small business fund providing, agricultural support programs.

ပတ်ဝန်းကျင်ဆိုင်ရာရန်ပုံငွေ အကျဉ်းချုပ်

The annual environmental fund is proposed USD 0.5 million and it will be paid yearly to the Ministry of Environment and Forestry Administration of Royal Government of Cambodia to compensate to the forest and wildlife habitat lost by the project. The MoE and FA will use this fund to support forest and wildlife conservation program in the area. This payment is applied to the whole project operation.

ဆက်စပ်သော စာရွက်စာတမ်းများ
  • Law on Land (2001)
  • Law on Forestry
  • Law on Water Resource​​ Management of the Kingdom of Cambodia
  • Sub-Decree No. 27 on Water Pollution Control
  • Sub-Decree No.72 on the Environmental Impact Assessment Process
  • Law on Environmental Protection and Management of Natural Resources
  • The Constitution of the Kingdom of Cambodia (2008)
ဆက်စပ်သော စီမံကိန်း

Lower Sesan II: https://data.opendevelopmentcambodia.net/en/dataset/hydropower-2009-2014/resource/4e6d2d95-80e3-4459-ae09-1b9214746c59/detail?map_id=4

ဆက်ခံရရှိကြောင်းညွှန်းဆိုသည့်စာတမ်း Draft_EIA_Lower_Sesan_2__01.10.2008.pdf
အဓိကစကားလုံးများ lower,sesan
Open Contracting Identifier ocds-miumsd-a3fb3508-0270-4249-bdcb-e57d357bc9cc
တင်ခဲ့သည့်ရက်စွဲ ဧပြီ 10, 2019, 09:35 (UTC)
ပြန်လည်ပြင်ဆင်သည့်ရက်စွဲ အောက်တိုဘာ 5, 2022, 07:11 (UTC)